East Central Railway Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

East Central Railway - ECR Tender

Works
Energy, Oil and Gas
Ireps
Opening Date12 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 9,15,26,017.72 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
( b ) Erection:-

28

595

16668.68

... More
Supply and erection of double termination assembly conventional type Regulated OHE ( a ) Supply:- 4

-

-

4

... More
( b ) Erection:-

28

727

20369.72

... More
Supply and erection of Regulating Equipment ( 3 pully type ) with counterweight assembly for regulated conventional OHE (a) Supply 5

28

54972

1539238.96

... More
( b ) Erection:-

28

3120

87381.28

... More
Provision (Supply and Erection) of various item for sucessful erection and 6 commissioning of feeder wire. 1) supermast cross arm ISA 65x65x5. 2) provision of suspension support. 3) provision of 18 mm single clevis .4) provision of large suspension clamp. 5) provision of batten plate.6) provision of snap Head pin with washer and split pin. 7) provision of bolt (M-16) 50/38 wth nuts, lock nut.

250

17013

4253345

... More
Supply of material for provision of solid core suspension insulator with all accessories for feeder wire . (a) Supply 7

250

9787

2446915

... More
( b ) Erection:- 8

250

1221

305495

... More
Supply of aluminium 25 kv feeder wire (a) Supply 8

10

188028

1880284.3

... More
( b ) Erection:-

10

19288

192884.2

... More
Supply of bimetallic parallel clamp to avoid direct connection between aluminium feeder and copper jumper (a) Supply 9

20

280

5608.4

... More
( b ) Erection:- 10

20

28

574.6

... More
Supply of material for provision of termination assembly for feeder wire (a) Supply 10

20

10875

217513.6

... More
( b ) Erection:- 11

20

1134

22692.2

... More
Supply and erection of structure bond ( a ) Supply:- 11

350

523

183172.5

... More
(b ) Erection:- 12

350

130

45626

... More
Supply and erection of Rail bond ( a ) Supply:- 12

120

444

53291.52

... More
( b ) Erection:- 13

120

111

13382.4

... More
Supply and erection of number plate ( a ) Supply:- 13

350

739

258783

... More
( b ) Erection:- 14

350

127

44485

... More
Supply and erection of inter track bond ( a ) Supply:- 14

120

803

96381.6

... More
( b ) Erection:- 15

120

128

15458.4

... More
Supply and erection of caution board ( a ) Supply:- 15

10

1194

11947

... More
( b ) Erection:- 16

10

166

1669.9

... More
Supply laying of earth leads 75x8mm MS flat in ground (a)Supply

10

292

2921.5

... More
(b) Erection:- 17

10

65

653.2

... More
Supply and erection of earth electrodes with earthing stations . (a)Supply 17

10

3488

34885.2

... More
( b ) Erection:-

10

1491

14915

... More
Supply of Retro reflective sigma sign board as per RDSO Specification No- ETI/OHE/33A(12/97) Rev-8 (11/2012) and Drg No- TI/DRG/OHE/PLTBRD/RDSO/00036/12/0

5

896

4484

... More
Erection of Burried rail including Tin plated copper bush 02 nos. 20mm dia copper rivet- 08 nos. primar painting and painting of burried rail and MS flat.

2

32000

64000

... More
Supply of Retroreflective type Danger Board LC gate as per RDSO Drg.No. - ETI/C/0069. Mod - C & Specification No. - ETI/OHE/33A (12/97) Rev. 8 (Hindi & English)

5

1510

7552

... More
Supply of Retroreflective type ENGINE STOP BOARD of of SIZE: 900 X 600M for 25KV on AL alloy including fixture and fasteners as per RDSO DRG.NO.ETI/OHE/33A/(12/97), REV- 8(11/2012), DRG.NO.ETI/OHE/P/7572

4

2183

8732

... More
Supply and erection of stay insulator ( a ) Supply:- 1

350

4207

1472478

... More
( b ) Erection:- 2

350

242

84987

... More
Supply and erection of Bracket Insulator ( a ) Supply:- 2

350

4123

1443235.5

... More
( b ) Erection:-

350

234

81945.5

... More
Supply and erection of 25 KV single pole isolator with tie rod insulator but without earth contact assembly( a ) Supply:- 3

10

48376

483769.2

... More
( b ) Erection:- 4

10

2145

21455.29

... More
Supply and erection of 25 KV Post Insulators ( a ) Supply:- 4

16

9080

145293.28

... More
( b ) Erection:- 5

16

368

5894.72

... More
Supply and erection of 9 Ton/ solid core Insulators ( a ) Supply:- 5

60

4890

293412.6

... More
( b ) Erection:-

60

533

32038.2

... More
Supply and erection of anticreep with Galvanized Steel wire suitable for regulated conventional OHE (without Insulator). (a) Supply 1

14

22247

311471.86

... More
( b ) Erection:- 2

14

2799

39196.92

... More
erection of copper contact wire .( b ) Erection:- 3

15

27784

416765.85

... More
erection of cadmium copper catenary wire .( b ) Erection:- 4

15

27784

416765.85

... More
Supply and erection of Large copper jumper (160 sqmm) ( a ) Supply:- 4

60

7890

473426.82

... More
( b ) Erection:- 5

60

298

17896.2

... More
Supply and erection of small copper jumper (50sqmm) ( a ) Supply:- 5

100

4163

416398

... More
( b ) Erection:- 6

100

266

26697

... More
Supply and erection of dropper ( a ) Supply:- 6

350

731

255951.5

... More
( b ) Erection:-

350

116

40712

... More
Supply and erection of section insulator assembly ( without insulator ) suitable for regulated conventional OHE (a) Supply 7

20

48185

963717.8

... More
( b ) Erection:- 8

20

3681

73629.4

... More
Supply and erection of solid copper bus bar 18mm ( a ) Supply:- 8

50

1309

65450.75

... More
( b ) Erection:- 9

50

119

5972

... More
Supply and erection of solid copper bus bar connector (Bus terminal). ( a ) Supply:- 9

8

2380

19045.12

... More
( b ) Erection:- 10

8

20

164.32

... More
Supply and erection of solid copper bus bar connector (Bus splice). ( a ) Supply:- 10

8

2956

23651.19

... More
(b) Erection:- 11

8

31

250.4

... More
Supply and erection of large span cadmium copper wire (130 sqmm) ( a ) Supply:- 11

1500

967

1451070

... More
(b) Erection:-

1500

15

22740

... More
Supply of 25 KV / 230 V, 10 KVA LT supply Transformer (a) Supply 1

4

89349

357399.04

... More
( b ) Erection:- 2

4

3678

14712.96

... More
Supply erection of 25 KV Drop out fuse switch assembly. (a) Supply 2

4

19621

78484.16

... More
( b ) Erection:-

4

1580

6321.16

... More
2corx50sqmm PVC, XLPE Armoured(AYRY) insulated Aluminium conductor cable 1100V ISI:554/1/88 (a) Supply 3

4000

295

1180360

... More
(b) Laying

4000

138

554520

... More
Supply & fixing of Tata/Jindal or any ISI marked medium gauge GI Pipe for protection of cable 100mm Dia 5

1000

1042

1042630

... More
Supply and erection of CLS panel suitable for 10KVA LT supply transformer. 6

4

43254

173017.88

... More
Supply and erection of anticlimbing device

4

4488

17953.4

... More
Supply,fixing,connection and testing of AT output points consisting of 01 No. ICTPN 63 Amps switch enclosed in MS hinged box with locking arrangement.

-

-

7

... More
Preparation of design and drawing ----- For foot survey and preparation of OHE pegging plan.

-

-

1

... More
Preparation of design and drawing with foot patrolling for overhead equipments, sectioning and SED including switching stations

-

-

1

... More
Preparation of SWR diagram board and fixing at different locations including modification in existing diagram.

-

-

1

... More
Excavation and casting foundation and plinth by Concrete in other than hard soil and rocky soil

1500

5902

8853585

... More
Loading, Unloading and Transportation of Railway supply materials (Contact wire, Catenary wire etc.) from Railway stores to work site.

2500

14

36000

... More
(a)Supply of uninterrupted power supply for antitheft charging in OHE line in night 1 from 19:00 hrs to 05:00 hrs. for 05 months (220 Volts/2.2KVA AT will be arranged by tenderer). Hiring charge of 6/5KVA 220 volt single phase DG set including starter , distribution board containing MCB, ammter/Voltmeter Buzzer 03 nos. clolor light bulb & lit kat fuse with operator and maintenence . 06 set DG set for 05 months (3X5=15)

15

21803

327045

... More
(b) Supply of uninterrupted power supply for antitheft charging in OHE line in night from 19:00 hrs to 05:00 hrs. for 05 months (220 Volts/2.2KVA AT will be arranged by tenderer). Running cost of DG with supply of fuel and other consumables.( 3X12X30X05)5400 Hrs.

5400

189

1023796.8

... More
Supply of 01 (One) no. non AC road vehicle (Tata Sumo/Scorpio/ Bolero or similar) on hire for 05 months, 24X7 hrs/day and 3000km per month for RPF patrolling for BEHS-Barbigha line section.

6

52783

316698

... More
Preparation of design & Drawing of switching station.

1

13219

13219

... More
Supply & Erection of traction masts, main masts of switching stations, Including fabricated structure for feeder A.T (a) Supply. 2

10

92157

921570

... More
(b) Erection 3

10

4677

46770

... More
Supply and erection of Fabricated steel work other than mast. (a) supply 3

5

96213

481065

... More
( b ) Erection:-

5

5870

29350

... More
Erection of burned rail (13 mtr. Long, 52 Kg) including supply of tin plated copper bus- 02, 20mm dia copper revet 08 Nos and primer painting and painting of burned rail and MS flat.

-

-

4

... More
Excavation and casting of foundation and plinth by Concrete in other than hard soil and rockey soil. (1:3:6)

100

5902

590239

... More
Supply and erection of 25 KV single pole isolator with tie rod insulator but without earth contact assembly ( a ) Supply:- 6

2

48376

96753.84

... More
( b ) Erection:- 7

2

2145

4291.06

... More
Supply and erection of 25 KV Post Insulators ( a ) Supply:- 7

20

9080

181616.6

... More
( b ) Erection:- 8

20

368

7368.4

... More
Supply and erection of Large copper jumper (160 sqmm) ( a ) Supply:- 8

8

7890

63123.58

... More
( b ) Erection:- 9

8

298

2386.16

... More
Supply and erection of copper feeder/cross feeder (37/2.25mm HDBC). (a) Supply:- 9

0.5

-

632138.5

... More
(b) Erection:- 10

0.5

-

10327.46

... More
Supply and erection of solid copper bus bar 18mm ( a ) Supply:- 10

50

1309

65450.75

... More
( b ) Erection:- 11

50

119

5972

... More
Supply and erection of solid copper bus bar connector (Bus terminal). ( a ) Supply:- 11

6

2380

14283.84

... More
( b ) Erection:- 12

6

20

123.24

... More
Supply and erection of solid copper bus bar connector (Bus splice). ( a ) Supply:- 12

6

2956

17738.39

... More
(b) Erection:-

6

31

187.8

... More
Supply, erection, testing & commissioning of 25KV/110 V Potential transformer (Type- II) ( a ) Supply:- 13

3

53815

161445

... More
( b ) Erection:-

3

1412

4236

... More
Supply and erection of double pole isolator complete set including connector, tie rod insulator and interlocking device ( a ) Supply:- 14

3

51486

154458

... More
( b ) Erection:- 15

3

1464

4392

... More
Supply & erection of 42 KV lightning arrester. ( a ) Supply:- 15

3

28373

85119

... More
( b ) Erection:-

3

552

1656

... More
Supply and erection of earth electrode with earthing station as per CEE's approved specification (a) Supply 17

10

3488

34885.2

... More
( b ) Erection:- 18

10

1491

14915

... More
(A)Supply and laying of earth Leads 50X6 mm MS flat in ground. ( a ) Supply:- 18

75

145

10875

... More
(b)Laying 19

75

28

2100

... More
Supply and laying of earth Leads 75x8 mm MS flat exposed ( a ) Supply:- 19

75

188

14100

... More
(b)Laying 20

75

27

2025

... More
Supply & erection of 25 KV vacuum interrupter. ( a ) Supply:- 20

6

596773

3580638

... More
( b ) Erection:- 21

6

2443

14658

... More
Supply of 25 KV , 2000A double pole Circuit breaker (a) Supply 21

2

1073800

2147600

... More
( b ) Erection:-

2

6366

12732

... More
Supply and erection of control & relay panel incorporation Numerical type protective relay for SP suitable for 25 Kv System. 23

2

2044468

4088936

... More
Upgradation in existing SCADA system for additional BMs at existing switching posts. 24

1

22873

22873

... More
Supply and erection of Al bus bar 36mm x 28 mm. (a) Supply 24

100

399

39900

... More
( b ) Erection:- 25

100

45

4500

... More
Supply & erection of TEE connector (6500) ( a ) Supply:- 25

10

1634

16340

... More
( b ) Erection:- 26

10

51

510

... More
Supply and erection of Aluminium bus-bar connector:- Bus splice(6490) ( a ) Supply:- 26

10

1433

14330

... More
( b ) Erection:- 27

10

24

240

... More
Supply and erection of 36/20mm terminal connector (6530) ( a ) Supply:- 27

10

1195

11950

... More
( b ) Erection:- 28

10

39

390

... More
Supply and erection of flexible Al.bus bar connector (6550) ( a ) Supply:- 28

10

3141

31410

... More
( b ) Erection:- 29

10

29

290

... More
Supply and erection of Al.bus bar bolted type connector (6830-1) ( a ) Supply:- 29

10

999

9990

... More
( b ) Erection:-

10

25

250

... More
Supply and erection of Key box (glass in front and locking arrangement, Key ring, Pad lock and hook to be provided) 31

-

-

30

... More
Supply and fixing of shock treatment chart (Bilingual and photo framed) 32

1

352

352

... More
Supply and erection of bimetallic paralel clamp (10/20) ( a ) Supply:- 32

6

1232

7392

... More
( b ) Erection:- 33

6

185

1110

... More
Supply and erection of terminal lug (4500) ( a ) Supply:- 33

6

559

3354

... More
( b ) Erection:-

6

162

972

... More
Supply, erection, testing & commissioning of RTU at SP/SSP control post, modification including modification in SCADA software at RCC with cables & commissioning materials. 35

1

824868

824868

... More
Supply and erection of fencing panels at sub stations. (a)Supply 35

50

1733

86650

... More
( b ) Erection:- 36

50

49

2450

... More
Supply and erection of fencing uprights at sub stations. (a) Supply 36

0.5

-

22437

... More
( b ) Erection:- 37

0.5

-

882

... More
Supply and spreading of gravel 20mm

40

1323

52920

... More
Supply and erection of DC power sourece of 110 V, 40 AH capacity individual power 38 source of 2 volt 40AH, each consisting to above capacity with connector initial charging, jelly covering, vent plug electrolyte level indicators, stand made of teak wood for supproting D.C power source. (a) Supply 38

1

160689

160689

... More
( b ) Erection:-

1

5757

5757

... More
Supply and erection of electronically/digitally controlled with in-built stabilization system for single phase 220V+/-5% input voltage and output of 110V +/-5% ripple free D.C output power source for 40AH, 110V. (a) Supply 39

1

100538

100538

... More
( b ) Erection:- 40

1

3615

3615

... More
Supply and erection of 9 Ton/ solid core Insulators ( a ) Supply:- 40

20

4068

81360

... More
( b ) Erection:-

20

452

9040



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.