Drinking Water And Sanitation Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_DWSD_73767_1Bid Award Id
ViewTender No
e - quotation No 07/2023-24 (2nd call)Tender Authority
Drinking Water And Sanitation Department ViewPurchaser Address
-Website
http://https://jalshakti-ddws.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Cost for supplying labour, tools and tackles for repairing of C/F pump of 10 HP pump set with opening and refitting after repairing with S/F of new rotating unit complete having C.I impeller, shaft, neck ring, bearing, bearing housing etc. all complete with transportation charge.
2
-
-
Cost for supplying, installation and commissioning of motor control panel made of 2 mm thick cubical panel board heat and vermine proof, proper ventilated two coats of appoxy painted comprising of (A) Incoming feeder-
(i) 100 amp MCCB- 01 no.
(ii) 200 amp copper bus bar arrangemen(4pole)
(iii) Phase indicating lamp-03 nos.
(B) Out going feeder- (i) 63 amp MCCB- 02 nos. (ii) Volt meter- 02 nos.
(iii) Amp meter-02 nos. (iv) Pilot lamp- 06 nos.
(v) Selector switch- 04 nos.
(vi) FASD (ml-03) starter-02 nos.
(vii) Single phase preventer-02 nos.
Complete internal wiring with suitable size of copper wire and testing on load.
1
-
-
Cost for supplying and laying of 16 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor.
30
-
-
Cost for supplying and fitting 100 amp change over switch of L&T /Havell’s/C&S make or ISI reputed make.
1
-
-
Raw Water Pumping Plant
-
-
-
Supplying all labour tools and tackles for complete dismantling and opening of 17.5 HP 3 phase VT motor, cutting burnt wire and rewinding super enameled copper wire , insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials.
2
-
-
Cost for repairing of 17.5 HP VT pump make mather and platt supplying and fitting of pump shaft 1 no. top and bottom bush 2 no. intermediate bush 4 nos. lock 4 nos. CI impeller etc. all required materials as per requirement including dismantling and refitting all complete with all labour and tools after deducting the cost of scrap materials.
2
-
-
Cost for supplying, installation and commissioning of motor control panel made of 2 mm thick cubical panel board heat and vermine proof, proper ventilated two coats of appoxy painted comprising of (A) Incoming feeder-
i) 100 amp MCCB- 01 no. ii) 200 amp copper bus bar arrangemen(4pole)
iii) Phase indicating lamp-03 nos.
(B) Out going feeder- (i) 63 amp MCCB- 02 nos. (ii) Volt meter- 02 nos.
iii) Amp meter-02 nos. (iv) Pilot lamp- 06 nos.
(v) Selector switch- 04 nos.
(vi) FASD (ml-03) starter-02 nos.
(vii) Single phase preventer-02 nos.
Complete internal wiring with suitable size of copper wire and testing on load.
1
-
-
Cost for supplying and fitting 100 amp change over switch of L&T /Havell’s/C&S make or ISI reputed make.
1
-
-
Cost for supplying and laying of 16 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor.
30
-
-
(B) Repairing and maintenance of 50 HP C/F motor pump set No-2, 10 HP VT pump set No-1, FASD starter etc. and other allied works at Rural W/S scheme Kuru
-
-
-
Clear Water Pumping Plant
-
-
-
Supplying all labour tools and tackles for complete dismantling and opening of 50 HP 3 phase inducting motor, cutting burnt wire and rewinding super enameled copper wire , insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials (burnt wire wt. 22 Kg approx) for set No-1.
1
-
-
Cost for supplying labour, tools and tackles for repairing of C/F pump of 50 HP pump set No.-1 with opening and refitting after repairing with S/F of new rotating unit complete having C.I impeller, shaft, neck ring, bearing, bearing housing etc. all complete with transportation charge.
1
-
-
Cost for making PCC foundation (1:2:4) ratio size
5 ½" X 3½" X 2½" with as per required size with S.S. foundation bolt nut and spring washer - 6 Nos. size 5/8” X 2½’ long after breaking old existing P.C.C. foundation with all labour and materials for 50 HP pump set.
1
-
-
Complete opening and dismantling with taking out from sump suction system with S/F as same of 5” dia. ms. pipe 15’ ,5” dia.. ,5” dia. ms flange- 6 nos. ,including nut-bolt, rubber insertion, cutting and threading etc. for 50 HP pump set.
1
-
-
Cost for delivery system opening and fitting after S/F of 4” dia. ms pipe – 10’, 4” dia. ms. bend-1 no. ,4” dia. msflange- 4 nos. including nut-bolt, rubber insertion, cutting etc. for delivery system with all labour and tools.
1
-
-
Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb etc required for jointing all suction and delivery pipe etc at site including repairing of sluice valve-2nos and NR valves-2nos.
1
-
-
Cost for supplying and laying of 35 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor.
20
-
-
Cost towards repairing of 50 H.P.(CF) FASD starter by replacing its contactor, relay & Timer and socketing Cu lugs etc .
1
-
-
Raw Water Pumping Plant
-
-
-
Cost of dismantling the motor and taking out bowl assembly from the intake well by supplying all labour, tools and tackles etc at site.
1
-
-
Supplying all labour tools and tackles for complete dismantling and opening of 10 HP 3 phase VT motor, cutting burnt wire and rewinding super enameled copper wire , insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials.
1
-
-
Cost for repairing of 10 HP VT pump make mather and platt supplying and fitting of pump shaft 1 no. top and bottom bush 2 no. intermediate bush 4 nos. lock 4 nos. CI impeller etc. all required materials as per requirement including dismantling and refitting all complete with all labour and tools after deducting the cost of scrap materials.
1
-
-
Making and fitting line shaft coupling
6
-
-
Supplying and fitting intermediate rising main shaft bearing
6
-
-
Cost for S/F of head shaft of S.S. non-magnetic materials as per sample.
1
-
-
Cost for repairing with new making and fitting of stuffing box bush with gland packing tightner of in discharge head 10 HP VT p/sets with all labour and materials.
1
-
-
Cost for S/F of line shaft of S.S. non-magnetic materials as per sample.
3
-
-
Cost of consumable materials such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for jointing all suction and delivery pipe etc at site .
1
-
-
Cost for supplying and laying of 16 mm² x 3 core copper cable PVC insulated and sheathed from panel to starter to motor.
20
-
-
(C) Rewinding of 10 HP and 7.5 HP Submersible motor and pump sets, its panel and other allied works for Raw water supply scheme Senha
-
-
-
Cost towards taken out & then dismantle the 10HP motor for its complete new rewinding after cleaning the stator of 10HP submersible 3phase, 50c/s, 2900rpm working voltage 380/400 volt with all insulating material such as PVC insulated copper wiring kit with all insulating material and assembling the set with cable joining & testing on full load with all labour tool & tackles all complete at site including transportation charge.
1
-
-
Charges for opening of 10HP submersible pump for changing its damaged impellors & steel bus key, coupling & fitting the same & testing all complete.
1
-
-
Cost towards taken out & then dismantle the 7.5HP motor for its complete new rewinding after cleaning the stator of 7.5HP submersible 3phase, 50c/s, 2900rpm working voltage 380/400 volt with all insulating material such as PVC insulated copper wiring kit with all insulating material and assembling the set with cable joining & testing on full load with all labour tool & tackles all complete at site including transportation charge.
1
-
-
Charges for opening of 7.5HP submersible pump for changing its damaged impellors & steel bus key, coupling & fitting the same & testing all complete.
1
-
-
Cost of supplying and laying 6 Sq mm PVC Sheathed flat submersible copper cable of 650 volt grad ISI marked Finolex universal/polycable make in rural water supply scheme for both submersible.
250
-
-
Earth work in excavation ( As per I.S. 3114/1965) for laying of different types and sizes of cables so as to give one meter average cover over the socket of pipe with disposal of excavated earth within initial lead and lift as per specification and direction of Engineer-in-charge.
120
-
-
Earth work in back filling the trenches after laying different types and sizes of cables with earth removed during excavation within initial lead and lift as per specification and direction of Engineer-in-charge.
120
-
-
Supplying and fitting square type volt and amp. meter all complete & also the cost of pump chamber electric wiring work by supplying all switches and other reputed materials etc. all complete.
1
-
-
Earthing with all materials such as 40mm dia. GI pipe 15ft, charcoal, salt and CI plate including all labour tools and tackles etc as per EI rules for both submersible pump set.
2
-
-
Supplying and fitting 250W street Light with all accessories and electrical wiring with materials etc as required for street light.
2
-
-
Supplying and fitting 10HP automatic Airbreak Motor starter make-jeevan/ Bentex/L&T/Havels..
1
-
-
Supplying and fitting 7.5HP automatic Airbreak Motor starter make-jeevan/ Bentex/L&T/Havels.
1
-
-
Charge for fitting of sluice valve, N.R valve with S/F of rubber insertion-4 kg, ¾” dia x 3” long bolt with nut and washer-20 nos. 6” dia MS pipe bend-01 no, flange 6” dia-04 nos cutting and welding of pipe to common header with gas cutter and welding set and making leak proof joint at sit.
2
-
-
Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for joining all suction and delivery pipe etc at site
2
-
-
Supplying all labour tools and tackles for complete dismantling panel board and servicing with supplying and servicing with supplying and fifing volt meter, ampere meter, CT & PT coils, lugs, bus bar, selector switches MCCB as per sample/suitable for pump sets, internal wiring jointing cables with lugs the help of crimping tools including transportation charge etc.
1
-
-
(D) Repairing and maintenance of 40 HP VT pump set no-1, FASD starter etc. and other allied work at Rural W/S scheme Kairo
-
-
-
Raw Water pumping plant
-
-
-
Cost of dismantling the motor and taking out bowl assembly from the intake well by supplying all labour, tools and tackles etc at site.
1
-
-
Supply all labour tools and tackles for complete dismantling & opening 40 HP 3 phase VT motor, cutting burnt wire and rewinding supper enameled copper wire, insulating paper, tape bamboo stick etc. Heating Varnishing and testing on full load at site including transportation charge after deducting the cost of scrap materials.
1
-
-
Cost of repairing of 40 HP VT pump set no-1 supplying fitting of pump shaft 1 No top and bottom bush 2-No. Intermediate bush 4 Nos. lock 4-nos. CI impeller etc. all required materials as per requirement including dismantling and refitting all complete with all labour and tools after deducting the cost of scrap materials.
1
-
-
Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for jointing all suction and delivery pipe etc at site
1
-
-
Cost towards repairing of 40 H.P. VT Pump FASD starter by replacing its contactor, relay & Timer and socketing Cu lugs etc .
2
-
-
Supplying and fitting 45 w led street light at pumping plant. Including its accessories labour, tools and technicians at site etc. all complete
1
-
-
Clear Water Pumping Plant
-
-
-
Supplying and fitting Foot valve 4inch dia. and its washer.
2
-
-
Cost for repairing of FASD starter for 30 HP pump set.
2
-
-
Cost of consumable materials for above mentioned work such as grease, gland packing, packing paper, cotton waste, bulb, rubber insertion, nut bolt etc required for jointing all suction and delivery pipe etc at site
1
-
-
Cost for supplying and erecting of chemical earthing station as per IE rule including the cost of earth pit, 8 SWG copper wire, G.I. pipe all complete with sand, charcoal and salt etc to all electrical in double way wire connection.
1
-
-
Supplying and fitting 45 w led street light at pumping plant. Including its accessories labour, tools and technicians at site etc. all complete
1
-
-
(E) supplying fitting and commissioning 7.5 HP submersible pump motor set and other allied works at Rural W/S scheme Hesal
-
-
-
Supplying, installation and commissioning submersible pump set confirming to IS 8034 and motor confirming to IS 9283 7.5hp.
1
-
-
Cost of S/F of suitable starter panel for 7.5hp submersible pump set-1 no havels/L&T any reputed make.
1
-
-
Supplying and fitting of 3 core 4 sq mm flat flexible submersible cable , copper conductor, pvc insulated and pvc sheathed.
100
-
-
Cost for supplying and fitting change over switch 100 Amp of L&T, Havell’s make ISI mark.
1
-
-
Earthing with all materials such as 40mm dia. GI pipe 15ft, charcoal, salt and CI plate including all labour tools and tackles etc as per EI rules for both submersible pump set.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements