Drinking Water And Sanitation Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Drinking Water And Sanitation Department - DWSD Tender

Works
Eprocure
Opening Date11 Jun 2024
Closing Date18 Jun 2024
Tender Amount₹ 8,05,814 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(i)             From 0 – 50 meter

50

42350

847

... More
(ii)            Form 50 – 150 meter onwards

130

114972

884.4

... More
Supplying all tools, tackles & lowering of 200 mm dia MS ERW casing pipe of 6 mm wall thickness including welding charges, cost of pipe etc. including all taxes, VAT, excise duty, freight charges with inspection charges etc. as applicable, all complete job.

21

36960

1760

... More
Supplying all materials, labours, tools & equipments for fitting & fixing 200 mm dia MS cap over casing pipe complete job.

1

242

242

... More
CIVIL PORTION

-

-

-

... More
supplying all tools, equipment, labours and lowering 32 mm dia G.I. (Medium) suspension pipe in 3 mtr. Length in the drilling bore of tube well etc. all complete job as per direction of E/I.

36

663

18.42

... More
Providing labour for fitting and fixing deep well cylinder jointing materials, chrome leather bucket all tools and plan etc. required for the job for low water level all complete job as per specification and direction of E/I.

1

228

228.69

... More
Providing all labours for fitting and fixing of India Mark II Hand pump including supplying all tools and plants required for the all job complete as per direction of E/I.

1

173

173.91

... More
Supplying all materials, labours and equipment for construction PCC (1:2:4) circular platform around each drilled tube well including 12 mm thich cement plaster (1:4) with neat 5 cement punning over exposed surface as per UNICEF design etc. all complete.

1

8250

8250

... More
Supplying all materials labour and equipment for constructing PCC (1:2:4) drain as per UNICEF design etc. all complete.

3

1475

491.7

... More
Add Extra Item for Supplying tools, labours and materials for painting, numbering and year for construction of T/Well and taking of colour photograph with two or three nearest persons including platform, drain, soak pit and also longitude & latitude, details of T/W such as total depth, casing depth, static water level, drawdown, discharge, strata chart, beneficiary population etc in separate sheet/format all complete as per direction of E/I.

1

500

500

... More
COST OF MATERIALS

-

-

-

... More
Supplying extra Deep well Hand Pump Complete sets with Cylinder Assembly & Connecting Rod (12 Pcs) as per IS : 15500 part-2/2004 (Basic Rate)

1

15400

15400

... More
Cost of 32 mm dia GI pipe (Medium) 3 mtr. long screwed at both ends with seamless socket as per IS : 1239 (Part 1990) including all taxes, royalty and contractor profit etc.

36

11880

330

... More
Provision & supplying of suitable arrangement of M.S. Plate or reducer socket for installation of Extra Deep well Hand Pump (I.M.-II) over 200 mm dia M.S. casing Pipe as per requirement.

1

750

750

... More
Solar Photovoltaic (SPV) Solar Submersible D.C. Water Motor Pump

-

-

-

... More
Designing, Supplying, Installation, Testing & Commissioning with all tools & Parts of following Solar Photovoltaic (SPV) Solar Submersible D.C. Water Motor Pump Suitable for minimum 125mm x 115mm bore well as per MNRE Guideline with following specifications & accessories.

-

-

-

... More
SPV arrays contains specified No of same capacity type & specification modules connected to series or parallel to obtained the required voltage & current the power output of individual PV modules should be minimum 200 watt peak.

-

-

-

... More
(i) The SPV modules should be as per IEC-61215 and IEC 61730 part 1.0)

-

-

-

... More
(ii) All external parts of motor pump used in submersible pump which are in contact of water is stainless steel grade 303 or higher as required.

-

-

-

... More
(iii) The PV modules should be mounted on metallic structure of adequate strength and appropriate design which can withstand load of modules & High wind pressure up to 200Km/h.

-

-

-

... More
(iv) The module mounting structure should be hot dip galvanized according to IS 4759.

-

-

-

... More
(v) To enhance the performance of SPV water pumping system & arrangement for seasonal tilt angle Adjustment should be provided

-

-

-

... More
(vi) Necessary arrangement should be provided in controller automatic start-run-stop through out the day with water level detection system. (As per MNRE Specification)

-

-

-

... More
(vii) Necessary protection such as lightening arrestor etc. should be provided to protect the controller & SPV

-

-

-

... More
(viii) The suction/delivery pipe shall be UPVC / H.D.P.E. pipes of appropriate size 60m or more as required minimum pressure rating of 8kg/Sq cm- PE 100 grade for pump up to 3HP & 10 Kg/Sq cm- PE 100 grade for 5 HP.

-

-

-

... More
(ix) All cable used shall be as per IS 694. Suitable size of cable shall be used in sufficient length for inter connection between the SPV array to SPV controller and SPV controller to solar power pump. Provision of cable shall be as per IS 14536.

-

-

-

... More
(x) The motor pump set should have a 5 years warranty.

-

-

-

... More
(xi) Control panel suitable for motor pump with arrangement of dry run & over flow protection sensor, float switch & rain prevention box. (As per MNRE Specification)

-

-

-

... More
(xii) The SPV controller must have IP-65 protection or must be housed in cabinet having at least IP-65 protection.

-

-

-

... More
(xiii) The system should be as per MNRE guide line & Eco-friendly with suitable arrangement to operate new pump manually.

-

-

-

... More
(xiv) With third party inspection before dispatch.

-

-

-

... More
(xv) Fitting, fixing & mounting on water tank steel structure.

-

-

-

... More
(xvi) Provision for web based remote monitoring of the pumps to be installed must be made through the inbuilt controllers . It should be possible to ascertain the daily water output, the power generated by PV Array ,the Up and down time of the pump during the year, number of days the pump was unused or under breakdown repairs.

-

-

-

... More
The following details should be marked indelibly on the motor pump set

-

-

-

... More
(a) Name of the Manufacturer or Distinctive Logo.

-

-

-

... More
(b) Model Number.

-

-

-

... More
(c) Serial Number.

-

-

-

... More
Solar submersible motor pump (SPV DC Type)

-

-

-

... More
(i) 1 HP (DC Pump) with 900 WP minimum watt P.V. Panel as MNRE pump head Max Shut-off head up to 120 mtrs. For higher or lower head or in between various modules output could be decided on prorates basis. (As per latest guide line of MNRE)

1

119000

119000

... More
Carrying out recuperation/Yield Test for ascertaining the discharge of constructed well/ excavated profile as directed by the IEC. The test out by the drawing down water from the well/ profile below normal/subsoil water level up to full depth rise is recorded the normal water level/subsoil water level in the well / profile as well as strainer/level at pump as per design of W.S. scheme shall be recorded prior to the test including cost of all materials, over Load , Labours etc. complete as directed.

1

1865

1865

... More
Supplying all labours, tools and equipments for dismantling of head & water tank assembly and taking out 32 mm dia old G.I. Pipe, connecting rod, cylinder assembly the dismantled components after necessary changing for making the T/W in good condition with all transportation including unused taken out materials back in store all complete job as per direction of E/I. (As per Model Estimate of Solar Energy based Mini WSS. TS done by SE, Ranchi Circle & Circle Gumla dt. 21.05.2019)

1

677

677.23

... More
Provision of solar night lamp.

1

1000

1000

... More
Construction RCC Foundation for Steel structure staging & Solar panel .

-

-

-

... More
Earth work in excavation in foundation trenches in ordinary soil and disposal of excavated earth as obtained to a distance up to 50.0m ,including all lifts, levelling ,ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design ,building specification and direction of E/I (vide classification of soil item -B)

5.4

903

167.33

... More
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials ,labour ,royalty and taxes all complete as per building specification and direction of E/I(Mode of measurement compacted volume)

0.3

176

589.51

... More
Providing PCC M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M.2.5to 3 including screening shuttering mixing cement concrete in mixer and placing in position vibrating striking curing and royalty all complete as per building specification and direction of E/I

0.3

1379

4598.23

... More
Providing RCC M-200 in nominal mix of (1:1.5:3) in columns with approved quality of stone chips 20mm to 6mm size graded and clean coarse sand of F.M.2.5to 3 including screening shuttering mixing cement concrete in mixer and placing in position vibrating striking curing and royalty all complete as per building specification and direction of E/I

-

-

-

... More
Foundation for Steel structure staging

0.81

4019

4961.73

... More
Vertical Pedestal

0.56

3372

5989.72

... More
Tie Beam

0.27

1623

5989.72

... More
Providing for steel reinforcement as per approved design and drawing excluding carriage of T.S. bar to work site cutting, bending with annealed wire with cost of wire, removal of rust placing the rods in position all complete as per building specification and direction of E/I.

-

-

-

... More
(a)Foundation for Steel structure staging

-

-

-

... More
Footing

0.08

6649

82096.54

... More
Vertical Column

0.07

5500

82096.54

0.03

2668

82096.54

... More
Carriage of Materials

-

-

-

... More
Cement 20 KM lead

0.78

340

436

... More
Steel 20 KM lead

0.18

78

436

... More
Sand 20 KM lead

1.14

463

406.24

... More
Stone chips 20 KM lead

1.62

658

406.24

... More
Construction of galvanized tubular Steel structure staging for (4.5m) HDPE water storage Tank& Solar Panel.

-

-

-

... More
Providing structural steel galvanised tubular hollow section work in trusses, other similar trussed purlins and members with all bracing ,gusset plates etc as per detailed design and drawing or as directed by Engineer- in-charge ,including cutting fabricating ,hoisting , erecting and fixing in position , making riveted/bolted /welded connections and one coat of anticorrosive paint and over it two coat of all oil painting & For Structure(PLUS) Providing and applying materials &labour for hot dip galvanizing of above structure including transportation for galvanizing minimum thickness 80microns (Net wt. of components to be Galv) preferably TATA structural section etc complete.

1039.53

108464

104.34

... More
Information board for IEC

-

-

-

... More
Providing structural steel work in trusses other similar trussed purlins and members with bracing gusset plates etc as per detailed design and drawing or as directed by Engineer- in-charge including cutting fabricating hoisting erecting and fixing in position making reverted bolted welded connections one coat of anticorrosive paint and over it two coats of oil painting etc complete (MJP 2021-2022 Sec F Item 6)

27.2

2592

95.32

... More
Materials and labour for vinyl painting of matter given by department in different color (As per Market Rate)

1.26

2520

2000

... More
Installation of 2000 liters Capacity Water Storage Tank

-

-

-

... More
Providing and fixing HDPE container Syntex or alike one piecemolded water tank made out of low density polythyler andbuilt corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity 2000.00 litres Capacity Water storage Tank(DWSD item No-01 M)

2000

15500

7.75

... More
Transportation Charge

1

1000

1000

... More
Lifting of 2000 Litrs Capacity Tank up to 4.5m height with lifting tools with rope and labour

1

500

500

... More
Making hole in Tank

4

100

25

... More
Making long screw in G.I. pipe including supplying and fitting jam nuts and extra socket etc.

4

634

158.59

... More
Rising and Distribution Network with House Connection including Platform & Stand post

-

-

-

... More
Earth work in excavation in foundation trenches in hard soil (Vide Classification soil item B) and disposal of excavated earth as obtained to a distance up to 50 Mtr. including all lifts, leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as per approved design, specification and direction of E/I.

103.75

15592

150.29

... More
Dismantling plain cement concrete work including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete

2.25

2150

955.89

... More
Providing PCC M-200 with nominal mix of (1:1.5:3) with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sand of FM 2.5 to 3.0 including screening, shuttering, mixing cement concrete in mixer and placing in position, vibrating, sticking, curing , taxes and royalty all complete as per specification and direction of E/I. for construction of road cutting portion-

2.25

11163

4961.73

... More
Rising Main

-

-

-

... More
Manufacture, supply and Delivery of following Nominal dia UPVC column pipes including PVC socket (Coupler),50 mm dia -Density of pipe 1.38 to 1.43 Gm per Cm3 OD:87.5 to 88.2mm wall Thickness End:9 .8 mm to 11.9mm, Barrel 7.3mm to 9 mm, Length: 3Mtrs. Delivery Pipe

15

2355

157

... More
Distribution

-

-

-

... More
Providing and supplying High Density Polyethylene pipe (HDPE pipe) of 20 mm to 225 mm OD and pressure 6.0 Kg/cm2 and 10 Kg/cm2 suitable for water supply which is available in all standard conforming to ISI -- 4984/14151/12786/13488,ISO 4427 , DIN-8074 materials rates are Ex-factory excluding transportation, taxes and duties. PE-80 , PN- 10 (Item No-112M 1028)

-

-

-

... More
50 mm HDPE Pipe-

100

11704

117.04

... More
32 mm HDPE Pipe-

200

9514

47.57

... More
20 mm HDPE Pipe-

100

2500

25

... More
Providing and fixing Gun Metal Gate valve with C I wheel of approved quality(screwed end)50 mm dia .

1

776

776.07

... More
Providing and supplying High Density Polyethylene (HDPE ) fittings of 20 mm to 225 mm OD and pressure 6.0 Kg/cm2 and 10 Kg/cm2 suitable for water supply which is available in all standard conforming to ISI -- 4984/14151/12786/13488,ISO 4427 , DIN-8074 materials rates are Ex-factory excluding transportation, taxes and duties. PE-80 , PN- 10

1

1420

1420.4

... More
Lowering, Laying and Jointing H. D. P. E./M. D.P. E. pipes in proper position including all specials by compression fitting/electro fusion and butt fusion jointing procedure as per relevant IS Code complete with all materials for jointing procedure like Electro fusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II. MJP 19-20 sec-I-IX sl no -2(i)

-

-

-

... More
For Rising 50 mm HDPE Pipe

15

555

37

... More
For Distribution 50 mm HDPE Pipe

100

3700

37

... More
32 mm HDPE Pipe

200

4600

23

... More
20 mm HDPE Pipe

100

1200

12

... More
Providing 15 mm dia. G.I. pipe Tata or equivalent make as per IS 1239 (Part 1/2004) ISI Mark /medium quality in Stand Post.

7

840

120.12

... More
Supplying all materials , labour and tools for fixing 15 mm dia G.I. pipes with Red lead and yarn of following nominal bore with screwed and socketed joints on wall, ceiling and floor including supplying and fitting of wall hooks or pipe clamps, wooden plugs, cutting pipes to size and threading ends if required etc. all complete as per specification and direction of Engineer-in-Charge.

7

95

13.59

... More
Supplying and fixing G.I. fittings of approved make all complete as per specification and direction of E/I.

-

-

-

... More
Elbow 15 mm dia.

14

1130

80.78

... More
Reducer Socket (20X15 mm Dia)

7

587

83.89

... More
Nipple 15 mm Dia

14

1094

78.19

... More
Plain Socket 15 mm Dia

14

1077

76.99

... More
Supplying and fixing G.M. ferrule of approved make in existing C.I./D.I. main Including drilling and taping C.I./D.I. main all complete as per specification and direction of E/I. 3 mm, 6 mm 10 mm dm ferrule weight not less than 425 gram.

7

4363

623.29

... More
Providing and fixing Gun Metal full way valve of approved quality, all complete, as per specification and direction of E/I.50 mm dia and weight not less than 1.5 Kg.

1

1552

1552.85

... More
Providing and fixing of male ended C.I.Body brass spindle valve and seat Bib cock of approved quality with extra socket all complete as per specification and direction of E/I.15 dia and weight not less than 400 Gm

7

1397

199.58

... More
Constructing masonry Chamber 30x30x50 cm inside, in brick work in cement mortar 1:4 (1 cement :4 coarse sand) for stop cock, with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5 fine sand : 10 graded stone aggregate 40mm nominal size ) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12mm thick, finished with a floating coat of neat cement complete as per standard design.With common burnt clay F.P.S.(non modular) bricks of class designation 7.5. DSR 18.32.1 Full way valve chamber

1

1712

1712.15

... More
Supplying materials , labours and equipment's for construction of 0.90M x 0.90 M size P.C.C. (1:2:4) Rectangular Platform with stand post in house including 12 mm thick cement plaster in C.M. (1:4) with neat cement punning over exposed surface all complete job, as per approved design, specification and direction of E/I.

7

9800

1400

... More
Providing brick masonry chamber of inner size 600 x 600 x 450 mm deep for bore well protection having 125 mm thick wall and 75 mm R.C.C cover including cement plaster of exposed surface, etc all complete job

1

2719

2719

... More
Earth work in back filling the trenches after laying different types and size of pipes with earth removed during excavation within initial lead and lift as per specification and direction of Engineer-in-Charge. (85% of Excavated Qty.)

88.19

8283

93.93

... More
Providing fitting & fixing 32 mm to 50 mm service HDPE saddle all complete job, as per approved design, specification and direction of E/I.

7

378

54

... More
Annual Operation & Maintenance cost based on Existing D/T Well with solar motor pump for 5 years.

-

-

-

... More
O & M Cost for 1st year

1

9000

9000

... More
O & M Cost for 2nd year

1

10363

10363.55

... More
O & M Cost for 3rd year

1

10985

10985.36

... More
O & M Cost for 4th year

1

11644

11644.48

... More
O & M Cost for 5th year

1

12343

12343.15

... More
Provision of one no SIM card & its recharging cost for RMC

5

4000

800

... More
Add 18% GST.

1

121703

121703.73

... More
Add 1% Labour Cess

1

7978

7978.36



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.