Drinking Water And Sanitation Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 47,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Dwsd/mech. Div. Dumka/03/2023-24
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DWSD_84652_1Bid Award Id
ViewTender No
DWSD/Mech. Div. Dumka/03/2023-24Tender Authority
Drinking Water And Sanitation Department ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying and laying of 16 sq. mm x 3 core X 1.1 KV grade with ISI mark PVC insulated and unarmoured flexible copper Cable from MCP to motor terminal box with suitable copper thumble socket etc.
30
-
-
Cost towards making priming facilities at clear water pumping plant including supplying PE 3 layer water storage tank - 1000 ltrs. and connecting with 20mm G.I. pipe-20 feet as feeding line and 15mm G.I. pipe as delivery line with socket-04 Nos. (20mm)., socket-04 Nos. (15mm), nipple 20mm-01 No., 15mm-01 No., ball valve -02 Nos as per side condition etc. all complete.
1
-
-
Cost towards supply and fixing XLPE/PVC insulated unmarroud cable 1.1 KB grade stranded (10 sq. mm X 3 core) from electric meter to change over switches and change over to automatic voltage stabilizer.
20
-
-
Cost towards replacement of tyre coupling set (3”) for 2 Nos. pump sets with fitting, making bore as per shaft size etc. all complete.
1
-
-
Providing all labours, tools, tackels and technician for disconnection and taking out 12.5 HP VT p/set with column pipe from intake well all complete set.
2
-
-
Supplying, Installation, testing and commissioning of electrically driven vertical turbine pump sets Kirloskar/WPIL/Mather & Plate/ Jyoti having discharge capacity of raw water 50 m3/h against a total head of 40 meter, in all concern coupled with vertical hollow shaft sq. cage induction motor make (Kirloskar/ Crompton/Jyoti) operated on 415 ± 10% volt, 50HZ, 1460 RPM (10% above the capacity of pump) with sole plate, discharge head, M.S. D.F. column assembly random length of 5ft, total 50ft S.S. line shaft, S.S. socket, spider bearing with rubber cut less bush, CIDF sluice valve-1no, CIDF NR valve-1no, pressure gauge-1no & fixing the discharge new pump to the existing common header etc. all complete.
2
-
-
Cost towards supplying, Installation and commissioning of 30 KVA Servo controlled (Air/Oil cooled) automatic voltage stabilizer suitable for output voltage of 415 volt ± 1% 3 phase 50 Hz with copper wound transformer as mentioned below. The stabilizer shall function satisfactorily even if incoming supply is unbalanced between phases within range of 10%. The stabilizer should be constructed in cubical box, with bidirectional wheels for easy handling necessary monitors and user’s controls on front panel such as indication alarm, voltmeter and selector switch for measuring input and output voltage auto manual selector switch. Raise low push buttons etc. Suitable capacity termination strips and bus bars for incoming and outgoing cable should be provided. All three phases shall be independently monitored and corrected. Following protections and indication shall be incorporated.
Over Voltage/Under Voltage
Single Phasing
Cut off contactor with electronic output sensing unit
30KVA Air/Oil cooled Servo controlled automatic voltage stabilizer (Output 415 unit ±1%) Input 280 to 450 Volt.
1
-
-
Cost towards supply and fixing XLPE/PVC insulated unmarroud cable 1.1 KB grade stranded (16 sq. mm X 3 core) from electric meter to change over switches and change over to automatic voltage stabilizer.
25
-
-
Cost towards replacement of old panel by supply, installation & commissioning of new floor mounted motor control panel comprising 100 amp copper bus bar 04 nos. in M.S. steel (16SWG) cubical box (3’ X 2.5’ X 1’)
• T.P.N. main switch SDF type in SS enclosure make L&T- 100 amp- 1 No.
• Three pole MCCB (make L&T) 100 amp-1 no. for incomer feeder. • Three pole MCCB (make L&T) 63 amp-2 nos. for starter.
• FASD starter (Make-L&T) suitable for 15 HP pump set.-02 Nos.
• Ammeter- 03 Nos. (0-50Amp) -01 No., (0-30Amp)- 02 Nos. • Voltmeter (0-500V)-1 no. MCP should be comprising with selector switches, phase indicator (RYB), single phase preventer, push button (Start & off), On-Off indicator for starter, provision of lighting arrangement (25Amp MCB) etc. all complete.
1
-
-
Painting of raw water pump house with windows, door, gang way and etc
1
-
-
Light wiring inside and outside of pump house with LED street light-02 Nos. (40 Watt), LED tube set- 2 Nos. (20 Watt).
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements