Central Coalfields Limited Tender
... More
The CCL has issued a formal invitation for competitive bids for the Central Coalfields Limited project, for Repair And Maintenance Of Approach Road And Pavement At Base Workshop Premises Under Kathara Colliery Kathara Area in Bokaro, Jharkhand, with an estimated contract value of Rs. 2,20,71,730. The bid opening date for this tender is 07-01-2025 and the last date for bid submission is 28-01-2025. Interested bidders for Central Coalfields Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 2,75,900Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_CCL_325062_1Bid Award Id
ViewTender No
GM(KTA)/SO (C)/e-Tender/Above 50 lakh/24-25/ 44Tender Authority
Central Coalfields Limited ViewPurchaser Address
-Website
http://http://www.centralcoalfields.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing )
1760.16
6338
11155894.08
... More
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) for grading- II Material
880.08
2445
2151795.6
... More
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
880.08
3632
3196450.56
... More
Road Markers/Road Stud with plastic body of RPM/ASA/HIPS as per clause 804.2.1 of MORTH, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973)
475
246
116850
... More
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
249.2
262
65427.46
... More
Total impact of GST for the purpose of CTC