Building Construction Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Building Construction Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date24 Sep 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement of specified grade excluding the cost of centering and shuttering-All work up to plinthlevel 1:2:4(1 cement:2 coarse sand(zone III):4 Gradestone aggregate 20 mm nominal size)

15.53

-

-

... More
Providing designation 75 B brick work in C.M. (1:6) in foundation and plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm thick mortar joints, cost of screening materials, raking out joints to 15 mm depth, curing, taxes and royalty all complete as per building specification and direction of E/l.

9.45

-

-

... More
Providing designation 75 B brick work in C.M (1:6) in superstructure with approved quality of clean coarse sand of F.M 2 to 2.5 including providing 10 mm thick mortar joints cost of screening materials , scaffolding , raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/l.

113.36

-

-

... More
Providing and laying in position cement of specified grade excluding the cost of centering and shuttering-All work up to plinthlevel 1:1.5:3(1 cement:1.5 coarse sand(zone III):3 Gradestone aggregate 20 mm nominal size)

12.17

-

-

... More
Foundation ,footings,bases of column .etc for mass concrete Centering and shuttering including strutting proping etc .and removal of form for

118.72

-

-

... More
Providing and laying cement concrete in retaining walls ,return walls,walls(any thickness) including attached pillasters,columns,piers,abutments,pillars,posts,struts,butteresses,string or lacing courses,parapets,copping ,bed blocks,anchors blocks,plain window sills,fillets,sunken floor etc, up to floor five level, excluding the cost of centering and shuttering and finishing- :1:1.5:3(1 cement:1.5 coarse sand(zone III):3 Gradestone aggregate 20 mm nominal size)

22.53

-

-

... More
Centering and shuttering including strutting proping etc .and removal of form for Columns,pillars,piers,Abutments,post,and Struts

299.75

-

-

... More
Reinforced cement concrete work in beams ,suspended floors,roofs having slope up to 15 degree landing,balconies,shelves,chajjas,lintels,bands,plain wndows sills,staircase and spiralstair case above floor five level, excluding the cost of centering , shuttering, finishing,and reinforcement with- :1:1.5:3(1 cement:1.5 coarse sand(zone III):3 Gradestone aggregate 20 mm nominal size)

25.07

-

-

... More
Centering and shuttering including strutting proping etc .and removal of form for Lintels,beams,plinth beams ,girders,bressumers and cantilever

180.03

-

-

... More
Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/l.

1066.29

-

-

... More
Providing tor steel reinforcement of 8mm. dia. rods as per approved design and drawing excluding carriage of M.S. bars to work site , cutting, bending and binding with annealed wire with cost of wire, removal of rust placing the rods in position all complete as per building specification and direction of E/l.

3.91

-

-

... More
Providing Tor steel reinforcement of 10mm. ,12mm & 16mm dia. bars as per approved design and drawing excluding carriage of M.S. bars to work site , cutting, bending and binding with annealed wire with cost of wire, removal of rust placing the rods in position all complete as per building specification and direction of E/l.12mm

2.54

-

-

... More
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 etre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost ofM.S. angle, C.C. blocks shall be paid separately

276.95

-

-

... More
Providing angle as per IS 226 50X50X6

685.43

-

-

... More
Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper, scaffolding, curing and taxes all complete as per building specification and direction of E/l.

911.15

-

-

... More
Earth filling in foundation trenches and plinth in layers not exceeding 150 mm. thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation frenches within a lead of 50 M. and lift of 1.5 M all complete as per building specification and direction of E/l (Mode of measurement compacted volume).

160.87

-

-

... More
Carrige of materials (A)Bricks with an av.Lead of 15 km

56.55

-

-

... More
(B)Sand with an av.Lead of 5 km

125.83

-

-

... More
(C)Stone chips avg. lead 15 km

65.33

-

-

... More
Supplying, fitting and fixing M.S. grill gate with M.S. grills made of 20x6mm M.S. flats or 16mm square bars fitted on 25x25x6mm M.S Angle frame including cost of fabrication , providing necessary locking arrangement with haskal and domny duly fixed in P.C.C. (1:2:4) blocks of required size, applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/l. (where steel is not supplied by the deptt.)

541

-

-

... More
Providing primer one coat of red lead paint of approved make over new steel surface including preparing the surface after cleaning, removing rust, dirt, scales, smokes and grease and cleaning the surface thoroughly including cost of scaffolding and taxes all complete as per building specification and direction of E/l. ( Mode of measurement Area shall be multiplied by the co-efficient as indicated in building specification)

10.4

-

-

... More
Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. lead and disposal of unserviceable materials with all leads all complete as per direction of E/l.

148.5

-

-

... More
Add GST 18 %

0.18

-

-

... More
Add L.Cess 1 %

0.01

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.