Bharat Sanchar Nigam Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 23,485Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSNL_188518_1Bid Award Id
ViewTender No
60/NIT/EE(C)/BCD/RCH/2023-24Tender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://https://www.bsnl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Earth work in excavation over areas (exceeding 30cm in depth . 1.5m in width as well as 10 Sqm on plan ) including disposal of excavated earth , lead upto 50m and lift upto 1.5m ; disposal earth to be levelled and neatly dressed.
-
-
-
Ordinary rock
15
-
-
Hard rock ( blasting prohibited )
5
-
-
Extra for every additional lift of 1.50m or part there of :
-
-
-
All kinds of soil.
159
-
-
Ordinary or hard rock.
20
-
-
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation, etc. in layers not exceeding 20cm in depth; consolidating each deposited layer by ramming and watering lead upto 50 metre and lift upto 1.5m.
170
-
-
SH: CONCRETE WORK
-
-
-
Providing and laying cement concrete of specified grade excluding the cost of centring and shuttering All work up to plinth level
-
-
-
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
0.45
-
-
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.2
-
-
SH: R.C.C. WORK
-
-
-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
-
-
-
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
25
-
-
Centering and shuttering including strutting, propping etc. and removal of form for:
-
-
-
Foundations, footings, bases of columns, etc. for mass concrete
11.4
-
-
Lintal, beam, Plinth beam girders, bressumurs and cantilevers.
6
-
-
Columns, pillars, Piers, abutments, posts and struts.
43
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
Thermo-Mechanically Treated bars of grade Fe-500D or more.
4000
-
-
RCC work smooth finishing of exposed surface with 6 mm thick cement moratar 1:3 ( 1 cement : 3 fine sand )
10
-
-
SH: STEEL WORK
-
-
-
Labour Charges for arranging and fixing the anchor bolts in position during concreting (base plate and anchor bolts supplied by the department at free cost).
32
-
-
Labour Charges for erection and fixing of tower members as per standard / approved drawing, schedule including tighting of nuts, bolts, washers, with propers tools and plants, fixing of antenna fixture cable tray platform and railing and ladders of all complete i/c sorting of the tower material as per direction of Engineer In-Charge.
-
-
-
On 40 mtr Tower
8.2
-
-
P/F Horizontal / Vertical cable Tray with galvanised iron sections connected by bolts and nuts or by welding to required line and level including connecting legs as required as per direction of and full satisfaction of Engineer in Charge. (The Galvanised shall be as per IS 4759 with average mass of zinc coating of 610 gm/sqm i.e. approximately 85 micron).
150
-
-
Providing antena mount made of galvanised iron section and medium quality G.I pipe & fixing by bolts and nuts or by welding at required height (upto 40 metre) as per direction of Engineer-in-charge (Erection & fixing to be paid separately in tower erection item).
-
-
-
On 40 mtr tower.
187
-
-
SH: FINISHING WORK
-
-
-
Neat Cement punning
10
-
-
Applying two or more coats of high gloss synthetic enamel paint of approved brand and manufacture and of required shade and pattern over and including one or more base coats of zinc chromate primer of approved brand and manufacture on 40 meter high tower all complete as per direction of Engineer-in-charge.
-
-
-
On 40 metre Tower.
8.2
-
-
SH: Allied work
-
-
-
Carriage of tower materials including anchor bolts and templates by mechanical means from BSNL store to the tower site including loading, unloading and stacking all complete as per the direction of Engineer-in-charge, from BSNL store at RTTC Ranchi upto purposed site at Bharno.
-
-
-
(i) Steel Tower
-
-
-
(a) Up to distance of 5.00 Km.
8.2
-
-
(b) Beyond 5.00 Km to 10.00 km. Distance
41
-
-
(C) Beyond 10.00 Km to 20.00 km. Distance
82
-
-
(d) Beyond 20.00 Km to 65.00 km. Distance
369
-
-
Sorting of tower material of 40 mtr. Tower of weight 8 to 9 MT. from telecom store (This includes confirming of tower material , arranging the members including making detailed members information complete as per direction of Engineer in charge)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements