Bharat Coking Coal Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,828Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_BCCL_285162_1Bid Award Id
ViewTender No
BCCL/PBA/AM(EnM)/2023-24/25 dated-07.08.2023Tender Authority
Bharat Coking Coal Limited ViewPurchaser Address
-Website
http://http://www.bcclweb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Laying/Hanging of one no. PVC insulated power cable of 11 KV grade of 120 sq mm after making fresh lead (CPWD SOR' 2012, P-28, 8.3.1)
10
250
25
Jumpering above cable with O/H line
3
720
240
Transportation of pole at site
8
4744
593
Erection of metallic pole of 8 to 10 metre length in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required (CPWD SOR' 2012, P-36, 11.3.3)
5
14760
2952
Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (Rabbit Conductor 300 Meters) (CPWD SOR' 2012, P-40, 12.40) @ 0.214 Kg/Mtr
64.2
1765
27.5
Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (Dog Conductor 330 Meters) (CPWD SOR' 2012, P-40, 12.40) @ 0.394 Kg/Mtr
130.02
3575
27.5
Dismantle of LV/MV shackle/pin insulators etc as required. (CPWD SOR' 2012, P-39, 12.20)
18
477
26.5
Dismantle of bracket & clamps
45
1080
24
Dismantle of pole/street light standard/strut embedded in cement concrete foundation etc. as required (CPWD SOR' 2012, P-40, 12.42)
2
1718
859
Transportation of pole to store
4
2372
593
Fabrication & erection of bracket & clamps
45
2160
48
Supply & erection of MS Nut & Bolts
1.8
216
120
Supplying and erection of 100 mm X 110 mm shackle insulators with G.I bolts, nuts, and straps etc. as required (CPWD SOR' 2012, P-39, 12.17)
18
2772
154
Supplying and erection of Stay set complete (galvanised) with 19/20 mm dia X 1.8 metres long stay rod (CPWD SOR' 2012, P-37, 12.2)
2
6172
3086
Erection of Rabbit conductor 300 meters of 7/2.11 mm to 7/3.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.21) @ 0.214 Kg/Mtr
64.2
4173
65
Erection of Dog Conductor 330 meters of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) @ 0.394 Kg/Mtr
130.02
11116
85.5
Making new jumper with O/H line
4
960
240
Supply & erection of cradle guard
105
5040
48
Excavation of one number PVC insulated and PVC sheated/XLPE power cable of 11 KV grade of 120 sq mm size from ground (CPWD SOR' 2012, P-28, 8.1.2)
50
11500
230
Mechanical joint both end cable with Transformer & switch
2
4796
2398
B) FOR 2nd source 11 KV O/H line maintenance - Opening jumper for searching faults & after megguring re-jumpering
6
1440
240
Opening jumper for changing of faulty Disc insulator
1
240
240
Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (Wolf Conductor 50 Meters) (CPWD SOR' 2012, P-40, 12.40) @ 0.726 Kg/Mtr
36.3
998
27.5
Dismantle of disc/pin insulator for 11 KV over head lines as required. (CPWD SOR' 2012, P-42, 13.12)
1
53
53
Supply & erection of 11 KV Disc insulator for O/H line with galvanised insulator fittings, bolts, nuts, washers etc. as required (CPWD SOR' 2012, P-42, 13.11)
1
1171
1171
Erection of Wolf Conductor 50 meters of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) @ 0.726 Kg/Mtr
36.3
3103
85.5
Making new jumper after changing of new Disc insulator
1
240
240
C) FOR main feeder 11 KV O/H line maintenance - Opening jumper for searching faults & after megguring re-jumpering
18
4320
240
Opening jumper for changing of faulty Disc insulator
5
1200
240
Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (Wolf Conductor 275 Meters) (CPWD SOR' 2012, P-40, 12.40) @ 0.726 Kg/Mtr
199.65
5490
27.5
Dismantle of disc/pin insulator for 11 KV over head lines as required. (CPWD SOR' 2012, P-42, 13.12)
7
371
53
Supply & erection of 11 KV Disc insulator for O/H line with galvanised insulator fittings, bolts, nuts, washers etc. as required (CPWD SOR' 2012, P-42, 13.11)
5
5855
1171
Supply & erection of 11 KV Pin insulator complete with large steel head G.I pin, nuts, washers etc. as required (CPWD SOR' 2012, P - 42, 13.10)
2
738
369
Erection of Wolf Conductor 275 meters of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) @ 0.726 Kg/Mtr
199.65
17070
85.5
Making new jumper after changing of new Disc insulator
5
1200
240
Supply & erection of cradle guard with 8 No. swg G.I wire
110
5280
48
D) FOR ECC Kenduadih 11 KV O/H line maintenance - Opening jumper for searching faults & after megguring re-jumpering
12
2880
240
Opening jumper for changing of faulty Disc insulator
2
480
240
Dismantling of over head lines comprising of Copper/Aluminium over head conductor, G.I wire, cross arms, insulators etc as required (Wolf Conductor 110 Meters) (CPWD SOR' 2012, P-40, 12.40) @ 0.726 Kg/Mtr
79.86
2196
27.5
Dismantle of disc/pin insulator for 11 KV over head lines as required. (CPWD SOR' 2012, P-42, 13.12)
4
212
53
Supply & erection of 11 KV Disc insulator for O/H line with galvanised insulator fittings, bolts, nuts, washers etc. as required (CPWD SOR' 2012, P-42, 13.11)
2
2342
1171
Supply & erection of 11 KV Pin insulator complete with large steel head G.I pin, nuts, washers etc. as required (CPWD SOR' 2012, P - 42, 13.10)
2
738
369
Erection of Wolf Conductor 110 meters of 7/3.35 mm to 7/4.00 mm diameter and above including binding etc (CPWD SOR' 2012, P-39, 12.22) @ 0.726 Kg/Mtr
79.86
6828
85.5
Making new jumper after changing of new Disc insulator
2
480
240
Total impact of GST for the purpose of CTC
1
26327
26327.56
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements