Bharat Coking Coal Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 2,706Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BCCL_325512_1Tender No
BCCL/WJA/MND/SUR/2024-25/58Tender Authority
Bharat Coking Coal Limited ViewPurchaser Address
-Website
http://http://www.bcclweb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Brick work (1:4)with FPS bricks CD-50 bricks in foundation & plinth(including pillar)= (0.3+5.8+0.3)x0.50x0.30=0.96m3 (5.8+0.6-1.2)x 0.23x 1.5) =1.79m3 (0.3+6.1+0.3)x0.50x0.30=1.01m3 (6.1+0.6-1.6)x 0.23x 1.5) =1.76m3 + Pillars=0.50x0.25x1.5x2sidex 2no=0.75m3 Total=0.96+1.79+1.01+1.76+0.75=6.27m3
6.27
6246
39165.99
... More
Brick work (1:4)with FPS bricks CD-50 bricks in super structure plinth level up to V-level in all shape & size (5.8+0.6)x 0.23x (2.6-1.5)=1.62m3 + (6.1+0.6)x 0.23x (2.4-1.5) =1.39m3 + Pillars=0.50x0.25x(2.5-1.5)x2side=0.25x2no=0.50m3 Total=1.62+1.39+0.50=3.51m3
3.51
7170
25167.4
... More
12 mm cement plaster: [(5.8x2.6)-(1.2x1.2)]x2side+(0.5+0.25)x2side= 28.78m2 + [(6.1x2.4)-(1.6x2)]x2side+(0.5+0.25)x2=24.38m2 Total =28.78+24.38=53.16m2
53.16
360
19143.98
... More
Providing 4 extra lead for carrying Bricks for two V/ stopping,(1 at surface + 3 in UG) ie 4leadx 328/1000=1.31/Bricks. For (2.84+6.27)=9.11x 496 bricks=4519 bricks
4519
1
5919.89
... More
Providing 4 extra lead for carrying Sand for two V/ stopping,(1 at surface + 3 in UG) ie 4leadx 175.78)=Rs703.12/m3 of sand: For B/W=9.11x0.26=2.37m3 For plaster=53.16 x 0.015=0.80m3 Total =3.17m3
3.17
703
2228.89
... More
Providing 4 extra lead for carrying Bricks for two V/ stopping,(1 at surface + 3 in UG) ie 4leadx 101.20= Rs404.80/te Cement For B/W=9.11x1.90=17.31bags For plaster=53.16x0.075=4.00bags Total=17.31+4.0=21.31bag i.e 21.31*50/1000=1.07te
1.07
404
433.14
... More
Transportation of materials though track & haulages: Bricks=4519@500/Minecar=9.04Minecars Cement 21.31bags @30bags/minecar=0.71minecars Sand=3.17m3@2.10m3/minecar=1.51minecar. Total=11.26Mine car Analysis: For transportation of 2loaded mine car including loading,unloading =6Unskilled manshifr required.Threfore cost involve=(6*1316.6)/2=3949.8/m3
11.26
3949
44474.75
... More
Transportation of empty tubs through winch/ haulage including loading & unloading at 7th dip of TG of D-16 panel of XVI(T)seam-500MH to Jn.of Loco lataral 500-MH of XVI(B) seam near drift mouth. Analysis: For transportation of 6 empty mine car =6Unskilled manshifr required.Threfore cost involve=(6*1316.60)/6=1316.60/m3
11.26
1316
14824.92
... More
Transporting two door from E-9 BG & E-8 TG to surface for repairing=4manshift x 1316.60= Rs,5266.40/door
2
5266
10532.8
... More
Transporting two door from surface to E-9 BG & E-8 TG & fitting =6manshiftx1316.60= Rs,7899.60/door
2
7899
15799.2
... More
CMPF
-
-
-
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements