Bharat Coking Coal Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 3,584Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BCCL_301222_1Bid Award Id
ViewTender No
BCCL/WJA/MND/SUR/2023-24/69Tender Authority
Bharat Coking Coal Limited ViewPurchaser Address
-Website
http://http://www.bcclweb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling and transportation of 2nos of 5m³ pump from main pump room to workshop. Manshift required = 8 Manshift(Unskilled) x 6 shift = 48 Manshift.Cost involve /manshift as Sr. no.1
48
61862
1288.81
... More
Transportation of 2nos of 5m³ pump from suface to main pump room and assembling and placing of 2nos of pump on base frame at main pump room 500mh. Manshift required = 8 Manshift(Unskilled) x 8 shift = 64 Manshift. Cost involve /manshift as Sr. no.1
64
82483
1288.81
... More
Dismantling and transportation of 2.5m³ pump from main pump room to workshop. Manshift required = 6 Manshift(Unskilled) x 3 shift = 18 Manshift. Cost involve /manshift as Sr. no.1
18
23198
1288.81
... More
Transportation of 2.5m³ pump from suface to main pump room and assembling and installation of pump on base frame at main pump room 500mh. Manshift required = 6 Manshift(Unskilled) x 4 shift = 24 Manshift.Cost involve /manshift as Sr. no.1
24
30931
1288.81
... More
Dismantling of 1nos of 1250KW motor & rotor from base and housing respectively. Manshift required = 4 Manshift(Unskilled) x 2 shift = 8 Manshift. Cost involve /manshift as Sr. no.1
8
10310
1288.81
... More
Assembling of 1250KW rotor, stator and installation of motor on base frame. Manshift required = 4 Manshift(Unskilled) x 2 shift = 8 Manshift.Cost involve /manshift as Sr. no.1
8
10310
1288.81
... More
Transportation of 1nos of 1250KW rotor from main pump room to the surface. Manshift required = 4 Manshift(Unskilled) x 1 shift = 4 Manshift.Cost involve /manshift as Sr. no.1
4
5155
1288.81
... More
Transportation of 1 nos of 1250KW rotor from surface to main pump room. Manshift required = 4 Manshift (Unskilled) x 1 shift = 4 Manshift.Cost involve /manshift as Sr. no.1
4
5155
1288.81
... More
Dismantling of main valves 12" size and transportation to workshop. Manshift required = 4 Manshift(Unskilled) x 1 shift = 4 Manshift.Cost involve /manshift as Sr. no.1
4
5155
1288.81
... More
Transportation of main valves 12" size and assembling in main pump. Manshift required = 4 Manshift(Unskilled) x 1 shift = 4 Manshift. Cost involve /manshift as Sr. no.1
4
5155
1288.81
... More
Transportation and placing of 5KVA lighting transformer from workshop to Gawrek dip -400MH. = 4 Manshift(Unskilled) x 1 shift = 4 Manshift. Cost involve /manshift as Sr. no.1
4
5155
1288.81
... More
Transportation, laying and hanging of FLP LED light fittings with 15 mtr lighting cable connected with each fittings from surface to 400MH main line. = 1 Manshift(Unskilled) x 0.5 shift = 0.5 Manshift. Cost involve /manshift as Sr. no.1
0.5
644
1288.81
... More
CMPF
-
-
-
... More
CMPF, Pension and admin. Charge of Employee Un Skilled
222.5
47946
215.49
... More
Total impact of GST for the purpose of CTC
1
-
-