Bharat Coking Coal Limited Tender
... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 3,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BCCL_327644_1Bid Award Id
ViewTender No
BCCL/KA-IV/ENM/E-TEN/24-25/241 DATE- 01.02.2025Tender Authority
Bharat Coking Coal Limited ViewPurchaser Address
-Website
http://http://www.bcclweb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
(1) REPAIRING and OVERHAULING OF 200A,550V,SL.NO.10962 KILBURN MAKE,GTC UNIT,AGKCC.(2) COMPLETE REPAIRING OF 400 AMPS OCB SWITCH MAKE BIECCO LAWRIE 6.6 KV SL.NO.116937 CONTROLLING FOR 300 KVA LIGHTING TRANSFORMER AT OLD AREA OFFICE SUB-STATION AKWMC
BOQ Items
... More
EARTH LEAKAGE RELAY
1
5500
5500
... More
MAIN FINGER CONTACT
6
550
3300
... More
DAX FINGER CONTACT
6
350
2100
... More
SPARKING ARIERY CONTACT(BIG)
24
50
1200
... More
SPARKING CONTACT(SMALL)
48
40
1920
... More
OVER LOAD COIL
3
500
1500
... More
NO VOCT COIL
1
850
850
... More
AMPERE MTR
1
1500
1500
... More
VOLT MTR
1
1500
1500
... More
ISOLATOR COMPLETE SET
1
4500
4500
... More
LABOUR CHARGE :- H/SK - 02 HEAD X 5 SHIFT = 10 HEAD
10
502
5024.4
... More
SK - 02 HEAD X 5 SHIFT = 10 HEAD
10
434
4349.6
... More
REPAIRING OF SPRING CHARGING MECHANISM
1
3200
3200
... More
MOVING COPPER BAR CONTACT
2
1350
2700
... More
SPARKING COPPER CONTACT
18
350
6300
... More
FINGER MALE COPPER CONTACT
4
550
2200
... More
TRIPPING COIL WITH PLUNGER
1
1300
1300
... More
OVER LOAD COIL
3
850
2550
... More
SELECTOR SWITCH KV/AS
2
600
1200
... More
POWER PACK
1
2100
2100
... More
KIT KAT FUSE WITH HRC
6
260
1560
... More
INDICATOR LAMP
3
100
300
... More
CONNECTOR BLOCK 20 POLE
1
1600
1600
... More
AUXILIARY CONTACTOR
1
3500
3500
... More
REVERSING SWITCH
1
960
960
... More
CONTROL WIRING
1
4500
4500
... More
REPLACEMENT OF EARTH LEAKAGE RELAY
1
8500
8500
... More
PUSH BOTTOM SWITCH
2
270
540
... More
PAINTING CHARGE
1
1000
1000
... More
VOLT MTR DIGITAL
1
1750
1750
... More
COMPLETE REWINDING OF P.T.TRANSFORMER
1
25000
25000
... More
LABOUR CHARGE :- H/SK - 01 HEAD X 5 SHIFT = 05 HEAD
5
502
2512.2
... More
SK - 02 HEAD X 5 SHIFT = 10 HEAD
10
434
4349.6
... More
ERECTION & CHANGING WORNOUT UPPER MOVING CONTACT ASSEMBLE.
3
3000
9000
... More
ERECTION & CHANGING OF FIXED CONTACT & LOCK WASHER SET.
12
700
8400
... More
REPLACEMENT OF ROTTRY LIMIT SWITCH OF ON-OFF INDICATION & TRIP CUT OUT.
1
9000
9000
... More
OIL LEVEL INDICATION WITH FLUTE SET
3
600
1800
... More
REPLACEMENT OF DRUGGING HUK & DOWEL PIN & CHANGING LONG SPRING SET.
2
1500
3000
... More
MECHANICAL REPAIRING & CHANGING CLOSING LATCH & TRIPING CATCH SET.
2
2500
5000
... More
REPLACEMENT OF RECHART PINION SET.
1
7000
7000
... More
CLEANING OF OVERHAULING OF MOCB & SETTING ADJUSTMENT MECHANICAL ASSEMBLE.
1
5000
5000
... More
ERECTION & BUFFING ARECHUT.
3
900
2700
... More
DEHYARATION OF RE-INSULATION OF ALL INTERNAL POLE.
3
1200
3600
... More
REPLACEMENT OF CLOSING COIL 220 VDC.
1
2400
2400
... More
REPLACEMENT OF TRIPPING COIL 220 VDC.
1
1200
1200
... More
CHANGING OF OIL SEAL & 'O' RING BREAKAR POLE.
12
500
6000
... More
PAINTING OF BREAKAR.
1
1500
1500
... More
ARCHUTE 6.6 GRADE
2
5500
11000
... More
AUXILIARY SWITCH 8 NO.8NC.
1
1200
1200
... More
DOG LEVER
2
950
1900
... More
BEARING
2
550
1100
... More
ROTOR CONTACT SET
3
3000
9000
... More
SUPPLY OF TRIPPING COIL
1
1050
1050
... More
CLOSING COIL
1
1150
1150
... More
O' RING COMPLETE SET(BIG SIZE)
12
650
7800
... More
O' RING COMPLETE SET(MED SIZE)
12
580
6960
... More
O' RING COMPLETE SET(SMALL SIZE)
24
490
11760
... More
MECHANICAL PORTION DISMANTLING ,REFITTING OVERHAULING WITH SUPPLY OF MINOR SPARES.
1
4200
4200
... More
LABOUR COST FOR ABOVE JOB & REPLACEMENT OF ARCHUT COMPLETE SET.:- ELEC GR - I, 03 HEAD X 04 DAYS = 12 HEAD
12
502
6029.28
... More
ELEC GR - II, 03 HEAD X 04 DAYS = 12 HEAD
12
434
5219.52
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements