Bharat Coking Coal Limited Tender
... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 15,404Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BCCL_330703_1Tender No
BCCL/WJA/MND/SUR/2024-25/64Tender Authority
Bharat Coking Coal Limited ViewPurchaser Address
-Website
http://http://www.bcclweb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Transportation of 500m rails of 60lbs from 6th dip jn. to E-8 TG level inside from 6th dip through track & haulage. Total length of 60lbs rail= 500m. Total weight= 500m x 30.00 kg/m= 15000kg= 15.00tn. Nos. of trolley required @2.5tn load/trolley= 15/2.5= 6 trolley. Cost involve= 6manshift (unskilled)x 2 shift/trolley= 6 x 2xRs1316.6= Rs 15799.20
6
15799
94795.2
... More
Transportation of 180m rails of 60lbs from 500MH pit bottom to E-8 TG level inside from 6th dip through track & haulage. Total length of 60lbs rail= 180m. Total weight= 180m x 30.00 kg/m= 5400kg= 5.40tn. Analysis: nos. of trolley required @2.5tn load/trolley= 5.4/2.5= 2.16 say 2 trolley. Cost involve @ 6manshift (unskilled) per trolley= 6 x Rs1316.6= Rs 7899.6
2
7899
15799.2
... More
Handling of 340m tracklines (340x2=680mt rails) of 60lbs in transportation : i)180mt rail at 500MH pit bottom & E-8 TG D-18TG ii) 500mt rail at D-17 TG & E-8 TG. Total tonnage of 60lbs rails=680m x 30.0kg/m= 20400kg=20.40tn. Analysis:6unskilled manshift for 1te transportation. Cost involve = 6 x Rs1316.6= Rs 7899.60/te
20.4
7899
161151.84
... More
Transportation of 340 nos of NG sleeper from DR-3 ROK 500MH locolevel to E-8 TG of XVI(B) seam. Analysis : 40 NG sleeper / trolley i.e 340/40=8.50 say 9trolley. 3unskilled Manshift x 2shift required/trolley . Cost involve=3x2x1316.60== Rs7899.60/trolley
9
7899
71096.4
... More
Laying & fitting of 340mt trackline of 60 lbs from E-8 TG/6th dip Jn to E-8 Face tail end including one loopline of 40mt. 6 unskilled Manshift required for installation of 25mt track line.Cost/mt= 1316.60x6/25=Rs315.98/mt
340
315
107433.2
... More
Trackline packing of 60lbs rail upto length of 340mt. Analysis: Manshift required for 50mt packing of 60 lbs track line= 6manshift (unskilled). Cost for 50 mt trackline packing =6 x Rs.1316.60=Rs. 7899.60. So cost for 1mt packing=7899.60/50=Rs.157.99/mt
340
157
53716.6
... More
Transporting 2 no 60lbs crossing from from D-17 BG/8thdip to E-8 TG . Analysis: Manshift required for 1 crossing= 8manshift (unskilled)* 2shift. Cost for one crossing =8x2x1316.60=Rs. 21065.60/crossing
2
21065
42131.2
... More
Laying - fitting of 2 no 60lbs crossing at E-8 TG loop line+ 1no 30 lbs crossing.Total =3no Analysis: Manshift required for laying-fitting of 1 crossing=8manshift (unskilled)* 2shift. Cost for one crossing =8x2x1316.60=Rs. 21065.60/crossing
3
21065
63196.8
... More
CMPF
-
-
-
... More
CMPF, Pension and admin. Charge of Employee Un Skilled
936
251
235310.4
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%