Bharat Coking Coal Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
AI Insights
Technical
Technical
Class Of Bidder
... View More
Class-I and Class-II.
Bid Capacity
... View More
The bid capacity required in the given tender is related to the financial turnover of the bidder. The bidder's average annual financial turnover during the last 3 years should be at least 30% of the estimated cost put to tender. The formula to calculate the bid capacity is: (Bid Capacity) = 0.3 * (Estimated Cost put to tender) However, the estimated cost put to tender is not provided, so the exact bid capacity required in terms of value cannot be calculated. The average annual financial turnover can be calculated as: (Average Annual Financial Turnover) = (Total Turnover for the last 3 years) / 3 Where, Total Turnover for the last 3 years = (Turnover for the year 1 + Turnover for the year 2 + Turnover for the year 3) Additionally, the financial turnover shall be given a weightage to bring them at the current price level by adding 5% for each completed year after the end of the respective financial year. Since the estimated cost put to tender is not given, the exact bid capacity required in terms of value cannot be calculated, but the formula is provided.
Technical Capacity
... View More
The required prior work experience for the bidder includes completion of similar works, with specific values and percentages mentioned. The experience can be in the form of: - Three similar completed works each costing not less than 40% of the estimated cost put to tender.
- Two similar completed works each costing not less than 50% of the estimated cost put to tender.
- One similar completed work costing not less than 80% of the estimated cost put to tender.
The cost of previous completed works will be given a simple weightage of 7% per year to bring them to the current price level. However, another source mentions that the cost of previous completed works shall be given a simple weightage of 5% per year to bring them at the current price level. The bidder needs to provide a certificate of completion of similar work, if applicable, along with other documents such as work order, BOQ, and TDS for the work(s), if applicable, and a financial turnover certificate of the last 3 years, if applicable. A Satisfactory Work Completion Certificate issued by the employer against the experience of similar work is required, containing all the information furnished by the bidder online.
Costs
EMD
₹ 4,25,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction Of Pqc Coal Transportation Road At Various Places Under E.j Area.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BCCL_327693_1Tender No
BCCL/CIVIL/EJA/2024-25/eNIT/86Tender Authority
Bharat Coking Coal Limited ViewPurchaser Address
-Website
http://http://www.bcclweb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine
aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing).
1360
-
-
... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread,compacted and finished in a continuous operation including provision of contraction, expansion,construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to linesand grades as per drawing
2677.5
-
-
... More
Construction of Subgrade and Earthen Shoulders (Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
743.75
-
-
... More
Surface Drains in Soil Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material
to be used in embankment within a lead of 50 metres (average lead 25 metres).
3400
-
-
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%