Bharat Coking Coal Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 7,028Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Trans And Install Of One Kg-8 Belt From D-18tg/10th Dip Jn Of Xvi(t) To 1st Level/4th Dip Jn In Xv(b) Seam And Trans Of 200mt Belt Structure An 200mt Pvc Belt Of 1000mm Belt From D18bg Level Inside Of 10th Dip Of Xvi(t) To 0 Level/4th Dip Of Xv(b)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BCCL_316400_1Tender No
BCCL/WJA/MND/SUR/2024-25/35Tender Authority
Bharat Coking Coal Limited ViewPurchaser Address
-Website
http://http://www.bcclweb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Manual Transportation of one KG8 belt drive head(Complete set) from "0"level/4th dip Jn to 1st level/4th dip junction of XVI(B) seam . No. of Unskilled manshift required for Base frame+ 3 No. of Drums+ gib frame + gear box + Motor +switches+ Power cables & other accessories =30 unskilled. Cost involve=30x 1316.60= Rs.39498.00
1
39498
39498
... More
Debris cleaning for installation of base frame=3.5x2.2x0.6=4.62m3. Analysis : For 4m3 cleaning=3 unskilled i.e( 3 x 1316.60)/4=Rs.987.45/m3
4.62
4562
987.45
... More
Installation of one KG belt at "1st"level /4th dip junction of XVI(B) seam. Analysis: 6 Semiskilled x 6 shift i.e 36x 1350.60=Rs. 48621.60/no
1
48621
48621.6
... More
Manual transport of 200 m belt structure (legpost- 67, brackets- 67, channels- 134, top roller- 200, bottom roller- 20) of 1000 mm belt conveyor from D-18 BG level inside of 10th dip to 9th dip/D-18 BG junction. Analysis: Manshift required for 24m belt structure manual transport= 8 manshift/shift. Total manshift= 200/24 x 8 manshift= 66.66 say 67manshift (Unskilled). Cost involve=8 x 1316.60/24=438.86/mt
200
87772
438.86
... More
Transporting (by track & haulages )of 200 m belt structure of 1000mm belt from D-18 BG/10th dip junction to 4th dip/0 Level junction. (a) Legposts- 67 @ 12/trolley=5.58 say 6 Trolley, (b) Brackets- 67 @ 12/trolley= 5.58 say 6 Trolley, (c) Channels- 134 @40/trolley= 3.35 say 4 Trolley, (d) Top rollers+bottom rollers-220 @ 100/trolley= 2 .2 say 2 trolley. Total = 6+6+4+2=18 trolley. (Analysis: 2 Shift x 6 manshift(Unskilled)/2trolley . Cost involve =2 x (6/2x1316.60)=7899.60/trolley
18
142192
7899.6
... More
Manual transportation 200mt length of 1000 mm used PVC belt from D-18BG inside to 9th dip/D-18 BG Junction in XVI(T) seam. Man Shift required : 12 unskilled/100mt i.e 200/100x12=24manshift. Cost involve =24x1316.60=31598.40/200=Rs.157.99/mt
200
31598
157.99
... More
Loading,Transportation by track & haulages of( 200mt length), 1000 mm used belt from 10th dip/D-18 BG Junction to 4th dip/0 Level junction in XV(B) seam and Unloading
Man Shift required : For 200mt transportation =10manshiftx 3 shift=30manshift (Unskilled). Cost involve = 1316.60x 30/200=Rs.197.49/mt.
200
39498
197.49
... More
Belting including laying-fitting of 200mt PVC belt from 0 level to 1st level gallery near 4th dip Jn. in XVI(B). For belting of 200mt PVC belt =36Manshift (Unskilled) required. Cost involve for 200mt=36 x 1316.60=47397.6/200= Rs.236.98/mt
200
47396
236.98
... More
Manual transportation of 60 no. of 2 inches steel pipes in D-18 B/G from inside 10th D/R and stacking it up at 9th dip junction D-18 B/G @6 Manshift required/30 pipe/shift) = Total manshift=6/30*60=12 manshift(unskilled) cost involved /pipe=(12 x1316.60)/60=Rs.263.32/pipe
60
15799
263.32
... More
CMPF
-
-
-
... More
CMPF, Pension and admin. Charge of Employee Un Skilled
390
98046
251.4
... More
CMPF, Pension and admin. Charge of Employee Semi Skilled
36
9284
257.9
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements