Bharat Coking Coal Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 16,235Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BCCL_327204_1Tender No
BCCL/WJA/MND/SUR/2024-25/68Tender Authority
Bharat Coking Coal Limited ViewPurchaser Address
-Website
http://http://www.bcclweb.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Cutting in Hard rock in roof A :TG of E-8 panel : = (6.3 +1.0+1.0)x 1.1 x 2wall=18.26m3 B :BG of E-8 panel =(5.60+1.0+1.0)x1.1.0 x2wall=16.72m3 Total(A+B)=34.98m3
34.98
12774
446850.96
... More
Brick work (1:4)with FPS bricks CD-50 bricks in foundation & plinth= A TG of E-8 panel: In side= (1.5+0.80) x 1.0 x 1.0 x 2side x 2wall=9.20m3 In floor=(1.0+6.3+1.0) x 1 x 0.80x2wall=13.28m3 Total(A)=22.48m3 B=BG of E-8 panel :In side= (1.5+0.80) x 1.0 x 1.0 x 2side x 2wall=9.20m3 In floor=(1.0+5.60+1.0) x 1 x 0.80x2wall=12.16m3 Total(B)=21.36m3 & Total(A+B)=43.84m3
43.84
6246
273849.63
... More
Brick work (1:4)with FPS bricks CD-50 bricks in super structure plinth level up to V-level in all shape & size A :TG of E-8 panel In side=(2.7-1.5+0.3)x1.0x2side x 2wall= 6.00m3 B: BG of E-8 panel In side=(2.5-1.5+0.3)x1.0x2side x 2wall= 5.20m3 Total=11.20m3
11.2
7170
80306.24
... More
Providing two extra lead for carrying Bricks,(1 at surface + 1 in UG) ie 2leadx 0.59844=Rs1.20/Bricks For (43.84+11.20) =55.04 x 494 bricks=227300 bricks
27300
-
18018
... More
Providing two extra lead for carrying sand,(1 at surface + 1 in UG) ie (2 x 320.59)=Rs641.18/m3 of sand Sand For B/W=55.04x0.26=14.31m3
14.31
351
5030.82
... More
Providing two extra lead for carrying cement, (1 at surface + 1 in UG) ie (2 x190.85)= Rs381.70/te Cement For B/W=55.04x1.90=104.58bagsx50/1000=5.23 te
5.23
203
1064.93
... More
Transportation of meterials through winch/ haulage including loading & unloading at 6th dip from Jn.of Loco lataral & 6th dip XVI(B) seam & jn.of 6th dip/ TG & BG E-8,XVI(B) seam-500MH @ 500 bricks/Mine car, sand & other materials@2.20m3/Minecar ,Cement@30bags/Minecar For bricks=27300/500=54.60 Minecar For Sand & Other meterials =14.31/2.2=6.50mine car,For cement =104.58/30=3.49Minecar Total=54.60+6.50+3.49=64.59minecar
64.59
3949
255117.58
... More
Transportation of empty tubs through winch/ haulage including loading & unloading at 6th dip of E-8 TG & BG, XVI(B) seam to locolateral Jn.of 400MH main line through 6th rise.
64.59
1316
85039.19
... More
CMPF
-
-
-
... More
CMPF, Pension and admin. Charge of Employee Un Skilled
564
197
111305.4
... More
CMPF, Pension and admin. Charge of Employee SemiSkilled
309
205
63354.27
... More
CMPF, Pension and admin. Charge of Employee Skilled
26
212
5525.26
... More
Total impact of GST for the purpose of CTC
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements