Archaeological Survey Of India Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 58,436Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Minor Civil And Electric Works (unprotected Monuments) To Step Well (baoli) Math Navratnagarh, Sisai Distt. Gumla
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ASI_832138_1Tender No
8/451/W/2024-25/MW-(Con)Tender Authority
Archaeological Survey Of India ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Minor Civil and Electric works (Unprotected Monuments) to Step well (Baoli) Math Navratnagarh, Sisai Distt. Gumla
Minor Civil and Electric works (Unprotected Monuments) to Step well (Baoli) Math Navratnagarh, Sisai Distt. Gumla
BOQ Items
Resetting of damaged, decayed and worn out composite masonry of special size brick using 35% Old and 65% New and R.R. stone structure members 65% Old and 35% New using lime surkhi mortar in 1:1:1:1 ( 1 lime putty :1 surkhi :1 sand: 1 brick aggregate 10mm to 20mm ) matching with existing ancient texture of structures very carefully including cost of labours, materials, T&P, curing etc complete as per directions and approval of Engineer in charge.
21.54
-
-
Taking out the dislodged , veneering worn out and decade stone structure layer by layer very carefully chiseling and bringing down use full material to the ground by chain pulley and pinning the core wall with disposal of rubbish including cost of labours and T&P etc. complete as per directions and approval of Engineer-in-charge
2.5
-
-
Resetting of damaged, decayed and worn out stone structure members with 30 % Old and 70% New at lime surkhi mortar in 1:1:1:1 ( 1 lime putty :1 surkhi :1 sand: 1 brick aggregate 10mm to 20mm ) matching with existing ancient texture of structures very slowly and carefully including cost of labours, materials, T&P ,curing etc complete as per directions and approval of Engineer in charge
5.16
-
-
Taking out existing weathered / Damaged lime concrete from floor manual mean using small hand hammer and chisel only without damaging the structure including disposal of material within 200mtrs lead including cost of labours and T&P etc. complete as per directions and approval of Engineer-in-charge.
3.68
-
-
Laying 15 cm thick lime concrete using 50 % mortar of proportion 1:1:1:1 ( 1 lime putty :1 surkhi :1 sand: 1 brick aggregate 10mm to 20mm ) with 20 mm nominal size brick aggregate including ramming, maintaining proper gradient, curing, cost of materials, labours and T&P etc. complete as per directions and approval of Engineer in charge.
13.13
-
-
Taking out 60mm avg. existing weathered/Damaged mortar from outer and inner surface by manual mean using small hand hammer and chisel only without damaging the structure including raking out joints, disposal of material within 200mtrs lead, cost of labours and T&P etc. complete as per directions and approval of Engineer-in-charge.
163.73
-
-
Providing and laying 60mm avg. thick lime plaster to the outer and inner surface of the walls, ceiling, roof ,parapet wall etc in lime surkhi mortar in proportion 1:1:1:1 ( 1 lime putty :1 surkhi :1 sand: 1 brick aggregate 10mm to 20mm ) layer by layer very carefully to match with the existing plaster after raking out joints ,curing including cost of materials, labours and T&P etc. complete as per directions and approval of Engineer-in-charge.
163.73
-
-
Resetting of stuccos with repairing cracks, voids, crevices and restoring the flaked out plaster including molding, curving with ornamental beads etc in 1:1:1:1 ( 1 lime putty :1 surkhi :1 sand: 1 brick aggregate 10mm to 20mm ) to match with the existing texture etc. very carefully without damaging the original one, cost of materials, labours and T&P etc. complete as per directions and approval of Engineer-in-charge.
16.37
-
-
Grouting, saturating and consolidating the inner core of the composite masonry i.e. brick & stone masonry after proper cleaning the surface through the both gravitational and mechanical force with the help of liquid lime mortar in proportion 1:1:1:1 ( 1 lime putty :1 surkhi :1 sand: 1 brick aggregate 10mm to 20mm ) including stitching the cracks, cost of materials, labours and T&P etc. complete as per directions and approval of Engineer-in-charge.
6.14
-
-
Petty patch stones mending work/ water proofing in the cornices grooves and moulding features where ever bulged and out of plumb in the stone masonry with epoxy mortar and pinning with S.S. Anchors up to the desired depth as per the site condition including cost of materials, labours and T&P etc. complete as per directions and approval of Engineer-in-charge.
1.13
-
-
"PMC Grouting of projection area with acrylic polymer emulsion added with Lime one part having polymer loading 10% with appropriate dose non shrink powder 0.05 part (Cebex) and plasticizer 0.05 part having pressure 0.2 to 0.5 kg/sqcm including cost of materials, labours and T&P etc. complete as per directions and approval of Engineer-in-charge.
25
-
-
Removal of debris/malwa such as dead lime plaster, concrete, stone block etc. from work spot to suitable dumping place by mechanical load including loading & unloading , carriage and cleaning of area , cost of labours and T&P etc. complete as per directions and approval of Engineer-in-charge.
22.55
-
-
Providing and fixing of temporary support system at critical locations of all around the structure including centering and shuttering ,strutting, propping etc. and removal of form for all heights etc. complete as per directions and approval of Engineer-in-charge.
12.5
-
-
Provision for Earth work in Excavation/Scientific Clearance of around the Structure as per direction of Engineer-in-charge.
55.8
-
-
Provision for vegetation clearance all around the Structure as per direction of Engineer-in- charge
115
-
-
Provision for Watch and Ward for Execution of work and day to day maintain the working site and watch and ward for safety of material and equipment's
720
-
-
Providing 10 cm thick brick ballast (20mm to 40mm) in the foundation of floor including making surface, ramming, consolidating and grouting with fine sand cost of materials, labours and T&P etc. complete as per directions and approval of Engineer-in-charge.
6.3
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements