University Of Jammu Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
University Of Jammu Tender
Civil And Construction
Building Construction
Eprocure
Opening Date6 Jun 2024
Closing Date22 Jun 2024
Tender Amount₹ 4,08,000
Costs
EMD
₹ 8,160Document Cost
₹ 300Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UDJK_249144_1Bid Award Id
ViewTender No
F(E.tend) (UCD)/KU/03/24Tender Authority
University Of Jammu ViewPurchaser Address
-Website
http://http://jammuuniversity.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of foundation for Self Supported Chimney at Workshop Block situated at Zakura Campus, University of Kashmir
Construction of foundation for Self Supported Chimney at Workshop Block situated at Zakura Campus, University of Kashmir
BOQ Items
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering. All work up to all levels.1:4:8 (1Cement: 4 coarse sand: 8 grade stone aggregate 40mm nominal size) Crushed
0.9
5131
5702
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses plinth and string courses fillets, columns, pillars, beams, piers, abutments, suspended floors, posts and struts, etc. up to all floor level excluding cost of centering, shuttering, finishing and reinforcement
1:1.5:3 (1 Cement: 1.5 Coarse sand: 3 graded stone agg. 20mm nominal size) crushed
13.5
128250
9500
Steel Work
Reinforcement for RCC works including straightening, cutting, bending placing in position and binding all complete up to all floors. Thermo mechanically heated bars.
1350
166320
123.2
Form work.
Centering and shuttering including strutting propping etc. removal of form work in Suspended floors, roofs, landings, balconies, access plat forms, Lintels, beams, plinth beams, girders, bressumers, cantilevers, Columns, pillars, piers, abutments, posts and struts and edges of slabs etc. (M.S. Plates/Ply wood)
18
12924
718
Repair to plaster of thickness 12mm to 20mm in patches of area 2.5 sqm and under, including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar, including disposal of rubbish, all complete as per the directions of EIC
2.25
1175
522.65
12mm thick cement plaster on half brick / concrete wall of mix 1:6 (1cement: 6 coarse sand)
18
4680
260
Supply and fixing of foundation bolts of required length including cost of nuts, washers complete
500
75000
150
Note. The quoted percentage (%age) should preferably be in fractional form in order to minimize concurrence of similar quoted rates
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements