University Of Jammu Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

University Of Jammu Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date13 Jan 2025
Closing Soon3 Feb 2025
Tender Amount₹ 40,00,000 
Notes
Download

Costs

Summary

Development Of Playground At Mirza Bagh, Kashmir University

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation by manual means in foundation trenches or drains including surface excavation, including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead as directed from edge of cutting. All kinds of soil including uprooting of roots and stems

109.58

286

31339.88

... More
Supplying and laying of stone soling hand packed tightly including ramming, watering and carriages complete.

18.26

1250

22825

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) including carriages.

9.13

5702

52059.26

... More
Providing and laying in position specified grade of reinforced cement concrete including curing and all carriages but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size

22.43

8031

180135.33

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. Including all carriages All work up to all levels. 1:2:4 (1Cement: 2 coarse sand:4 graded stone aggregate 20mm nominal Size) Crushed

60.88

7091

431700.08

... More
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns etc. for mass concrete. Block work

372.45

286

106651.06

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more.

2467.3

123

303971.36

... More
Engagement of Labour for misc works.

20

750

15000

... More
Brick work with FPS bricks of class designation 75 in super structure up to all floors. In cement mortar 1cement: 6 fine sand mortar

13.72

9900

135828

... More
12mm thick cement plaster on brick / concrete wall of mix 1:6 (1cement: 6 coarse sand)

406.35

266

108170.37

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded

324

138

44809.2

... More
Note. The quoted percentage (%age) should preferably be in fractional form in order to minimize concurrence of similar quoted rates

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.