University Of Jammu Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
University Of Jammu Tender
Education And Training Services
Eprocure
Opening Date19 Oct 2024
Closing Date8 Nov 2024
Tender Amount₹ 4,54,000
Costs
EMD
₹ 9,080Document Cost
₹ 300Tender Fee
Refer Documents
Summary
Upgradation/extension Of Language Lab In The Department Of Linguistics At Main Campus
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UDJK_260803_1Bid Award Id
ViewTender No
F(E.Tend) (UCD)/KU/22/24Tender Authority
University Of Jammu ViewPurchaser Address
-Website
http://http://jammuuniversity.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Upgradation/Extension of Language Lab in the Department of Linguistics at Main Campus
Upgradation/Extension of Language Lab in the Department of Linguistics at Main Campus
BOQ Items
Dismantling of existing wooden ceiling including stacking of serviceable material and disposal of unserviceable material as directed with all leads complete.
65.24
200
13048
Cleaning of pigeon droppings etc including stacking of serviceable material and disposal of unserviceable material as directed with all leads complete.
65.24
180
11743.2
Providing and fixing water proof BWR ply wood (Shuttering ply) ISI marked including cost of nails adhesive etc. complete at all places 12mm
78.06
1200
93672
Structural steel work in built up sections/ tubular sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded
250
138
34625
Providing hoisting and fixing trusses / purlins / rafters / posts, post plates, in planks and any sort of work or like components, including cost of screws nails etc. complete.First class budloo/imported wood.
0.4
65000
26000
Brick Masonry in 1:6 cement mortar (1 cement: 6 coarse sand) with second class (75A) bricks up to desired height
0.49
9500
4655
12mm plaster on fair side of brick work in 1;6 mix incl. cost of scaffolding complete.
18.6
268
4992.24
Wall painting with plastic emulsion paint (one or more coats) of approved brand and manufacture to give an even shade. Old work
110.13
86
9471.18
Removing white or color wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
22.02
14
310.48
Providing and applying Plaster of Paris putty of 1mm thickness over plastered surface to prepare the surface even and smooth complete
22.02
138
3040.96
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on old work
51.51
84
4370.62
Providing & fixing suspended false ceiling using 12.5mm thick Indian gypsum boards confirming to IS 2095-1982 and GI framework of Gyp steel or approved equivalent comprising of following. 1. GI perimeter channel of 0.55mm thick having one flange of 20mm, another of 30mm and web of 27mm fixed to brick wall partition along periphery of ceiling with the help of nylon sleeves and screws at 610mm c/c 2. GI intermediate channel ( size, 45mm web, two flanges each of 15mm & thickness 0.9mm ) suspended from the soffit / ceiling at 1200mm c/ c spacing. 3. GI ceiling sections of 0.55mm thick having knurled web of 51.5mm and two flanges each of 26mm with leaves of 10.5mm fixed to intermediate channel with the help of connecting clip at direction perpendicular to the intermediate channel at spacing of 600 mm c/c, . GI suspender angle of 25mmx10mm and thk.0.55mm at spacing of 600mm c/c, fixed to the ceiling / soffit using GI cleat angle 25mm x 25mm, 0.55mm thk. Cleat angle to be fixed to the ceiling / soffit using 6mm dia anchor fastener. Gypsum board to Be finished with Jointing tape and Jointing compound including application of One coat primer as Per Gypsum board Manufacturer specification. The rate quoted shall include making cut outs for fixing light fittings, grills, diffusers, speakers, smoke detectors, sprinklers etc. Cut outs have to be made with provision of the frame along perimeter of the cut outs/ opening with channels/ ply to support the ceiling adequately. No extra payment shall be made for making cut outs.
71.84
1400
100576
Painting, two or more coats with emulsion paint of approved brand on internal walls and ceilings as required to give an even shade including preparing the surface, applying primer coats, etc. complete all to the satisfaction of EIC.(new work)
71.84
120
8620.8
Providing and applying wall putty of avg. 2mm thickness to line level and plumb including surface preparation; required punning to be undertaken and completed in workman-like manner, to ensure desired finishing standards, as directed by EIC
71.84
216
15517.44
Providing and laying pop cornice in required design and pattern 50-75mm thickness.
23.78
170
4042.6
Dismantling safely, shifting and refixing of existing conference table
1
10000
10000
Note. The quoted percentage (%age) should preferably be in fractional form in order to minimize concurrence of similar quoted rates
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements