Tourism Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Tourism Department Tender
Civil Works Others
Eprocure
Opening Date5 Nov 2018
Closing Date13 Nov 2018
Tender Amount₹ 6,00,000
Costs
EMD
₹ 12,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_Tourm_64720_1Bid Award Id
ViewTender No
enit48Tender Authority
Tourism Department ViewPurchaser Address
-Website
http://http://tourism.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Development of Ziyarat Sharief Tak Shah RA Anantnag By way of construction of retaining wall and foot path Devri pillars and main gate
Development of Ziyarat Sharief Tak Shah RA Anantnag By way of construction of retaining wall and foot path Devri pillars and main gate
BOQ Items
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) using crushed aggregate including all carriages / head load upto site of work complete.
28.56
-
-
... More
Providing and laying in position specified grade of reinforced cement concrete including the cost of centering, shuttering, finishing and reinforcement-all work upto plinth level in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) including all carriages upto site of work complete.
3.57
-
-
... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete (Thermo-mechanically treated bars)
200
-
-
... More
Providing & laying of Ist class qulality GRC 25 mm ( Rubber Molded Tiles ) over 12 mm thick bed of cement mortar in 1:3 mix (1 cement : 3 coarse sand ) jointing with grey cement slurry @ 3.30 kg/Sm including pointing the joints with matching pigment shades, incld. all carriages upto site of work complete.
1027
-
-
... More
Random rubble masonry with hard stone from quarry in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with cement mortar 1:6 (1 cement : 6 coarse sand) including all carriages / head load upto site of work complete.
28.49
-
-
... More
Dry random rubble masonry with hard stone in foundation and plith.(using quarry stone with bond stone) including all carriages / head load upto site of work complete.
19
-
-
... More
Centering & shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete.(12mm thick water proof ply board)
28.29
-
-
... More
Supply / filling of stones behind R/wall tightly hand packed including all carriages / head load upto site of work complete.
14.81
-
-
... More
Stone work in plain Ashler in superstructure upto floor V level in cement mortar 1:6 (1 cement: 6 course sand) incld. pointing with cement mortar 1:2 (1 white cement :2 stone dust) with an add mixture of pigment matching the stone shade (Devri stones) including extra labour for rectangular pillars and arch portion and including all carriage upto site of work complete.(Fine chiseled dressed)
130
-
-
... More
Stone work in plain Ashler in cornices 125mm , in cement mortar1:6 (1 cement :6 course sand) including pointing with cement mortar 1:2 (1 white cement :2 stone dust) with an add mixture of pigment matching the stone shade (Devri stones fine chiseled dressed) and including all leads, lifts & all carriage upto site of work complete.
17.32
-
-
... More
Engagement of labours for clearance of site / other dirt, dust etc. and disposal of same material as directed by Engineer-in-charge complete in all respects.
9
-
-
... More
Steel work welded in built up sections, framed work, incld.cutting,hoisting, fixing in position and applying coat of approved steel primer, using structural steel as required in grating frames, guard bars,ladders, railing,brackets, gates and similar work.(as per approved design) incld. all carriages upto site of work complete. (Ornamental type)
252
-
-
... More
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine fand) Raised and cut pointing including all carriages upto site of work complete.
53.2
-
-
... More
15 mm cement plaster on the rough side of single or half brick wall finished with a floating coat of neat cement of mix 1:4 ( 1 cement : 4 fine sand) incld. all carriages upto site of work complete.
14.15
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements