Soil And Water Conservation Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Soil And Water Conservation Department Tender

Eprocure
Opening Date22 Feb 2019
Closing Date27 Feb 2019
Tender Amount₹ 7,77,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil.

32

-

-

... More
Earthwork in surface excavation not exceeding 30cm in depth but exceeding 1.5mtr in width as well as 10sqm on plan including disposal of excavated earth upto 1mtr from cutting edge, lift upto 1.5mtr, disposed earth to be levelled and neatly dressed in : All kinds of Soil:

1010

-

-

... More
Extra over item 1.04 for every aditional lead of 25 mtr. upto 250mtr. and deposit to a level of 1.5 mtr

1010

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work upto plinth level.1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size)

28.5

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work upto plinth level.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size)

45

-

-

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement. 1:2:4 (1 cement : 2 coarse sand : 4 graded crushed stone aggregate 20mm nominal size)

9.5

-

-

... More
Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size) (A) Crushed

27.5

-

-

... More
Centring and shuttering incl. strutting, propping etc. and removal of form for : Foundations, footings, bases of columns

424

-

-

... More
Centring and shuttering incl. strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts ( Extra for shuttering in circular work (20% o f respective centring and shuttering items)

88.5

-

-

... More
Centring and shuttering incl. strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and walls. Under 20cms wide

144

-

-

... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars

340

-

-

... More
Brick work with common burnt clay F.P.S.(non-modualar) bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 ( 1 cement : 6 coarse sand) + Extra for brick work in superstructure above plinth level upto floor V level. (By manual means)

7.5

-

-

... More
Pointing on brick work cement mortar 1 : 3 (1 cement : 3 fine sand) Ruled Pointing

33

-

-

... More
Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. including all carriages.

285

-

-

... More
Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 grams/litre

88.5

-

-

... More
Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats

88.5

-

-

... More
Finishing walls with water proofing cement paint of required shade New work (two or more coats) applied @3.84 kg/10sqm

33

-

-

... More
Finishing walls with water proofing cement paint of required shade Old work (one or more coats) applied @2.20 kg/10sqm over priming coat of primer applied @ 0.80 litres/10 sqm complete including cost of priming coat.

75

-

-

... More
Supply of Beldar / Mazdoor for carrying out different works such as levelling, Excavation, Filling and other types of work as and when needed at site

85

-

-

... More
Carriage of Materials from Source to site of work by M T Cement, average 2 Km by MT

18

-

-

... More
Carriage of Materials from Source to site of work by M T Sand, average 10 Km by MT

40.5

-

-

... More
Carriage of Materials from Source to site of work by M T Bajri upto 40mm, average 10 Km by MT

50

-

-

... More
Carriage of Materials from Source to site of work by M T Bajri 40mm and above, average 10 Km by MT

25.5

-

-

... More
Carriage of Materials from Source to site of work by M T Bricks average 25 Km by MT

4750

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.