Soil And Water Conservation Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Soil And Water Conservation Department Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date30 Jan 2025
Closing DateCancelled
Tender Amount₹ 10,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Carriage of stones average lead of 600 m by head load Qtty vide (3) = 246.8 cum

246.8

728

179912.26

... More
Supply of crate wire mesh (4”x4”) including carriage up to site of work 1x 16’-0”x 16’-0”= 256 sft Lids 2x 4’-0”x4’-0”= 16 sft 288sft @ 220gram / sft = 63.36kgx 40= 2534.4 kg

2534.4

94

238385.66

... More
LAYING OF CRATE WIRE STRUCTURE AT Shok Baba Gugerpatti UNDER STRATEGIE ACTION PLAN FOR THE YEAR 2024-25

-

-

-

... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil 1m from cutting edge 1x16’-0”x5’-0”x [6”+ 1’-0”] = 60cft or 1.70cum x10= 17 cum 2

17

436

7412

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones 16’-0”x4’-0”x4’-0’=256cft or 7.25cum Deduct 15% voids = 1.08 cum T= 6.17 cum x 10= 61.70 cum

61.7

337

20820.67

... More
Supply of crate wire mesh (4”x4”) including carriage up to site of work 1x 16’-0”x 16’-0”= 256 sft Lids 2x 4’-0”x4’-0”= 16 sft 288sft @ 220gram / sft = 63.36kgx 10= 633.6 kg

633.6

94

59596.42

... More
Carriage of stones average lead of 600 m by head load Qtty vide (3) = 61.70 cum

61.7

728

44978.07

... More
CONSTRUCTION OF DRSM CHECK DAMS AT Shok Baba Gugerpatti UNDER STRATEGIE ACTION PLAN FOR THE YEAR 2024-25

-

-

-

... More
Construction of DRSM check dam with fashioning of stones to be used along the exposed faces with bond stones including earth work in excavation in all kinds of soils / ordinary rock/ hard rock (as per site) in trench with an average minimum depth of 6” throughout the length of foundation including all necessary lead and lifts, excluding cost of stones & bond stones, its carriage up to site of work, labour component, supervision etc, complete job. Qty. = 150 Cum 1x( 1.50m + 1.20m)/2 x 1.20m x 130m = 177cum D/d 15% voids = (-) 27 cum ----------------------------- Net Vol = 150.00 cum or say 150 cum

150

1099

164850

... More
LAYING OF CRATE WIRE STRUCTURE AT Sumlar (GujerpattiUNDER STRATEGIE ACTION PLAN FOR THE YEAR 2024-25.

-

-

-

... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil 1m from cutting edge 1x16’-0”x5’-0”x [6”+ 1’-0”] = 60cft or 1.70cum x8= 13.6 cum

13.6

436

5929.6

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones 16’-0”x4’-0”x4’-0’=256cft or 7.25cum Deduct 15% voids = 1.08 cum T= 6.17 cum x 8= 49.36 cum

49.36

337

16656.53

... More
Carriage of stones average lead of 600 m by head load Qtty vide (3) = 49.36 cum

49.36

728

35982.45

... More
Supply of crate wire mesh (4”x4”) including carriage up to site of work 1x 16’-0”x 16’-0”= 256 sft Lids 2x 4’-0”x4’-0”= 16 sft 288sft @ 220gram / sft = 63.36kgx 8= 506.88 kg

506.88

94

47677.13

... More
CONSTRUCTION OF DRSM CHECK DAMS AT Sumlar (Gujerpatti UNDER STRATEGIE ACTION PLAN FOR THE YEAR 2024-25.

-

-

-

... More
Construction of DRSM check dam with fashioning of stones to be used along the exposed faces with bond stones including earth work in excavation in all kinds of soils / ordinary rock/ hard rock (as per site) in trench with an average minimum depth of 6” throughout the length of foundation including all necessary lead and lifts, excluding cost of stones & bond stones, its carriage up to site of work, labour component, supervision etc, complete job. Qty. = 60 Cum 1x( 1.50m + 1.20m)/2 x 1.20m x 67m = 71cum D/d 15% voids = (-) 10.65 cum ----------------------------- Net Vol = 60.35 cum or say 59 cum

59

1099

64841



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.