Soil And Water Conservation Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Soil And Water Conservation Department Tender
Civil And Construction
Excavation
Eprocure
Opening Date22 Aug 2022
Closing Date27 Aug 2022
Tender Amount₹ 1,95,300
Costs
EMD
₹ 3,906Document Cost
₹ 200Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_SWCD_184126_5Tender No
eNIT No 04 of 2022-23 Dated 22.08.2022Tender Authority
Soil And Water Conservation Department ViewPurchaser Address
-Website
http://http://www.jkdosc.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 mt beyond 1 meter from cutting edge All kinds of soil
7.01
-
524.4
Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement : 6 Coarse Sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with : Cement mortar 1 : 6 (1 Cement : 6 Coarse Sand) (Nallah)
27.44
-
4400.5
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
1.12
-
5877.45
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m
11.34
-
198.7
Carriage of different Materials from source to site of work: Stone average 350 Mt by Manual Transport
20.43
-
495.23
Carriage of different Materials from source to site of work: Sand average 35 KMs by Mechanical Transport
8.73
-
479.42
Carriage of different Materials from source to site of work: Bajri upto 40mm average 35 KMs Mechanical Transport
1.01
-
479.42
Carriage of different Materials from source to site of work: Cement average 12 KMs Mechanical Transport
2.62
-
235.87
Carriage of different Materials from source to site of work: Sand and Bajri average 200 Mt Manual Transport
1.01
-
301.74
Carriage of different Materials from source to site of work: Cement average 200 Mt by Manual Transport
2.62
-
152.24
Add cost of providing and laying of over-flow pipe including earthwork, concreting, cost of pipe etc. (Complete Job)
1
-
5000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements