Soil And Water Conservation Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Soil And Water Conservation Department Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date23 Jan 2024
Closing DateCancelled
Tender Amount₹ 10,00,000
Costs
EMD
₹ 20,000Document Cost
₹ 700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_SWCD_270854_1Tender No
2024_SWCD_22012025Tender Authority
Soil And Water Conservation Department ViewPurchaser Address
-Website
http://http://www.jkdosc.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Carriage of stones average lead of 600 m by head load Qtty vide (3) = 246.8 cum
246.8
179912
44402281.6
... More
Supply of crate wire mesh (4”x4”) including carriage up to site of work
1x 16’-0”x 16’-0”= 256 sft
Lids 2x 4’-0”x4’-0”= 16 sft 288sft @ 220gram / sft = 63.36kgx 40= 2534.4 kg
2534.4
278386
705541478.4
... More
LAYING OF CRATE WIRE STRUCTURE AT Shok Baba Gugerpatti UNDER STRATEGIE ACTION PLAN FOR THE YEAR 2024-25
-
-
-
... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil 1m from cutting edge
1x16’-0”x5’-0”x [6”+ 1’-0”] = 60cft or 1.70cum x10= 17 cum 2
17
7412
126004
... More
Hand-packing stones in wire-crates; excluding cost of crates and stones 16’-0”x4’-0”x4’-0’=256cft or 7.25cum
Deduct 15% voids = 1.08 cum T= 6.17 cum x 10= 61.70 cum
61.7
20821
1284655.7
... More
Supply of crate wire mesh (4”x4”) including carriage up to site of work
1x 16’-0”x 16’-0”= 256 sft
Lids 2x 4’-0”x4’-0”= 16 sft 288sft @ 220gram / sft = 63.36kgx 10= 633.6 kg
633.6
59596
37760025.6
... More
Carriage of stones average lead of 600 m by head load
Qtty vide (3) = 61.70 cum
61.7
44978
2775142.6
... More
CONSTRUCTION OF DRSM CHECK DAMS AT Shok Baba Gugerpatti UNDER STRATEGIE ACTION PLAN FOR THE YEAR 2024-25
-
-
-
... More
Construction of DRSM check dam with fashioning of stones to be used along the exposed faces with bond stones including earth work in excavation in all kinds of soils / ordinary rock/ hard rock (as per site) in trench with an average minimum depth of 6” throughout the length of foundation including all necessary lead and lifts, excluding cost of stones & bond stones, its carriage up to site of work, labour component, supervision etc, complete job.
Qty. = 150 Cum 1x( 1.50m + 1.20m)/2 x 1.20m x 130m = 177cum D/d 15% voids = (-) 27 cum ----------------------------- Net Vol = 150.00 cum or say 150 cum
150
164850
24727500
... More
LAYING OF CRATE WIRE STRUCTURE AT Sumlar (GujerpattiUNDER STRATEGIE ACTION PLAN FOR THE YEAR 2024-25.
-
-
-
... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: in all kinds of soil 1m from cutting edge
1x16’-0”x5’-0”x [6”+ 1’-0”] = 60cft or 1.70cum x8= 13.6 cum
13.6
5930
80648
... More
Hand-packing stones in wire-crates; excluding cost of crates and stones
16’-0”x4’-0”x4’-0’=256cft or 7.25cum
Deduct 15% voids = 1.08 cum T= 6.17 cum x 8= 49.36 cum
49.36
16657
822189.52
... More
Carriage of stones average lead of 600 m by head load
Qtty vide (3) = 49.36 cum
49.36
35982
1776071.52
... More
Supply of crate wire mesh (4”x4”) including carriage up to site of work
1x 16’-0”x 16’-0”= 256 sft
Lids 2x 4’-0”x4’-0”= 16 sft 288sft @ 220gram / sft = 63.36kgx 8= 506.88 kg
506.88
47677
24166517.76
... More
CONSTRUCTION OF DRSM CHECK DAMS AT Sumlar (Gujerpatti UNDER STRATEGIE ACTION PLAN FOR THE YEAR 2024-25.
-
-
-
... More
Construction of DRSM check dam with fashioning of stones to be used along the exposed faces with bond stones including earth work in excavation in all kinds of soils / ordinary rock/ hard rock (as per site) in trench with an average minimum depth of 6” throughout the length of foundation including all necessary lead and lifts, excluding cost of stones & bond stones, its carriage up to site of work, labour component, supervision etc, complete job.
Qty. = 60 Cum 1x( 1.50m + 1.20m)/2 x 1.20m x 67m = 71cum D/d 15% voids = (-) 10.65 cum ----------------------------- Net Vol = 60.35 cum or say 59 cum
59
65940
3890460
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%