Small Scale Industries Development Corporation Limited Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Small Scale Industries Development Corporation Limited - SIDCO Tender
Civil And Construction
Construction Material
Machinery and Tools
Pipe Line Project
Eprocure
Opening Date30 Dec 2023
Closing Date4 Jan 2024
Tender AmountRefer Documents
Costs
EMD
₹ 1,71,820Document Cost
₹ 9,000Tender Fee
Refer Documents
Summary
Supply, Installation, Testing Commissioning Of Fire Hydrant Landing Values Piping Accessories
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SIDCO_240143_2Bid Award Id
ViewTender No
SIDCO/Constt/Div/1st/023/13Tender Authority
Small Scale Industries Development Corporation Limited ViewPurchaser Address
-Website
http://https://www.jksicop.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
80 mm
415
-
-
100 mm
185
-
-
150 mm
340
-
-
Providing and Fixing of below mentioned piping accessories
-
-
-
MS Flanges including Nuts/Bolts
Size = 80 mm Dia
170
-
-
Rubber Washers
Size = 80 mm Dia
200
-
-
MS Flange (Large Size) - Dia - As required with coupling of Fire hydrant valves.
20
-
-
GI/MS Tee
Size = 80 mm Dia
20
-
-
GI/MS Elbow (80 mm) Long size (around 1'6" length)
60
-
-
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed: a. For foundation of MS Angle Iron and MS Flat Iron framed Fire Hydrant Cabinets of all classfications including disposal of excavated earth beyond site or as directed at site of work.
93.6
-
-
Providing and laying of stone soling including watering ramming dressing levelling and consolidation by hand hammer and carriage complete. By Mechanical Transport including loading, unloading and stacking, carriage Beyond 10 km upto 20 km per km
a. For New Fire Hydrant Landing Valves
0.59
-
-
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level in 1:2:4 mix ( 1 cement :2 coarse sand : 4 graded stone aggregrate 40mm nominal size crushed including all carriages complete. For New Fire Hydrant Landing Valves
12.74
-
-
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
80
-
-
MS Framed Structure for enclosure of Fire Hydrant Landing Valves.Structural steel work in single section fixed with connecting plate including cutting hoisting fixing in position and applying a priming coat of approved steel primer including sign boards (as FH Valve)depicting the fire hydrant valve system including red oxide coating and red paint. complete. Steel cabinet with glass door and lock facilities.
For 20 New Fire Hydrant Landing Valves
704.4
-
-
Providing lock to the fire hydrant steel enclosure
Make - Thapar
20
-
-
Providing and Fixing of Steel Hinges 4" including welding, fixing, etc complete
40
-
-
Providing and Fixing of Handle 6"
Size - 25mm x 5mm
20
-
-
Design, Construction, Testing &Commissioning of RCC Reservoir of 150000 lts. capacity on Turn Key basis including fixing of C-Class MS Pipes for inlet/outlet washout and over flow facilities with all Sluice/Butterfly/NRV/All Contol valves and all necessary accessories such as lightening arrester, water level indicator, RCC/MS stair, man hole covers with frame with locking arrangements, standard pipe fittings etc. all complete including appropriate capacity Pumping and Piping system (Main Pump, DG Pump) with Servo Stabilizer, Control Panel, All Control cabling associated with the pumping system, GC Sheet with MS framed Pump House enclosure with lighting arrangements. The job includes design of reservoir on the basis of foundation bearing capacity of the soil. (The design should be vetted by Design Directorate Srinagar)
33039.65
-
-
Supply and Installation of Non percolating fire delivery hose of 70 mm. Diameter bound with GM couplings (Male-Female) of 63 mm. dia. (IS 636-1988) of 15 mts. Length - 02 lengths for each hydrant with one emergency (short) branch with GM Nozzle compatible with the above Landing Valves for each hydrant. The two fire hoses, the branch pipe and other related hydrant accessories shall be kept in a steel cabinet with glass door with locking facility. The steel cabinets to be kept in close custody of nearest unit holder for security reasons.
20
-
-
Supply and Installation of ABC stored pressure type fire extinguishers MAP90 consisting of welded M.S. cylindrical body, squeeze lever discharge valve fitted with internal discharge tube, 30 cms long high pressure discharge hose, discharge nozzle, suspension bracket, confirming to IS 13849-1993 finished externally with red enamel paint and fixed to wall with brackets with rawl plug / dash fasteners complete with internal charge for building. With all accessories/fittings as per approved standards.
a) Capacity 6.0 kg I.S.I marked
15
-
-
Supply and Installation of CO2 fire extinguishers fitted with discharge horn and provided with all accessories/fittings as per approved standards confirming to IS 2878-2004 fixed to wall with brackets with rawl plug / dash fasteners complete with internal charge for buildings.
a) Capacity 4.5 kg I.S.I marked
15
-
-
Supply and Installation of overload trip off by way of installation of electrical safety equipments outside all the buildings for all the elecrical equipments inside the building
1
-
-
Providing and fixing MS conduit of 16 SWG ISI marked (15:9537-1981, Part-11) complete with all fittings viz. tees, bends, junction boxes, clamps/supports etc. to be concealed in slabs/brick work as required or surface laid.
20mm dia
500
-
-
Providing and laying in PVC conduit PVC insulated ISI marked copper control cable in existing conduit (IS:694) from individual flow switches on each floor to annunciation panel installed in fire control room including sleeves cable clips, supports for horizontal runs etc. complete of size
500
-
-
Supplying, installing, testing and commissioning of following items in real/false/wall in M.S junction box with all installation accessories as per requirement.
-
-
-
i) Analog addressable multisensing detector below false ceiling (Photoelectric sensor for smoke and heat detector) with bases.
150
-
-
ii) Control Relay Module as per the specification.
8
-
-
iii) Addressable type Manual Call Point (Pull Station) as per specification.
8
-
-
Supplying, installing, testing and commissioning of annunciating panel with Addressable Hooter-cum-Strobe Unit (including control module) having desired control zone and zone indications along with 240 V battery and battery chargr to be mounted on wall surface including supply of all installation material, interconnections, cutting chases on wall and mending good the damages, painting, earthing, complete as required.
4
-
-
Supply Installation Testing and commissioning of hooters
5
-
-
Repairing of Wall of all buildings by way of Paint, Plaster, Cement, etc and making the base for pumps
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements