Sher E Kashmir University Of Agricultural Sciences And Technology Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Sher E Kashmir University Of Agricultural Sciences And Technology - SKUAST Tender

Works
Agriculture or Forestry Works
Eprocure
Opening Date13 Feb 2025
Closing DateCancelled
Tender Amount₹ 1,40,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
please see tender document
Construction of 100 MT Cold Store Under Hi-Tech Infrastructure for Multiplication, Pre And Post-Harvest Management of the walnut Germplasm (NABARD) at Kulangam Kupwara, SKUAST-K.
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2. SCOPE OF WORK

-

-

-

... More
A. CIVIL WORKS

-

-

-

... More
1. Excavation & Earthwork • Site clearance and marking, removal of vegetation or debris. • Excavation for foundation (minimum depth as per soil conditions and structural design). • Compaction using mechanical means to achieve required soil bearing capacity. • Anti-termite treatment at the foundation level.

-

-

-

... More
2. Foundation • RCC footings as per approved structural drawings with proper reinforcement. • Minimum M20 grade concrete for foundations with water-proofing treatment. • Reinforcement steel Fe 500 TMT bars as per IS standards. • Casting of footings with proper curing and testing of cube samples.

-

-

-

... More
3. Flooring • PCC base layer (M15) 100 mm thick with proper leveling. • Reinforced Concrete Floor (M25) with reinforcement mesh (8 mm dia @ 150 mm c/c both ways) 100 mm. • Floor insulation with 100 mm XPS or equivalent thermal insulation to prevent condensation. • Proper drainage slope provided to facilitate cleaning and hygiene maintenance

-

-

-

... More
4. Plinth and Drainage • 600 mm plinth height with RCC coping. • Peripheral stormwater drainage system using PVC pipes with proper slope. • RCC apron around the building to prevent water seepage and settlement

-

-

-

... More
5. Wall Construction • Insulated Sandwich Panels (minimum 100 mm thick PUF) for thermal efficiency. • RCC pedestal at suitable intervals as per structural requirements. • Installation of vapor barriers to prevent moisture ingress. • Proper sealing of joints using polyurethane-based sealants.

-

-

-

... More
6. Doors & Windows • Cold storage insulated doors (minimum U-value 0.3 W/m²K, food-grade material, air- tight sealing). • Windows (if applicable) to be double-glazed, energy-efficient, and fitted with air-tight gaskets. • Heavy-duty stainless steel hardware for long durability and corrosion resistance.

-

-

-

... More
B. PRE-ENGINEERED BUILDING (PEB) STRUCTURE

-

-

-

... More
1. Structural Framework • Hot Rolled or Cold Rolled Steel Frame as per IS 800:2007. • Anti-corrosion paint coating & Galvanised Purlins. • Welded and bolted connections ensuring structural stability. • Load-bearing capacity designed as per IS standards for seismic and snow loads.

-

-

-

... More
2. Roofing System • PUF Insulated Sandwich Panels (minimum 100 mm thick, fire-retardant grade). • Roof slope as per Srinagar’s snow and rainfall conditions. • Water-proofing membrane and proper drainage system.

-

-

-

... More
3. Wall Cladding • PUF panels (minimum 100 mm thick) with pre-painted galvanized steel (PPGI) sheet finish. • High thermal insulation with energy-efficient coatings. • Proper weather-sealed joints for airtight construction.

-

-

-

... More
C. REFRIGERATION SYSTEM (AIR COOLED FREON DX SYSTEM)

-

-

-

... More
1. Cooling Capacity • Designed for a 100 MT Walnut Cold Storage application. • Capable of maintaining storage temperatures between 0°C to 5°C.

-

-

-

... More
2. Refrigeration Equipment • Hermetic/ semi-hermetic compressors with energy-efficient operation. • Air-cooled condenser units with adequate heat rejection capacity. • Thermostatic Expansion Valves (TXV) for precise refrigerant flow control. • Evaporators with high-efficiency finned coils and low noise operation. • Refrigeration system designed for uniform temperature distribution. • Capacity 7.5 KW x 4 nos.

-

-

-

... More
3. Refrigerant & Piping • Refrigerant: R-404A or equivalent eco-friendly refrigerant. • High-quality copper piping with proper insulation (minimum 19mm thick closed-cell insulation). • Leak-proof brazed joints with pressure testing up to 450 psi.

-

-

-

... More
4. Controls & Automation • Digital temperature controllers with remote monitoring capability. • PLC-based system for automatic defrost cycles and load optimization. • Safety controls including high/low-pressure switches and emergency cut-offs. • Data logging features for monitoring temperature variations.

-

-

-

... More
D. ELECTRICAL SYSTEM

-

-

-

... More
1. Lighting & Power Supply • LED lighting fixtures (IP65 rated) for high energy efficiency. • Three-phase electrical supply with stabilizers. • Emergency backup lighting and exit signage.

-

-

-

... More
2. Earthing & Safety • Earthing system as per IS 3043:2018 with copper grounding electrodes. • Surge protection system for electrical safety. • ELCB and MCB protection for all electrical panels.

-

-

-

... More
3. Fire Protection • Fire extinguisher points as per NFPA standards.

-

-

-

... More
3. MATERIAL SPECIFICATIONS

-

-

-

... More
• Concrete: M20 for footings, M25 for flooring, with admixtures for strength enhancement. • Reinforcement Steel: Fe 500 grade TMT bars for superior strength. • Roof & Wall Panels: 100 mm thick PUF insulated sandwich panels, weatherproof and fire-rated. • Structural Steel: Hot-rolled IS-compliant steel sections with corrosion-resistant treatment. • Floor Insulation: 100 mm XPS for energy efficiency. • Doors: Air-tight insulated cold storage doors with stainless steel hardware. • Sealants: High-performance polyurethane or silicone-based sealants.

-

-

-

... More
4. QUALITY CONTROL & INSPECTION

-

-

-

... More
• Material testing reports to be submitted before installation. • On-site inspections at critical construction stages. • Compliance with IS and international standards to be strictly followed.

-

-

-

... More
5. COMPLETION & HANDOVER

-

-

-

... More
• Final site cleanup, removal of debris, and waste disposal. • Performance testing of insulation and airtightness. • Handover with as-built drawings, compliance certificates, and warranty documents.

-

-

-

... More
Note:-The rates quoted are inclusive of all carriages of materials (Mechanical/Manual) from source to site work and all extra charges including dewatering if any during the execution of work till complete in all respects.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.