Sher E Kashmir University Of Agricultural Sciences And Technology Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Sher E Kashmir University Of Agricultural Sciences And Technology - SKUAST Tender
Civil And Construction
Building Construction
Eprocure
Opening Date20 Nov 2023
Closing Date20 Nov 2023
Tender Amount₹ 4,68,000
Costs
EMD
₹ 9,360Document Cost
₹ 400Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_SKUST_236836_1Bid Award Id
ViewTender No
E-NIT-66 of 2023-24Tender Authority
Sher E Kashmir University Of Agricultural Sciences And Technology ViewPurchaser Address
-Website
http://http://www.skuastkashmir.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Upgradation of ground floor of Admin Block at Main Campus Shalimar, SKUAST-Kashmir (CAPEX)
BOQ Items
... More
Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position Budloo wood:
0.35
14178
40509.4
... More
Providing and Fixing of imported wall paneling( HDF Laminated) :
509.9
81584
160
... More
Providing and fixing 12mm Ply board with necessary nails etc. complete
47.38
37904
800
... More
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc complete.
91.35
1324
14.5
... More
Providing and applying white cement based putty of specified thickness, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. 2 mm thick
91.35
16538
181.05
... More
Finishing walls with textured exterior paint of required shade on New work (two or more coats applied @ 3.28 liter/10sqm) over and including base coat of exterior primer applied @ 2.20kg/10sqm
91.35
24522
268.45
... More
Providing and fixing of ornamental wooden door with ornamental panels of first class kail wood including fixing of hinges of approved brand and of required type as approved by engineer Incharge:
3.25
16250
5000
... More
Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete. : (200 x 10 mm)
4
1200
300.05
... More
Providing and fixing bright finished brass door latch with necessary screws etc. complete. :250x16x5 mm
1
285
285.9
... More
Providing and fixing bright finished antique brass handles with screws etc. complete (200mm)
4
2200
550
... More
Providing and fixing of glass panes, with wooden beading thickness 5.0 mm (weight not less than 12.5 kg/sqm)
4.69
5628
1200
... More
French spirit polishing, Two or more coats on new works including a coat of wood filler and preparing the surface of wood with sanding etc complete:
18.93
7209
380.85
... More
Providing and fixing of Toughened Glass, with wooden beading:
60
90000
1500
... More
Note:-The rates quoted are inclusive of all carriages of materials (Mechanical/Manual) from source to site work and all extra charges including dewatering if any during the execution of work complete in all respects.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements