Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Sher E Kashmir University Of Agricultural Sciences And Technology - SKUAST Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date13 Aug 2024
Closing Date22 Aug 2024
Tender Amount₹ 6,33,000
Costs
EMD
₹ 12,660Document Cost
₹ 300Tender Fee
Refer Documents
Summary
Providing/fixing Of Chain-link Fencing-i For A Length Of 135 Rft (capex) At Harrs, Larnoo, Skuast-kashmir.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_SKUST_256870_1Bid Award Id
ViewTender No
E-NIT-39 of 2024-25Tender Authority
Sher E Kashmir University Of Agricultural Sciences And Technology ViewPurchaser Address
-Website
http://http://www.skuastkashmir.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Providing/Fixing of Chain-Link fencing-I for a length of 135 Rft (CAPEX) at HARRS, Larnoo, SKUAST-Kashmir.
BOQ Items
... More
Providing and laying stone soling tightly hand packed under foundations, footings ,floors etc. including carriages of materials from source to site of work complete in all respects.
7.14
7140
1000
... More
CONCRETE WORK ITEMS: Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with
-
-
-
... More
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
4.3
22372
5202.9
... More
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
38.51
220800
5733.6
... More
1:2:4 (1 cement :2 coarse sand :4graded stone aggregate 20 mm nominal size)
8.6
56684
6591.25
... More
FORM WORK:- Providing Centring & shuttering including strutting, propping etc. and removal of form work using 12mm thick ply board (for mass concreting.) for foundation etc.
176.77
50618
286.35
... More
STEEL WORK
-
-
-
... More
Supplying & fixing at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
50x50x6mm
1039.95
132385
127.3
... More
Flats 40X5mm
219.5
27942
127.3
... More
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge.
Made of G.I. wire of dia 4mm
100.37
81289
809.9
... More
BARBED WIRE: Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per meter cost of total length of With G.I. barbed wire used.
123.48
2451
19.85
... More
Painting: Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture. (asian, Nerloac, Berger or equivalent) all complete
100.37
14257
142.05
... More
Note:-The rates quoted are inclusive of all carriages of materials (Mechanical/Manual) from source to site of work and all extra charges including dewatering if any during the execution of work complete in all respects.
-
-
-