Rural Development And Panchayati Raj Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Rural Development And Panchayati Raj Department - RDPR Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date11 Feb 2025
Closing Date17 Feb 2025
Tender Amount₹ 12,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

24.7

5584

137930.98

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement.in walls with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) in walls

35.2

6280

221064.8

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

26

5504

143109.2

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level

4000

71

284000

... More
Dumping stone including cost of stones.

1.35

327

441.52

... More
Centering and shuttering incl. Propping and removal of same in Foundations, footings, bases of columns etc. for mass concrete.

425

179

76181.25

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms.

71.6

372

26663.84

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls above 20 cm wide

26

799

20783.1

... More
P/L in position 1:2:4 of RCC excluding the cost of ecentering shuttering finishing and reinforcement -all work upto PL

22

4540

99891

... More
Filling availableexcavated earth in trenches , plinth, sides of foundation etc. layers not exceeding 20cm in depth , consolidation each deposited layer by ramming & watering including all leads etc..

115

102

11753

... More
Carriage of material by means of M.T

-

-

-

... More
Cement avg lead 15km

49.25

144

7139.28

... More
Sand and aggregate with avg lead of 15km

177.2

279

49445.89

... More
Add cost of door (steel)

5

5000

25000

... More
Add cost of gunny bags

60

65

3900

... More
Add cost of electrification

5

1200

6000

... More
Add cost of wire guage ventilator with wooden frame

5

1200

6000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.