Rural Development And Panchayati Raj Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Rural Development And Panchayati Raj Department - RDPR Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date2 Dec 2024
Closing Date7 Dec 2024
Tender Amount₹ 2,94,000
Costs
EMD
₹ 5,880Document Cost
₹ 200Tender Fee
Refer Documents
Summary
Const Of Boundary Wall At Bhim Devta Dharmatha Ward No 3 In Pyt.kanthan A Block Arnas
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDPR_266495_5Bid Award Id
ViewTender No
e-NIT No. 87 of REW REASI of 2024-25Tender Authority
Rural Development And Panchayati Raj Department ViewPurchaser Address
-Website
http://http://drdj.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Dupming of Stone including the cost of stones,
4
937
3749.6
... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
0.53
7788
4127.85
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
55
123
6776
... More
Centering and shuttering including strutting, propping etc. and removal of form work for: foundations, footings, bases for columns
59
286
16894.65
... More
Centering and shuttering including strutting, propping etc. and removal of form work for; Columns, pillars, piers, abutments, posts and struts.
6.6
742
4900.83
... More
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand)
9.8
7571
74201.19
... More
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level
9.8
1455
14265.37
... More
12mm Cement plaster of mix 1 : 6 ( 1 cement : 6 fine sand)
80
266
21296
... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including all leads, lift and carriage complete
200
133
26660
... More
Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work, over and including water thinnable priming coat to give an even shade
80
127
10199.2
... More
Applying priming coat With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works
11
53
589.6
... More
construction of CIB (includes concrete pedestal/brick size 3'x2' plastering, painting all complete job as per direction of engineer in charge
1
3000
3000
... More
Carriage of material from source to site of work by MT including loading, unloading and stacking complete.
-
-
-
... More
Cement 40 KM by M.T and 400 metres by A.T/H.L
3.48
857
2984.24
... More
Steel 40 KM by M.T and 400 metres by A.T/H.L
0.06
1047
62.86
... More
Sand 30 KM by M.T and 400 metres by A.T/H.L
9.59
739
7091.23
... More
Agg 30 KM by M.T and 400 metres by A.T/H.L
9.58
739
7083.84
... More
Bricks 80 KM by M.T and 400 metres by A.T/H.L
4531
3120
14140.66
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements