Revenue And Forest Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Revenue And Forest Department Tender

Works
Civil And Construction
Civil Works Others
Agriculture or Forestry Works
Eprocure
Opening Date9 Nov 2024
Closing Date2 Dec 2024
Tender Amount₹ 2,50,000 
Notes
Download

Costs

Summary

Upgradation And Renovation Of Dhargloon Nursery/ Fencing Of Nursery In Co.147/ M, Dargloon, Poonch (agrostotogy Range Poonch), Agrostology Wing, Jammu.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shattering-All work upto plinth level.1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size)

1.01

6591

6676.28

... More
Providing and laying damp-proof Course 50mm thick with cement concrete1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size) and curing complete.

60.97

416

25392.55

... More
Centering and shattering including strutting, propping etc.and removal of form for: foundations,footings, bases of columns, etc.for mass concrete.

31.41

286

8995

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors,roofs, landings, balconies and access platforms.

0.47

718

337.91

... More
Half brick masonry with common burnt clay (now-modular) bricks of class designation 7.5 in foundations and plinth inclnding curing in: Cement mortar1:4 (1 cement:4 coarse sand )

1.12

947

1056.41

... More
12 mm Cement plaster of mix:-1:4 (1 cement: 4 line sand )

1.12

283

316.51

... More
Supplying at site Angle iron posts & struts of required size including bottom to be split and bent at right angle in opposite direction for 10cm length and drilling holes upto10 mm dia etc.complete.

163.92

127

20866.72

... More
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with 5 orizontal lines and 2 diagonals of G.I barbed wire weighing 9.3.8 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I.staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts,struts,earth work and concrete to be paid for separately) :- Payment to be made per meter cost ot total length of barbed wire used with G.1.barbed wire.To be paid as per actual.

5052.13

12

62899.07

... More
Providing and fixing of Binding Wire

5

80

400

... More
.Applying priming coat with ready mixed red oxide Zinc Cliromate primer of approved brand and manufacture on steel galvanized iron/steel works

138.78

53

7438.4

... More
Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade on new steel works.

138.78

131

18297.62

... More
Removal of old damaged barbed wire fencing and disposal of the same to required site with all lifts and carriages complete job.

2280

5

11400

... More
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end):20 mm nominal bore.

15

513

7701

... More
Providing and fixing of water motor of I.5 HP with all fittings/accessories complete job.

1

15000

15000

... More
Providing, laying and fixing electric service line to Aluminium 2 core10 mm insulated service line

130

60

7800

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc.as required. In gratings, frames,guard bar, ladder, railings, brackets, gates and similar works.

10.88

181

1975.63

... More
Providing and fixing of ceiling fan (Khaitan, Bajaj,Havels make) with all electrical fittings/accessories complete job.

1

2500

2500

... More
Providing and fixing, wiring for light points with modular switch,modular plate suitable Plastic box with batten fitting as required. Make:- Anchor Havells or equvalent Power point with all electrical fittings/accessories and modular switch board and switches wiriiag, holders, pipe or batten fittings complete job.

5

1000

5000

... More
Profiding and fixing of Led Bulb of ISI make like crompton,havels,philips with holders (10/18 watt) complete job.

2

200

400

... More
(a) Carriage of av 15 km sand from source to site of work by M.T.

3.53

566

2001.11

... More
(b) Carriage of av 15 km Stone agg. below 40 mm from source to site of work by M.T.

0.93

566

528.31

... More
© Carriage of av 15 km Stone agg. 40mm from source to site of work by M.T.

5.98

735

4395.52

... More
(d) Carriage of av 10 km cement from source to site of work by M.T.

1.17

538

629.38

... More
(e) Carriage of av 250 km steel av from source to site of work by M.T.

0.47

2620

1241.89



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.