Public Works Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date30 Oct 2023
Closing Date10 Nov 2023
Tender Amount₹ 1,55,96,700 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in charge All works above plinth level upto floor V level including all carriages complete.

93.06

884070

9500

... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more including all carriages complete

9305.63

930563

100

... More
Centering and shuttering including strutting, propping, etc. including removal of form work for suspended floors, wheel guards etc including scaffolding complete

367.4

263793

718

... More
Approach Walls

-

-

-

... More
Earth work in excavation all kinds of soil by mechinical means in trenches for foundations, etc. including dressing of sides and ramming of bottoms, all leads, lift including getting out excavated earth and disposal of surplus excavated earth as per the directions of Engineer In-Charge

175.5

44928

256

... More
Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete

14.85

12622

850

... More
Providing and laying in position of reinforced cement concrete 1:2:4 (1 Cement, 2 Corase sand: 4 grade stone aggregate 20mm nominal size crushed including curing but excluding the cost of cantering, shuttering, finishing and reinforcement all work upto plinth level including all carriages involved complete

14.85

110632

7450

... More
Providing and laying in position of reinforced cement concrete 1:1.5:3 (1 Cement, 1.5 Corase sand: 3 grade stone aggregate 20mm nominal size crushed including curing but excluding the cost of cantering, shuttering, finishing and reinforcement upto plinth level and above plinth level upto Floor-V level including all carriages involved complete

114.73

1021097

8900

... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more including all carriages complete

11472.8

1147280

100

... More
Centering and shuttering including strutting, propping, etc. including and removal of form work for foundations, walls (any thickness) etc

245.6

122800

500

... More
Supply and filling selected boulders / Granular material behind abutments, approaches to the level of approach slabs including spreading, watering, compacting with all carriages , leads and lifts as per the directions of Engineer InCharge complete.

143.21

114568

800

... More
Providing and fixing PVC pipes as weep holes in abutment walls 100 mm dia cut to required length and profile and installed in concrete including all carriages complete.

47

9400

200



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.