Public Works Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date25 Nov 2023
Closing Date13 Dec 2023
Tender Amount₹ 6,25,29,000
Costs
EMD
₹ 12,51,000Document Cost
₹ 8,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PWDJK_238242_1Bid Award Id
ViewTender No
e-NIT No.94 of 2023-24 Dated.25-11-2023Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://jkpwdrb.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing / Laying of 50mm thick premix Bituminous Macadam base course with stone aggregate of quality size & grading as specified in CPWD specifications & straight run bitumen of grade VG-10 @ 3.3% by weight of total mix @ 66Kgs/cum including hot mixing of stone aggregate and bitumen in hot mix plant, transporting and laying mixed material with paver finisher to the required level and grade, rolling with road roller of 08 to 10 tonne capacity to achieve the required compaction and density (50mm compacted thickness complete) inluding cost & carriage of all materials involved from source upto site of work complete.
2190
18814180
8590.95
... More
P/L of 25 mm thick compacted semidense bitumenious surface using crushed aggregate satisfying the gradation set out in MOST specifications with 5% binder content (by weight of total mix) bitumen of VG-10 grade @ 2.88 kgs/sqm with the aid of hot mix plant and paver finisher including rolling with 8 to 10 tonnee capacity road roller to achieve the required compaction and density [with bitumen VG-10 grade(quarry)] incl. rolling and finishing complete and incl. cost and carriage of all materials involved from source upto site of work complete.
43800
12837780
293.1
... More
Providing and laying 6 mm thick compacted seal coat of premixed fine aggregate(passing 2.36 mm and retained on 180 micron sieve) with bitumen 128 kg of bitumen of VG-10 grade per cubic meter of fine aggregate(0.768 kg of bitumen per square metre) and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing complete as per MOST specifications incl.cost and carriage of all materials involved from source upto site of work complete.
43800
4441320
101.4
... More
Supply and filling of Khakh Bajri incl watering and consolidation with PRR 8-10 tonne capacity incl.all cost and carriage of materials involved.
4320
3672000
850
... More
CONSTRUCTION OF RETAINING WALL
-
-
-
... More
Earthwork in excavation by mechanical means (hydraullic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 m & lift upto 1.5m as directed by engineer in charge All Kinds of soil
149.27
38340
256.85
... More
P/L dry stone soling hand packed tightly including all carriage and costs of materials involved complete.
22.96
21812
950
... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
17.22
89593
5202.9
... More
Random Rubble masonry with hard stone from Querry in R/Walls including levelling up with Cement Concrete 1:6:12 mix (1 Cement,6 Coarse Sand,12 Graded stone Aggregate 20 mm nominal size) upto Plinth level with Cement Mortar 1:6 mix (1 cement 6 coarse sand)
197.69
1284985
6500
... More
R.R Stone Masonry laid dry with hard Querry stones in foundation and plinth
131.8
461300
3500
... More
Backfilling behind R Wall with 2nd class stones/stone boulders including all cost and carriage of materials involved complete.
215.67
215670
1000
... More
Backfilling behind R Wall with Khak Bhajri filling including all cost and carriage of materials involved complete.
269.58
202185
750
... More
Providing & laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone agg 12.5 mm nominal size) and curing complete
119.81
49900
416.5
... More
Carriage of materials by mechanical means transport from source to site of work incl loading & unloading complete job. A) Stone agg. Upto 40 mm for an average lead of 20 Kms
20.77
8514
409.94
... More
B) Sand from hajin for an average lead of 15 Kms
49.92
17196
344.49
... More
C) stones for an average lead of 20 kms
263.59
127132
482.31
... More
RCC PIPES
-
-
-
... More
P/L of RCC Spun pipes incl. Excavating trenches of required width and depth, providing of required cushioning b.w.o nallah muck filling, laying of pipes to proper/required gradient , refilling of trenches, levelling, ramming,dressing,watering incl. loading , unloading , cost & carriage of pipes all Complete. A) 12'' dia ( S&S type)
24.39
85194
3493
... More
B) 18'' dia ( S&S type)
24.39
129151
5295.26
... More
Maintenance Cost for 5 Years
-
-
-
... More
1st Year
1
568449
568449.72
... More
2nd Year
1
852674
852674.58
... More
3rd Year
1
1136899
1136899.44
... More
4th Year
1
1421124
1421124.31
... More
5th Year
1
1705349
1705349.17
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements