Public Works Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Public Works Department - PWD Tender
Eprocure
Opening Date20 Jun 2019
Closing Date27 Jun 2019
Tender Amount₹ 29,85,000
Costs
EMD
₹ 59,700Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_PWDJK_77087_1Bid Award Id
ViewTender No
31 /2019-20/RnB/Kul/1978-98 Dated 17-06-2019Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://jkpwdrb.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
P/L of 25mm thick Semidence asphaltic base course using mineral aggregate satisfying the gradation set out in specifications, with 5 percent binding content (by weight of total mix) bitumen of grade 80/100 @ 2.88 Kg/Sqm with the aid of hot mix plant and paver finisher including rolling with 8 to 10 tonne capacity to achieve the required compaction and density confirming to MOST specifications (with bitumen 80/100 (quarry)including cost and carriage of all materials.
3500
-
-
... More
Providing and laying seal coat of premixed fine agg. (Passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 Kgs, of bitumen of grade 80/100 bitumen per Cum of fine agg. and 0.60 Cum of fine agg. Per 100 Sqm of road surface to achieve the desired compaction as per MOST spacifications including rolling and finishing with road all complete
3500
-
-
... More
R/Wall & P/L of RCC Pipes
-
-
-
... More
Earth work in excavation by mechanical means in foundation trenches, drains pipes and cables etc (not exceeding 1.5 Mtr, in width or 10 Sqm on plan) incld. dressing of sides and ramming of bottoms, lift, upto 1.5 Mtr. Incld. Getting out excavated soil and disposal of surplus soil as directed within a lead of 50 Mtr. All kinds of soil
30
-
-
... More
Providing/Laying stone soling Nallah hand packed on level in foundation trenches . Incld: all carriages complete
5.73
-
-
... More
P/L in position cement conc: of specified grade excld: the cost of Centering and shuttering. All work upto plinth level. 1:4:8 (1 Cement: 4 coarse sand: 8 graded stone aggregate 40 mm nom: size (crushed). . Incld: all carriages complete
6.75
-
-
... More
P/L in position cement conc: of specified grade excld: the cost of Centering and shuttering. All work upto plinth level.1:3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nom: size )crushed).. Incld: all carriages complete
23.62
-
-
... More
Centering and shuttering incld: strutting , Propping etc and removal of form work Foundations, footings bases of columns,
45
-
-
... More
Supplying/filing of RBM behind R/wall incld: Spreading, leveling incld: cost and carriages of all materials complete.
17.21
-
-
... More
Providing / laying of RCC pipes (different Dia's) in proper position/ grade incld: earth work cutting and providing required quantity of RBM over pipes as cushion incld: cost and carraige of RBM and Pipes
-
-
-
... More
12" Dia
34.16
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements