Public Works Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date17 Jun 2024
Closing Date1 Jul 2024
Tender Amount₹ 15,00,000
Costs
EMD
₹ 30,000Document Cost
₹ 600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDJK_250542_5Bid Award Id
ViewTender No
07 of 2024-25 Dated 15.06.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://jktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), with all leads and lifts carriage complete.
7.56
43346
5733.6
... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level, 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) with all leads and lifts carriage complete.
2.7
21028
7788.4
... More
Centering and shuttering including strutting, propping etc. and removal of form work for :-
-
-
-
... More
Foundations, footings, bases for columns
15.6
4467
286.35
... More
Suspended floors, roofs, landings, balconies and access platforms.
3.6
2585
718.2
... More
Edges of slabs and breaks in floors and walls Above 20 cm wide
3.9
4465
1145.1
... More
Providing / laying water bound macadam with specified stone aggregate stone screening and binding material including screening, sorting, spreading to template and consolidation with power road roller 8 to 10 tonne capacity etc. complete. Base course with 63mm to 45mm size including stone screenings 13.2mm size ( 150mm thick ) with all leads and lift carriage complete.
190.75
424228
2224
... More
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base I base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in Charge ( with all leads and lifts carriage complete )
143.06
269804
1885.95
... More
Providing and laying Semi-Dense Bituminous Concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.25 mm compacted thickness with bitumen of grade VG- 30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity Including Tack Coat @ 0.75 Kg / Sqm. ( Complete Job )
1907.5
713881
374.25
... More
Engaging Excavator cum loader for malba removal and its disposal including all leads and lifts carriage complete
5
5000
1000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements