Public Works Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date3 Dec 2024
Closing Date30 Dec 2024
Tender AmountRefer Documents
Costs
EMD
₹ 20,000Document Cost
₹ 600Tender Fee
Refer Documents
Summary
Restoration / Maintenance Of Roads On Emergent Basis Likely To Be Damaged During The Financial Year 2024-25 On Malnai To Chakrabati L 10.00 Kms
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDJK_266817_1Tender No
STAGE e-NIT No. 39 of 2024-25 Dt. 03-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://jktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
1
218
218.4
... More
Dry random rubble masonry with hard stone in foundation and plinth Without bond stone Nallah
1
2793
2793.8
... More
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres
-
-
-
... More
All kinds of soil
1
256
256.85
... More
Ordinary Rock
1
493
493.5
... More
Hard Rock (Requiring Blasting )
1
810
810.85
... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge All kinds of soil
1
479
479.3
... More
Slip Clearance
-
-
-
... More
In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.
1
154
154.15
... More
In soils; mixed with moorum / Kankar / shingle / boulders; disposal lead upto 50 m and lift upto 1.5 m.
1
331
331.15
... More
In soils; mixed with Decomposed Rocks; by blasting or any other means
1
411
411.4
... More
In medium hard rocks ; by blasting
1
492
492.7
... More
In hard rocks; by blasting
1
686
686.3
... More
Snow Clearance by Mechanical Means using Machines as specified or equivalent
-
-
-
... More
Dozer BD 80
1
25
25.18
... More
Snow Plough 180 HP (Ashoka Leyland Stallion- 2009)
1
1
1.32
... More
Snow Plough 4WD 170-180 BHP (Unimog)
1
6
6.48
... More
Snow Plough 4WD 90 BHP (Trucks)
1
5
5.63
... More
Snow Plough 4WD 60 BHP (Trucks)
1
4
4.71
... More
Snow Plough 4WD 160 BHP (Trucks)
1
5
5.68
... More
Snow cutter Rolba 1500
1
1
1.63
... More
Snow cutter Rolba 3000
1
1
1.36
... More
Snow Cat
1
3
3.62
... More
Snow Blower 4WD 690 BHP 8500T/hr (Fresia Spa)
1
4
4.44
... More
Snow Blower 4WD 420-430 BHP 3500T/hr (Supra 4001)
1
5
5.24
... More
Snow Blower 4WD 570 BHP 5300T/hr (Supra 3000)
1
5
5.23
... More
Snow Blower 4WD 420 BHP 3500T/hr (Rolba 1500)
1
6
6.53
... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) wet
1
184
184.95
... More
Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. Nallah stone
1
335
335.6
... More
Hand-packing stones in wire-crates; including cost of stones but excluding cost of crates
1
1071
1071.15
... More
Supply of wire Crate at site of Mesh Size 50 mm x 50 mm and dia of wire mesh 4mm
1
6000
6000
... More
Carriage of Materials
-
-
-
... More
Excanated Mulba for an Avg. distance of 1 Kms by MT
1
160
160.93
... More
Sand / Bajree for an Avg. distance of 14 Kms by MT
1
331
331.4
... More
Stone for an Avg. distance of 5 Kms by MT
1
236
236.16
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements