Public Works Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Works Department - PWD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date25 Mar 2025
Closing Soon3 Apr 2025
Tender Amount₹ 33,38,000 
Notes
Download

Costs

Summary

Fencing Of Land Of Arto Ganderbal At Saloora Ganderbal-balance Work.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Finishing wall with premium acrylic smooth exterior paint with silicone additives of required shade on New work (two or more coats applied @ 1.43 liter/10sqm over and including priming coat of water exterior paint applied @2.20kg/10sqm) all complete.

1712.83

151

259031.28

... More
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.

5952

102

609306.24

... More
Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture all complete.

386.62

120

46541.32

... More
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.

5486.99

20

112154.08

... More
Supply and filling of good earth from approved source upto site of work ramming dressing and watering in 15/22cm layers including spreading levelling and consolidation with power road roller of 8 to 10 tone capacity (to required gradient and camber with all leads and lifts carriages T&P establishment charges etc complete.as per the directions of Incharge Engineer.

743.42

550

409512.91

... More
Supply, stacking and laying of GSB Naturally occurring gravel close graded maximum aggregate size range 75mm granular sub base course nallah including sorting, spreading to template, watering and consolidation to required gradient and camber with 80-100KN road roller all inclusive leads, lifts, loading, unloading carriage of materials from approved source to site of work complete. Finished work to be measured.

297.37

1016

302410.42

... More
Supply, stacking and laying of WBM grade 2nd with specified graded stone aggregate 63mm - 45mm size broken quarry stone @0.92cum/10 sqm and using of screening 11.20mm size @ 0.135cum/10sqm and binding material @0.06cum/10sqm of road surface including sorting, spreading to template, watering and consolidation to required gradient and camber with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from approved source to site of work complete (To be laid as per guide line of MOST specification). Finished work to be measured and paid.

33.45

1906

63781.79

... More
Carriage of Material:- Sand/Stone agg. For an avg. lead of 10 Kms

42

200

8416.8

... More
Bricks For an avg. lead of 60 Kms

31801

1

51835.63



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.