Public Works Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date9 Jun 2022
Closing Date22 Jun 2022
Tender Amount₹ 3,53,24,000
Costs
EMD
₹ 7,06,500Document Cost
₹ 5,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_PWDJK_173242_1Bid Award Id
ViewTender No
55/2579-88/RnB/SPN/e-tender of 09-6-022Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://jkpwdrb.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying River Bed Material ( RBM) with specifed size (75-90mm)including sorting , spreading in uniform layers on existing surface and consolidation each deposited layer with Vibrator Roller to the required gradient and camber with all carriages to site of work including loading and unloading complete
2400
-
850
... More
supplying and stacking at site, laying, spreading and compacting stone aggregate of 63-45mm size to WBM Specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller of 8-10 tonne capacity in stages to proper grade and camber applying and brooming 13.2 mm type A screening/ binding material to fill up interstices of coarse aggregate, watering and compacting to required density including all carriages of materials as involved complete (Finished work to be measured 75mm thick compacted thickness)
1495
-
1950
... More
P/L 75mm thick wet mix on prepared sub grade / sub base with crushed stone aggr. Of specified grading Clause 406 of IRC MORTHspecification. including mixing of crushed material with predeterminated quality of water. (Which should not vary from OMC determinate as per IS: 2720 PT VIII by more than aggregate limit in accordance with specification to form dense mass which is spread and rolled with vibratory roller 80-100 KN speed which should not exceed 5 Kms/ Hr each layer and rolling should continue till 98% is achieved to approved lines grades and cross sections. The mixing is to be prepared in wet mixing plant of suitable capacity including all leads lifts, carriages, tools, taxes, materials cost of emulsion) as per clause of 502 of MORTH specification complete
1916.3
-
2300
... More
Providing and applying tack coat using hot straight run bitumen of grade VG-10 including heating the bitumen with spraying the bitumen with mechenically operated spray unit fitted on bitumen boiler, prepareing and cleaning the existing road surface to remove all dirt, dust, mud, etc. finally brooming including cost and carrige of all materials involved complete (on WBM Suface @0.75kg/Sqm)
25550
-
55
... More
Providing and laying 50mm thick compacted premix bitumen macadam base course with stone aggregate of quality size and grading as per specified in CPWD specification and straight run of grade VG-10 @3.3% by weight of total mix including hot mixing of stone aggregate and bitumen in hot mix plant, transporting mixed material and laying with Paver finished to required level grade, rolling with road roller of 8 to 10 ton capacity to achieve the required compaction and density including cost andf carriage of all materials involved T & P and equipment all allied machinery labour, taxes, testing charges for maintaining quality control during and after the execution of work complete job
1277.5
-
7500
... More
Providing , laying of 25mm thick semidense bituminous concrete surfacing using aggregate satisfying the gradation set out in the specifications V.G-10 grade bitumen @ 2.88 Kg per Sqm with 5% binder content of road surface including hot mixing of aggregate and bitumen in Hot mix plant , transporting the mixed material from plant up to the site of work and laying the same with paver finisher to the required level and grade , rolling with road roller of 8 - 10 tonne capacity to achieve the required compaction and density including cost ,all taxes and carriage of all the materials involved complete.
25550
-
260
... More
Providing and laying 6mm thick seal coat of premixed fine aggregate (passing 2.36mm and retaining on 180 micron sieve) with bitumen using 128 Kg of Bitumen of grade VG-10 bitumen per cume of fine aggregate (0.768 kg of bitumen/ Sqm) and 0.60 cum of fine aggregate/ 100 sqm of road surface including rolling and finishing including all cost and carriage of materials involved
25550
-
60
... More
Development of Berms
-
-
-
... More
Providing and laying Khakbajri for development of Berms of specified size and grade including spreading, sorting, levelling, watering and consolidation by Power Road Roller (PRR) of 8- 10 tonne capacity including all carriages complete
480
-
850
... More
Kacha Drian
-
-
-
... More
Earth work in excavation all kinds of soil by mechinical means in trenches for foundations, etc. including dressing of sides and ramming of bottoms, all leads, lift including getting out excavated earth and disposal of surplus excavated earth as per the directions of Engineer In-Charge complete
1080
-
252
... More
Laying of RCC Pipes (X-Drainage)
-
-
-
... More
Providing and laying of 600mm dia RCC pipes in proper position/ grade including excavation of trenches, refilling of excavated material as cushion (got from excavation) inclding cost and carriage of pipes upto site of work complete.
15
-
4500
... More
Providing and laying of 450mm dia RCC pipes in proper position/ grade including excavation of trenches, refilling of excavated material as cushion (got from excavation) inclding cost and carriage of pipes upto site of work complete.
15
-
3500
... More
Protection work (R/B Walls)
-
-
-
... More
Earth work in excavation all kinds of soil by mechinical means in trenches for foundations, etc. including dressing of sides and ramming of bottoms, all leads, lift including getting out excavated earth and disposal of surplus excavated earth as per the directions of Engineer In-Charge complete
110.7
-
252
... More
Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete
33.21
-
800
... More
Providing and laying in position cement concrete 1:4:8 ((1 Cement:4 Corase sand: 8 grade stone aggregate 40 mm nominal size crushed including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete
18.45
-
4800
... More
Providing and laying in position cement concrete in 1:3:6 (1 Cement: 3 Corase sand: 6 grade stone aggr 20 mm nominal size crushed) including curing but excluding the cost of centring and shuttering all work upto plinth level and above plinth level upto required height including all carriages complete
265.68
-
5500
... More
Centering and shuttring including strutting, propping, etc. and removal of form work for concrete work
885.6
-
570
... More
Supply and filling of RBM (River bed material) as Back filling behind R-walls including dressing , leveling, compacting and loading , unloading including all carriages complete
88.56
-
775
... More
Providing and fixing 75mm dia PVC Pipe for weep holes including all carriages involved complete
98.4
-
300
... More
Constt. Of 01 Nos 2 mtr span box type culvert
-
-
-
... More
Earth work in excavation all kinds of soil by mechinical means in trenches for foundations, etc. including dressing of sides and ramming of bottoms, all leads, lift including getting out excavated earth and disposal of surplus excavated earth as per the directions of Engineer In-Charge including diverting of nallah and dewatering of foundation trenches during the execution of work complete
30
-
300
... More
Providing and laying stone soling dully hand packed in maintaning level and section including carriages of all materials complete
2.16
-
800
... More
Providing and laying in position cement concrete 1:4:8 ((1 Cement:4 Corase sand: 8 grade stone aggregate 40 mm nominal size crushed including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete
1.2
-
4800
... More
Reinforced cement concrete work in 1:1.5:3 (1 Cement, 1.5 Corase sand: 3 grade stone aggr 20mm nominal size crushed) for foundtions, suspended floors, walls, abutments, etc. upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement including all carriages involved complete
24.84
-
8800
... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. Inculding all carriages complete
2235
-
80
... More
Centering and shuttring including strutting, propping, etc. and removal of form work for Foundation,footings, walls, suspended floors, etc
74.07
-
550
... More
Supply and filling of RBM as Back as backfilling including dressing , leveling, ramming and loading , unloading including all carriages complete
20.62
-
600
... More
Maintenance Cost for 5 Years
-
-
-
... More
1st Year
1
-
321128
... More
2nd Year
1
-
481692
... More
3rd Year
1
-
642257
... More
4th Year
1
-
802821
... More
5th Year
1
-
963385
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements