Public Works Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Public Works Department - PWD Tender
Paints and Enamels
Eprocure
Opening Date31 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 9,14,000
Costs
EMD
₹ 18,280Document Cost
₹ 600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDJK_269298_2Tender No
e-NIT No.76/2024-25 dated 31-12-2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://jktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Barracading of the activety area by way of fixing G.I pipes in proper position (supplied from the PHE department) and fixing angle iron posts for supporting structure (supplied from Divisional store Poonch) duely tied with binding wire including cost of binding wire finely included dismantelling,dismembering the same and supplying the same in respective stores and all To an Fro carraiges complete job.
625
172
107812.5
... More
Construction of wooden stage of required height (materials got from Divisional store) including necessary nails and handing over the materials to store officer and incl.To and Fro carraige from site to store complete job.
232.25
810
188122.5
... More
Providing and fixing red colour passage carpet/mat on wooden floor (stage) including handing over the materials to Divisional store officer and all carraiges complete.
241.63
280
67656.4
... More
providing C.G.I sheets for laying over muddy portion of ground (C.G.I sheets got from Divisional store) including lifting back to Divisional store and incl.To and Fro carraige from site to store complete job.
600
20
12000
... More
Providing and fixing white cloth width 1m or above including ropes of good quality to fix with iron angle described by Engineer incharge complete job.
495
92
45540
... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.
65.93
189
12473.96
... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.Two or more coats on new work
549.72
131
72480.58
... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven storey height made with 40 mm dia M.S. tube
1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S.
staircase system in the scaffoldings for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc.wherever required for inspection of work at required locations with essential safety features for the workmen etc complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding.NOTE:- To be used for maintenance work judicially necessary deduction for scaffolding in the existing item to be done
368
265
97630.4
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements