Public Works Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Works Department - PWD Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date30 Apr 2024
Closing Date6 May 2024
Tender Amount₹ 6,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
b)Ordinary rock

1

392

392.8

... More
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil.

1

467

467.3

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

218

218.4

... More
Providing,laying of stone soling in horizontal all carriages complete job

1

1200

1200

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

1

5202

5202.9

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.6

... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate.

1

510

510.25

... More
CAST-IN-SITU: Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

7788

7788.4

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

7104

7104.35

... More
12mm Cement plaster of mix in 1 : 4 ( 1 cement : 4 fine sand)

1

283

283.8

... More
Hand-packing stones in wire-crates; excluding cost of crates and incl cost of stones

1

1071

1071.15

... More
Add cost of B.A.wire crates 4''×4'' mesh,16'×16' size

1

258

258

... More
Dumping stone including cost of stones. In Horizontal on level

1

937

937.9

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

628

628.95

... More
Slip clearance; In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.

1

331

331.15

... More
In ordinary soils disposal lead upto 50 m and lift upto 1.5 m

1

154

154.15

... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively): Dry

1

111

111

1

184

184.95

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)

1

1725

1725.2

... More
1:4:8 or leaner mix (i/c equivalent design mix)

1

1064

1064.55

... More
Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared

1

635

635

... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.

1

189

189.2

... More
P/L of EC bags filled with earth or sand with stiching,sewing all carriages comlete job

1

60

60

... More
P/L of polythene sheet lining incl all carriages complete job

1

80

80

... More
Dismantling/fitting/laying of Q.C.C pipe 300mm dia incl cost of clips,welding all carriages complete job.

1

170

170

... More
Laying / Fitting of Q.C.C pipe 300mm dia incl cost of clips,welding all carriages complete job

1

550

550

... More
Stabilization of weak jointsof 300mm Q.C.C pipe incl complete welding around(inner and outer) by cutting windows incl cost of electrodes, hire charges and portable gen set incl all sorts of carriges complete job

1

5000

5000

... More
P/F of nuts ,bolts,rubber insertions to 200mm MS pipe, all complete

1

600

600

... More
Welding to 200mm dia MS flanged pipes(at damaged spots) incl cost of electrodes,hire charges and portable gen set incl all sorts of carriage complete job

1

5000

5000

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.-Thermo-Mechanically Treated bars of grade Fe-500D or more.

1

123

123.2

... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 600mm

1

1751

1751.8

1

1148

1148.6

1

837

837.55

1

746

746.2

... More
Providing /Laying/Fitting of 300 mm dia MS pipe flanged of 6mm thickness including welding of flanges 12mm thick and 64mm flange width to pipes at ends including cost of nuts,bolts,washers and all sorts of carriages by Mech Transport and head load including hire charges of DG set,cost of electrodes from source upto site of work .All complete job

1

190

190

... More
Hire charges of taxi/cab including driver/fuel

1

5000

5000

... More
Providing refreshment during official Functions /official tours of VIP'S including packing at venue with following Menu : Water Bottle One litre.

1

20

20

... More
Butter Toastes each pair.

1

20

20

... More
Toastes without Butter each pair.

1

12

12

... More
Tea Sugar each Cup.

1

20

20

... More
Tea Namkeen each Cup.

1

21

21

... More
Normal Chicken Biryani one plate for person.

1

180

180

... More
Rice Plate with Dal , vegetables & curd .

1

140

140

... More
Rice Plate with vegetables, mutton & curd .

1

200

200

... More
Engagement of Labour

1

550

550

... More
Hire charges of J.C.B including fuel, driver and Crawling charges etc complete job Runningcharges

1

2000

2000

... More
Hire charges of Chain Mounted Earth moving equipment LNT etc including fuel ,driver and Crawling charges etc complete job

1

2500

2500

... More
Hire charges of Tippers including fuel, driver etc Running Charges

1

3000

3000

... More
Hire charges of Tractors including fuel, driver etc complete job Running Charges

1

1500

1500

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30cm girth upto and including 60cm girth.

1

379

379.05

... More
Beyond 60cm girth upto and including 120cm girth

1

1683

1683

... More
Carriage of material by Mechnical Means including loading, unloading, stacking etc Crates upto 1 km

1

343

343.32

1

393

393.17

1

442

442.23

1

489

489.56

1

535

535.3

... More
Beyond 5 Km upto 10 km /km

1

41

41.77

... More
Beyond 10 Km upto 20 km /km

1

34

34.9

... More
Beyond 20 km /every additional Km

1

29

29.43

... More
Cement upto 1 km

1

114

114.44

1

131

131.06

1

147

147.41

1

163

163.19

1

178

178.43

... More
Beyond 5 Km upto 10 km /km

1

13

13.92

... More
Beyond 10 Km upto 20 km /km

1

11

11.63

... More
Beyond 20 km /every additional Km

1

9

9.81

... More
40 mm Agregrate 1Km

1

139

139.94

1

160

160.24

1

180

180.26

1

199

199.55

1

218

218.19

... More
Beyond 5 Km upto 10 km /km

1

17

17.03

... More
Beyond 10 Km upto 20 km /km

1

14

14.23

... More
Beyond 20 km /every additional Km

1

12

12

... More
20 mm Agregrate 1 Km

1

128

128.75

1

147

147.44

1

165

165.84

1

183

183.58

1

200

200.74

... More
Beyond 5 Km upto 10 km /km

1

15

15.66

... More
Beyond 10 Km upto 20 km /km

1

13

13.09

... More
Beyond 20 km /every additional Km

1

11

11.04

... More
Sand 1 km

1

128

128.75

1

147

147.44

1

165

165.84

1

183

183.58

1

200

200.74

... More
Beyond 5 Km upto 10 km /km

1

15

15.66

... More
Beyond 10 Km upto 20 km /km

1

13

13.09

... More
Beyond 20 km /every additional Km

1

11

11.04

... More
R.C.C spun pipes 600 mm 1 km

1

4690

4690.2

1

5371

5371.19

1

6041

6041.39

1

6687

6687.97

1

7312

7312.86

... More
Beyond 5 km upto10 km per km

1

570

570.65

... More
Beyond 10km upto 20 km per km

1

476

476.77

... More
Beyond 20 km /every additional Km

1

402

402.07

... More
450 mm 1 km

1

3126

3126.8

1

3580

3580.79

1

4027

4027.59

1

4458

4458.65

1

4875

4875.24

... More
Beyond 5 km upto10 km per km

1

380

380.43

... More
Beyond 10km upto20 km per km

1

317

317.85

... More
Beyond 20 km /every additional Km

1

268

268.05

... More
300 mm 1 km

1

1340

1340.06

1

1534

1534.63

1

1726

1726.11

1

1910

1910.85

1

2089

2089.39

... More
Beyond 5 km upto10 km per km

1

163

163.04

... More
Beyond 10km upto20 km per km

1

136

136.22

... More
Beyond 20 km /every additional Km

1

114

114.88

... More
250 mm 1 km

1

1084

1084.18

1

1241

1241.59

1

1396

1396.51

1

1545

1545.98

1

1690

1690.43

... More
Beyond 5 km upto10 km per km

1

131

131.91

... More
Beyond 10km upto20 km per km

1

110

110.21

... More
Beyond 20 km /every additional Km

1

92

92.94

... More
Stones upto 1 km

1

151

151.47

1

173

173.46

1

195

195.1

1

215

215.98

1

236

236.16

... More
Beyond 5 Km upto 10 km /km

1

18

18.43

... More
Beyond 10 Km upto 20 km /km

1

15

15.4

... More
Beyond 20 km /every additional Km

1

12

12.89

... More
Carriage of material by Manual Means from road site to actual site of work including loading, unloading, stacking etc RCC spun pipes First 50 metres 600mm

1

4493

4493

1

4084

4084.54

1

1841

1841.39

1

1471

1471.51

... More
for every additional (50 metres) 600mm

1

659

659.3

1

599

599.36

1

270

270.2

1

215

215.93

... More
Stone For First 50 Mtrs

1

236

236.08

... More
for every additional 50 mtrs

1

51

51.4

... More
40 mm For First 50 Mtrs

1

216

216.94

... More
for every additional 50 mtrs

1

47

47.23

... More
20 mm For First 50 Mtrs

1

200

200.67

... More
for every additional 50 mtrs

1

43

43.69

... More
Sand For First 50 Mtrs

1

200

200.67

... More
for every additional 50 mtrs

1

43

43.69

... More
Cement For First 50 Mtrs

1

146

146.51

... More
for every additional 50 mtrs

1

21

21.5

... More
Crates For First 50 Mtrs

1

146

146.51

... More
for every additional 50 mtrs

1

21

21.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.