Public Works Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date20 Feb 2024
Closing Date11 Mar 2024
Tender Amount₹ 6,44,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:4:8 (1cement: 4fine sand: 8 graded stone aggregate 40mm nominal size). Under Footings) (crushed)

1.44

7492

5202.9

... More
Providing and laying in postion spacified grade of reinforced cement concrete excluding the cost of centering, shuttering,finishing and reinforcement All work upto plinth level 1:1.5:3 (1cement:1.5 coarse sand: 3 graded stone aggregate 20mm nominal size)(Crushed).complete.

4.32

33645

7788.4

... More
Providing and laying in position cement concrete of specified grade excl. the cost of centering and shutering. All work upto plinth level 1:2:4 (1cement: 2 fine sand: 4 graded stone aggregate 20mm nominal size)(Crushed).

18.24

120224

6591.25

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

10.08

99004

9821.85

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.

34.8

9964

286.35

... More
Centering and shuttering including strutting, propping etc. and removal of form for:Columns, pillars, piers, abutments, posts and struts.

19.2

14256

742.55

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms.

16

11491

718.2

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.

1870

230384

123.2

... More
Supply and filling of GSB of specified and required size as directed including dressing, ramming watering and compacting with power roller to required gradient and camber with carriage of all material involved loading, unloading and stacking complete.

37.5

35625

950

... More
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes

360.7

56611

156.95

... More
Carriage of different material from source to site of work Stone Agg to an average lead of 10 kms

1.28

388

303.34

... More
Carriage of different material from source to site of work Stone Agg to an average lead of 10 kms

29.05

8106

279.04

... More
Carriage of different material from source to site of work SAND to an average lead of 10 kms

15.33

4277

279.04



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.