Public Works Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date1 Nov 2024
Closing Date8 Nov 2024
Tender Amount₹ 58,69,584 
Notes
Download

Costs

Summary

Pmgsy Ramwari Road To Pathribal Road

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ordinary Rock

1235.52

392

-

... More
Hard Rock (Blasting Prohibited)

617.75

1128

-

... More
Filling available excavated earth (including rock) in trenches, plinth, sides of foundations etc. in layers, consolidating each deposited layer by ramming and watering, including all leads and lifts.

408

285

-

... More
Providing and Laying in Layers of not more than 200mm depth RBM/Nallah Muck/Tunnle muck Including sorting, spreading, watering and consolidation with PRR 8-10 tonne Including all Lifts and carriage complete (Max stone size not to exceed 150mm in any Direction) All Complete Job.

510

1000

-

... More
Supplying , stacking and Laying at site WBM GII stone aggregate of size 63 mm to 45 mm, Stone screening of size 13.2 mm nominal size (Type A) specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.

164.25

2200

-

... More
Providing & Laying RCC Pipes of diff dia's in proper position incl excavation of trenches, ramming of bottom,dressing of sides providing required cushion over the pipes incl loading, unloading & carriage upto site of work complete of

-

-

-

... More
36" dia

29.3

8500

-

... More
24" dia

9.75

5500

-

... More
18" dia

24.4

4000

-

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.

-

-

-

... More
Beyond 30 cm girth upto and including 60 cm girth.

3

379

-

... More
Beyond 60 cm girth upto and including 120 cm girth

7

1683

-

... More
Beyond 120 cm girth upto and including 240 cm girth.

2

7795

-

... More
Construction of R-wall, B-wall, TOE-wall in stone Masonry (Part-B)

-

-

-

... More
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :

92

256

-

... More
Providing and Laying dry stone soling dully hand packed incl.ramming etc with all cost and carriage of materials,complete including all carriages of material complete .

18.4

1000

-

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

18.4

5202

-

... More
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand)

189.29

5402

-

... More
Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. (Nallah)

41.07

3262

-

... More
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete

96

416

-

... More
Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) Flush/Ruled Pointing

181.44

297

-

... More
Supply & Stacking/ filling of Nallah mukh /Stones Behind R/Wall as Back Filling Including Raming & Carriage Complete

40

850

-

... More
Carriage of materials

-

-

-

... More
Stone Agg .20mm For an avg. lead of 10 Km

4.27

279

-

... More
Stone Agg . 40mm For an avg. lead of 10 Km

16.38

303

-

... More
Sand Agg. For an avg. lead of 15 Km

8.65

344

-

... More
Stone Masonry material Carriage 10 Km avg Lead

230.3

328

-

... More
Construction of Crate Wall (Part-C)

-

-

-

... More
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock

159.26

940

-

... More
Dry stone pitching, 225mm thick, including cost of stones and preparation of surface. Nallah stone

148.7

335

-

... More
Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost of stones but excluding cost of wire crates

269.61

2732

-

... More
Add cost of crate incl knitted wire crates, weaving binding complete.

1040.89

342

-

... More
Filling of Stone Boulders/nallah muck/khakh bajri behind crete works incl Carriage complete job.

52.04

900

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.