Public Works Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Works Department - PWD Tender

Civil And Construction
Road Construction
Eprocure
Opening Date17 Oct 2022
Closing Date11 Nov 2022
Tender Amount₹ 2,49,57,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
EarTh work in excavation by Mechanical means( Hydraulic excavatar ) in foundation trenches, drains, pipes, cables etc. ( Not exceeding 1.5 mtr in width or 10 sqm. on plan) incl. dressing of sides and ramming of bottoms, lift upto 1.5 mtr.incl. getting out excavated soil and disposal of surplus soil as directed within a lead of 50 mtr. All kinds of soil @ 80%

362.82

-

262.7

... More
Ordinary Rock @ 10%

45.35

-

493.5

... More
Hard Rock (Blasting Prohibited) @ 10%

45.35

-

1196.05

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level 1:5:10 ( 1 cement :5 fine sand :10 graded stone aggregate 40 mm nominal size ) Nallah incl. carriages

85

-

4826.5

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

233

-

4774.46

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

7.8

-

9821.85

... More
Reinforcement for RCC work including straightening,cutting bending, placing in position and binding all complete upto plinth level Thermo Mechanical Treated bars.

1560

-

123.2

... More
Random Rubble Masonry with hard stone from Nallah in foundation & plinth including levelling up with cement concrete 1:6:12 ( 1 cement :6 coarse sand :12 graded stone agg.20 mm nominal size ) at plinth level with Cement mortar 1:6( 1 cement : 6 coarse sand) Incl. Carriages (labour rate)

590

-

4589.85

... More
Centring and shuttering including strutting propping etc. and removal of form for :Foundations, footings, bases of columns etc for mass concrete Foundations, footings, bases of columns etc for mass concrete

243

-

286.35

... More
9.2 Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

20.48

-

628.95

... More
Centring and shuttering including strutting propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms.

24

-

718.2

... More
Centring and shuttering including strutting propping etc. and removal of form Edges of slabs and breaks in floors and wallsabove 20cm wide

228.6

-

1145.1

... More
Providing and laying damp proof course 50 mm thick with cment concrete 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size ( Crushed )

228

-

420.35

... More
Hand packing stones in wire-crates, including cost of crates and excluding cost of stones.

329

-

1123.46

... More
Dumping stone In Horizontal on level exculuding cost of stones. [Labour rate]

450

-

237.9

... More
Filling available excavated earth (excluding rock) in trenches plinth, sides of foundation etc. Layers not exceeding 20 cm in depth,consolidating each deposited layer by ramming and watering lead up to 50 m and lift upto 1.50 M

100

-

221.35

... More
Providing and Laying non- pressure NP2 class ( light duty ) RCC pipes with collars , jointed with stiff mixture of cement mortar in proportion of 1:2 ( 1cement : 2 fine sand) including testing OF joints complete 900 mm dia of RCC pipes

60

-

2900.8

... More
Carriages Mulba/earth avg.2 km by MT

16469

-

184.3

... More
Aggregate below 40 mm avg. lead 80 km by MT

238.13

-

1072.34

... More
Sand avg. lead 192 km by MT

273.2

-

2308.92

... More
Stone avg. lead 10 km by MT

1272.42

-

328.31

... More
Hume pipe avg. lead 105 km by MT

60

-

676.37

... More
Cement avg. lead 5 km by MT

84.95

-

178.43



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.