Public Works Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date15 Apr 2025
Closing Date22 Apr 2025
Tender Amount₹ 1,75,000 
Notes
Download

Costs

Summary

Annual Stage Contract For Flood Restoration/ Preparedness Work Of Different Nallahs (kanzalwan Bagtore Nallah Etc) /river Of Bagtore Sector Of Tulail Sector Infc Sub Division Gurez During And After Floods For The Year 2025-26.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
b)Ordinary rock

1

392

392.8

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

218

218.4

... More
Hand-packing stones in wire-crates; excluding cost of crates and incl cost of stones

1

1071

1071.15

... More
Add cost of B.A.wire crates 4''×4'' mesh,16'×16' size

1

258

258

... More
Dumping stone including cost of stones. In Horizontal on level

1

937

937.9

... More
Slip clearance; In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.

1

331

331.15

... More
In ordinary soils disposal lead upto 50 m and lift upto 1.5 m

1

154

154.15

... More
P/L of EC bags filled with earth or sand with stiching,sewing all carriages comlete job

1

60

60

... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete 600mm

1

1751

1751.8

1

1148

1148.6

1

837

837.55

1

746

746.2

... More
Hire charges of vehicle during day or night alongwith licensed comercial driver for site inspection/ movement of officials within jurisdiction including Driver and POL on need basis only. Upto 60Km Journey

1

3500

3500

... More
Upto 120Km Jounney

1

7000

7000

... More
Hiring charges of Cutting saw machine(wood cutter) incl fuel,labour all complete job

1

1600

1600

... More
Engagement of Labour

1

700

700

... More
Hire charges of J.C.B including fuel, driver and Crawling charges etc complete job Running charges

1

2000

2000

... More
Hire charges of Chain Mounted Earth moving equipment LNT etc including fuel ,driver and Crawling charges etc complete job

1

3000

3000

... More
Hire charges of Tippers including fuel, driver etc Running Charges

1

6000

6000

... More
Hire charges of Tractors including fuel, driver etc complete job Running Charges

1

3000

3000

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30cm girth upto and including 60cm girth.

1

379

379.05

... More
Beyond 60cm girth upto and including 120cm girth

1

1683

1683

... More
Carriage of material by Mechnical including loading, unloading, stacking etc Crates upto 1 km

1

343

343.32

1

393

393.17

1

442

442.23

1

489

489.56

1

535

535.3

... More
Beyond 5 Km upto 10 km /km

1

41

41.77

... More
Beyond 10 Km upto 20 km /km

1

34

34.9

... More
Beyond 20 km /every additional Km

1

29

29.43

... More
Stones upto 1 km

1

151

151.47

1

173

173.46

1

195

195.1

1

215

215.98

1

236

236.16

... More
Beyond 5 Km upto 10 km /km

1

18

18.43

... More
Beyond 10 Km upto 20 km /km

1

15

15.4

... More
Beyond 20 km /every additional Km

1

12

12.98

... More
Earth upto 1 km

1

160

160.93

1

184

184.3

1

207

207.3

1

229

229.48

1

250

250.42

... More
Beyond 5 Km upto 10 km /km

1

19

19.58

... More
Beyond 10 Km upto 20 km /km

1

16

16.36

... More
Beyond 20 km /every additional Km

1

13

13.8

... More
R.C.C spun pipes 600 mm 1 km

1

4618

4618.94

1

5292

5292.95

1

5956

5956.33

1

6596

6596.48

1

7215

7215.29

... More
Beyond 5 Km upto 10 km /km

1

565

565.43

... More
Beyond 10 Km upto 20 km /km

1

473

473.06

... More
Beyond 20 km /every additional Km

1

399

399.56

... More
450 mm 1 km

1

3079

3079.3

1

3528

3528.63

1

3970

3970.89

1

4397

4397.66

1

4810

4810.19

... More
Beyond 5 Km upto 10 km /km

1

376

376.95

... More
Beyond 10 Km upto 20 km /km

1

315

315.37

... More
Beyond 20 km /every additional Km

1

266

266.37

... More
300 mm 1 km

1

1319

1319.7

1

1512

1512.27

1

1701

1701.8

1

1884

1884.71

1

2061

2061.51

... More
Beyond 5 Km upto 10 km /km

1

161

161.55

... More
Beyond 10 Km upto 20 km /km

1

135

135.16

... More
Beyond 20 km /every additional Km

1

114

114.16

... More
250 mm 1 km

1

1067

1067.71

1

1223

1223.51

1

1376

1376.85

1

1524

1524.83

1

1667

1667.87

... More
Beyond 5 Km upto 10 km /km

1

130

130.7

... More
Beyond 10 Km upto 20 km /km

1

109

109.35

... More
Beyond 20 km /every additional Km

1

92

92.36

... More
Carriage of material by Manual Means from dumping site /road site to actual site of work including loading, unloading, stacking etc RCC spun pipes First 50 metres 600mm

1

4379

4379.25

1

3981

3981.14

1

1794

1794.77

1

1434

1434.25

... More
for every additional (50 metres) 600mm

1

642

642.61

1

584

584.19

1

263

263.36

1

210

210.46

... More
Stone For First 50 Mtrs

1

236

236.08

... More
for every additional 50 mtrs

1

50

50.97

... More
Crates For First 50 Mtrs

1

146

146.51

... More
for every additional 50 mtrs

1

21

21.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.