Public Health Engineering Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Health Engineering Department - PHED Tender

Civil And Construction
Civil Works Others
Eprocure
Opening Date11 Mar 2023
Closing Date17 Mar 2023
Tender Amount₹ 47,69,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Construction of 1.40 lac gal SR and Sluice Chamber WSS Srandoo Bogund under NABARD
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying of dry stone soling tightly packed on horizantal levels

36.23

-

616.4

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8(1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

36.23

-

4861.83

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:1.5:3(1 cement : 1.5 coarse sand : 3 graded stone aggregate 40 mm nominal size)

67

-

7800.76

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

44.68

-

9408.13

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1;1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

9.35

-

9849.34

... More
Reinforced cement concrete work in arches, archribs, domes, vaults shells, folded plate and roofs having slope more than 15° upto floor five level level including curing but excluding the cost of centering, shuttering finishing and reinforcement with: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

28.05

-

10404.51

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m

175.52

-

198.7

... More
Centering and shuttering including strutting, propping etc. and removal of form for: Foundation

16.59

-

262.3

404.73

-

573.85

45.52

-

502.85

... More
Suspended floors, roofs, landings, balconies and access platforms

48.41

-

635.6

... More
Arches, domes, vaults BEYOND 6 mts

224.52

-

3095.25

... More
Extra for shuttring in circulae works Foundation

3.05

-

52.46

72.07

-

114.77

9.1

-

100.57

... More
12mm Cement plaster finished with a floating coat of neat cement of mix 1 : 3 ( 1 cement : 3 fine sand)

373.76

-

343.75

... More
12mm Cement plaster of mix 1 : 4 ( 1 cement : 4 fine sand)

465.21

-

260.05

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more

11926

-

87.17

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete for ( lid , ladder and ventilators)

150

-

102.13

... More
pumping out water caused by springs , tiled or river seepage, broken water mains or drains and the like

228

-

155.55

... More
carriage of materials from source to dumping site by mechanical transportcement and steel for avg lead of 20 km

84.66

-

342.08

... More
sand and 20 mm agg for avg lead of 20 km

228.35

-

384.8

... More
40 MM agg avg lead of 20 km

32.61

-

418.28

... More
stone soling for avg lead of 10 km

36.23

-

316.05

... More
carraige of materials from dumping site upto actual site by manual labour. For avg lead 500 mtr cement and steel

84.66

-

269.83

... More
sand /20 / 4o mm agg

260.96

-

594.19

... More
stone soling

36.23

-

699.02



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.