Public Health Engineering Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Health Engineering Department - PHED Tender

Civil And Construction
Pipe Line Project
Water Storage And Supply
Eprocure
Opening Date4 May 2020
Closing Date13 May 2020
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Maintenance/ Improvement/ Repair / laying and fitting of pipes for extension / restoration of water supplies of various WSS in Bari-Brahmana Town Section
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ii)    Water Bound Macadam Road.

1

-

74.3

... More
Dismantling tile work in floors and roof laid in cement mortar including stacking material with in 50 Meteres lead a)    For Thickness of tiles 10 mm to 25 mm

1

-

28.75

... More
b) For thickness of tiles above 25 mm and upto 40 mm.

1

-

46

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material in with 50 mtrs lead a)    1: 3: 6 or richer mix.

1

-

813.85

... More
b)    1:4:8 Leaner mix.

1

-

501.9

... More
Laying and fitting of GI pipes complete excluding cost of pipes and earth work a)    15 mm dia

1

-

12.25

... More
b)    20 mm dia.

1

-

13.05

... More
c)    25 mm dia

1

-

19.4

... More
d)    32 mm dia.

1

-

20.25

... More
e)    40 mm dia.

1

-

26.6

... More
f)     50 mm dia.

1

-

27.75

... More
g)    65 mm dia.

1

-

47.15

... More
h)   i) 80 mm dia ( L )

1

-

48.65

... More
ii) 80 mm dia ( M )

1

-

51.1

... More
   i) 100 mm dia ( L )

1

-

71.65

... More
ii)100 mm dia ( M)

1

-

75.35

... More
     i) 150 mm dia ( L) (Rate to be quoted by the contractor)

1

-

-

... More
ii)150 mm dia ( M) (Rate to be quoted by the contractor)

1

-

-

... More
Laying S & S centrigugaly cast (Spun) Ductile Iron/ MS Pipe. a)    100 mm dia D.I. Class K-7 pipes (Rate to be quoted by the contractor)

1

-

-

... More
b)    150 mm dia D.I. Class K-7 pipes (Rate to be quoted by the contractor)

1

-

-

... More
c)    200 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
d)    250 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
e)    300 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
f)     350 mm dia. (Rate to be quoted by the contractor)

1

-

-

... More
g)    400 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
h)   450 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
i)     500 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
j)      600 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
Fabrication of joints GI/ DI/ MS (complete Job) and involves the following items., Earth work excavation, Cutting of pipes with hack-saw, Refilling of excavated earth 90% Earth work item, Disposal of unserviceable material within 500 m by head load, Demolition of concrete/ Tiles/ Bituminious / WBM a)  25 mm dia to 50 mm dia. (Rate to be quoted by the contractor)

1

-

-

... More
b)    65 mm dia to 100 mm dia. (Rate to be quoted by the contractor)

1

-

-

... More
c)    125 mm dia to 150 mm dia. (Rate to be quoted by the contractor)

1

-

-

... More
d)    200 mm dia. (Rate to be quoted by the contractor)

1

-

-

... More
e)    250 mm dia. (Rate to be quoted by the contractor)

1

-

-

... More
f)     300 mm dia. (Rate to be quoted by the contractor)

1

-

-

... More
g)    350 mm to 450 mm dia. (Rate to be quoted by the contractor)

1

-

-

... More
h)   500 mm to 600 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
Dismantling GI pipes (External work) including excavation and refilling after taking out the pipes, manually/ by mechanical means including stacking of pipes with in 50 Mtrs lead., a) 15mm to 40 mm dia nominal bore

1

-

52.65

... More
b)    Above 40 mm nominal bore.

1

-

59.3

... More
Dismantling CI pipes including excavation and refilling trenches after taking out the pipes manually by mechanical means breaking lead caulked joints, melting of lead and making into blocks including stacking of pipes and lead at site with 50 Mtrs lead as per direction of Engineer incharge a)    Upto 150 mm dia..

1

-

193.55

... More
b)     Above 150 mm to 300 mm dia/

1

-

246.95

... More
c)    Above 300 mm dia.

1

-

311

... More
Providing lead caulked joints to spun iron or C.I and specials including testing of joints but excluding the cost of pig lead a)    100 mm dia.

1

-

202.05

... More
b)    125 mm dia.

1

-

296

... More
c)    150 mm dia.

1

-

301.75

... More
d)    200 mm dia.

1

-

400.8

... More
e)    250 mm dia

1

-

500.8

... More
f)     300 mm dia.

1

-

604.55

... More
g)    400 mm dia.

1

-

813.85

... More
h)   450 mm dia.

1

-

910.35

... More
i)     500 mm dia.

1

-

964

... More
j)      600 mm dia.

1

-

1298.4

... More
Filling available excavated earth (excluding rock ) in trenches, plinth sides of foundation etc. Layers not exceeding 20 cm in depth, consolidating each deposited layers lead upto 50 M and lift upto 1.5 M

1

-

85.25

... More
Disposal of surplus excavated earth complete Job upto 1 Km by Mech Transport ( Carriage)

1

-

106.29

... More
Chequrred precast cement concrete tiles 22 mm thick in footpath and courtyard jointed with neat cement slurry mixed with pigment to match the shade of tiles including rubbing and clearing etc. complete on 20 mm thick bed of cement mortar 1: 4 (1 cement: 4 coarse sand) excluding cost of tiles. a)    Ordinary cement without any pigment,

1

-

289.9

... More
Supply of Fitter/ Mazdoor/ Mason etc. i)     Supply of Fitter ( 2nd class)

1

-

400

... More
ii)            Supplyof Labour (Mazdoor)

1

-

300

... More
iii)           Supply of Masson a) Ist Class

1

-

500

... More
iv)           2nd Class

1

-

450

... More
Push on joints to centrifugally (spun) cast- Iron pipes or Ductile Iron Pipes including testing but excluding the cost of rubber gasket ( Labour rate only) a)    100 mm dia.

1

-

26.72

... More
b)    150 mm dia.

1

-

50.52

... More
c)    200 mm dia.

1

-

67.36

... More
d)    250 mm dia.

1

-

84.2

... More
e)    300 mm dia.

1

-

101.05

... More
f)     350 mm dia.

1

-

101.05

... More
g)    400 mm dia.

1

-

134.73

... More
h)   450 mm dia.

1

-

151.58

... More
i)     500 mm dia.

1

-

160

... More
j)      600 mm dia

1

-

219.95

... More
Laying in position S & S or flanged CI special such as Tees bends, collars, tappers and caps etc (excluding cost of specials).

1

-

244.7

... More
Locating/ Tracing of blockages/ leakages including excavation of pits.

1

-

300

... More
Carriage of department material from Divisional store to site of work average distance 10 Kms by Mechanical Transport (Paid as per actual distance in volved at site shall be paid as per S.S. of rates 2012). a)    G.I.Pipe and fitting.

1

-

152.71

... More
b)    Cement

1

-

152.71

... More
c)    Steel.

1

-

152.71

... More
Carriage of pipe avg. 10 Kmt by M T Ductile Iron/ M.S.Pipes/ j)      100 mm dia.

1

-

3.76

... More
ii)            150 mm dia.

1

-

6.26

... More
iii)           200 mm dia.

1

-

10.18

... More
iv)           250 mm dia.

1

-

14.47

... More
v)            300 mm dia

1

-

17.88

... More
vi)           350 mm dia

1

-

25.03

... More
vii)         400 mm dia.

1

-

34.14

... More
viii)        450 mm dia

1

-

41.72

... More
ix)           500 mm dia

1

-

41.72

... More
x)            600 mm dia

1

-

62.59

... More
Carriage of Departmental material from stacking place to site of work average 200 Mtrs by Head Load ( Paid as per actual distance involved at site) a)    G.I.Pipe and fitting.

1

-

99.39

... More
b)    Cement

1

-

78.82

... More
c)    Steel.

1

-

169.31

... More
Replacement of C.I sluice valves/Check valves complete with bolts,nuts,rubber insertions etc.(sluice valves/Check valves to be supplied by the Department) 200mm dia (Rate to be quoted by the contractor)

1

-

-

... More
150 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
100 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
80 mm dia (Rate to be quoted by the contractor)

1

-

-

... More
65mm dia (Rate to be quoted by the contractor)

1

-

-

... More
50mm dia (Rate to be quoted by the contractor)

1

-

-

... More
Fixing /Replacement of GM Gate valves/Brass stop cocks complete(Gate valves/stop cocks toi be supplied by the department) including bends,collars,unions and other allied items 150mm dia (Rate to be quoted by the contractor)

1

-

-

... More
100mm dia (Rate to be quoted by the contractor)

1

-

-

... More
80mm dia (Rate to be quoted by the contractor)

1

-

-

... More
65mm dia (Rate to be quoted by the contractor)

1

-

-

... More
50mm dia (Rate to be quoted by the contractor)

1

-

-

... More
40mm dia (Rate to be quoted by the contractor)

1

-

-

... More
25mm dia (Rate to be quoted by the contractor)

1

-

-

... More
20mm dia (Rate to be quoted by the contractor)

1

-

-

... More
Making connection of G.I distribution branch with G.I main of following sizes by providing and fixing Tee,including cutting and threading the pipe etc. complete 25 to 40mm nominal bore

1

-

403.65

... More
50 to 80mm niminal bore

1

-

1022.15

... More
Carriage of D.I/M.S pipe from stacking site of work avg. 200 mtr by head load. Ductile Iron/ MS Pipes. i)      100 mm dia.

1

-

2.69

... More
ii)            150 mm dia.

1

-

3.78

... More
iii)           200 mm dia.

1

-

5.67

... More
iv)           250 mm dia

1

-

9.98

... More
v)            300 mm dia.

1

-

12.48

... More
vi)           350 mm dia.

1

-

17.85

... More
vii)         400 mm dia.

1

-

20.77

... More
viii)        450 mm dia and 500 mm dia.

1

-

27.7

... More
ix)           600 mm dia ,700 mm dia , 750 mm dia and 800 mm dia.

1

-

30.47

... More
Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth upto 30 cm measured at height of 1 M above ground level and removal of rubbish upto 1 distance of 50 m outside the periphery of the area cleared.

100

-

585.4

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.

1

-

81.85

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-all work upto plinth level 1:3:6 (1 cement: 3 coarse sand 6 Graded stone aggregate of 20 mm nominal size) (Crushed)

1

-

3707.4

... More
Demolishing dry brick pitching in floors,drains etc. including stacking serviceable material and disposal of unserviceable material with in 50 meters lead

1

-

440.65

... More
Dry brick on edge flooring with bricks of class designation 75 on a bed of 12mm mud mortar including filling joints with sand( with F.P.S bricks)

1

-

505.1

... More
Brick work with common burnt clay FPS (non-modualar) bricks of class designation 75 in foundation and plinth in: a)    Cement Mortar 1:4 (1 cement : 4 coarse sand)

1

-

4845.9

... More
b) Cement mortar 1: 6 (1 cement: 6 coarse sand)

1

-

4551.45

... More
Half Brick masonry with bricks of class designation 75 in foundation and plinth in:- Cement Mortar 1:4 (1 cement : 4 coarse sand)

1

-

573.8

... More
Providing and laying in position cement concrete excluding the cost of centring , shuttering, finishing all work upto plinth level (1: 4: 8) 1. Cement : 4 coarse sand 8 Graded stone aggregate 40mm nominal size) crushed.

1

-

3112.8

... More
Dry stone pitching 225 mm thickness including cost of stone and preparation of surface “Nallah”.

1

-

116.4

... More
Dry stone pitching (any thickness) excluding cost of stones:- a) On Horizontal

1

-

260.4

... More
b) On Top copings of banks

1

-

338.6

... More
c) On Slopes.

1

-

337.4

... More
Hand packing stones in wire-crates, excluding cost of crates and stones.

1

-

177.7

... More
Grouting of stone pitching using M-10 nominal mix concrete (max size of aggregate 20 mm nominal) @ 3.65 cum per 100 sqm on horizontal/ side slopes,complete including curing (Nallah)

1

-

124.65

... More
Dumping of stone (excluding cost of stone) in horizontal on level.

1

-

115.05

... More
supply of boulders (nallah) nominal size 225 mm (stack measurement reduced by 15%)

1

-

212

... More
Demolishing Brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. In cement mortar

1

-

687.55

... More
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 M (stacks of cleaned bricks shall be measured) from brick work in cement mortar,

1

-

2405.35

... More
Silt clearance from canals, inclusive of initial lead and lift (50 m and 1.5 m respectively a)Dry

1

-

52.25

... More
b)Wet

1

-

87.1

... More
Slip clearance in soils; mixed with moorum/ kankar/ shingle/ boulders, disposal lead upto 50 M and lift upto 1.5 M

1

-

158.95

... More
Carriage of sand, Bajri, stones bricks/ tiles from nearest source to site of work incl. loading, unloading and stacking complete (To be paid as per actual distance involved at site) a)   Sand average distance 10 Km by MT

1

-

171.78

... More
b)    Bajri above 40 mm average distance 10 Km by M.T.

1

-

186.73

... More
c)    Bajri Below 40 mm average distance 10 KM by M.T.

1

-

171.78

... More
d)    Stones average distance 10 Km by Mech. Transport.

1

-

202.11

... More
e)    Bricks average distance of 10 Km by Mech, transport.

1000

-

458.14

... More
f)     Tiles average distance of 10 km by Mech. Transport.

1000

-

274.88

... More
Carriage of material from stacking place to site of work average 200m by Head Load. a)    Sand.

1

-

156.25

... More
b)    Bajri below 40 mm.

1

-

156.25

... More
c)    Stone aggregate 40 mm and above.

1

-

168.92

... More
d)    Stones.

1

-

183.81

... More
e)    Bricks.

1000

-

291.61

... More
f)     Brick Tiles

1000

-

182.26

... More
Carraige of Alum from site of stacking up to bed of filtration plant.

700

-

300



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.