Public Health Engineering Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Health Engineering Department - PHED Tender

Civil And Construction
Eprocure
Opening Date21 Sep 2022
Closing Date29 Sep 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
03 Km

1

1287

1287.3

... More
04 Km

1

1678

1678.5

... More
Carriage of Cement from nearest source to site of work by Mechanical Transport for an average distance of 05 Km.

1

159

159.44

... More
Carriage of Cement from road side to site of work by manual labor for an average distance of 01 Km.

1

400

400.4

... More
02 Km

1

710

710.6

... More
03 Km

1

1020

1020.8

... More
04 Km

1

1331

1331

... More
Carriage of sand from source to road side of work by mechanical transport for an average distance of 15 km including loading unloading and stacking.

1

297

297.02

... More
Carriage of Sand from road side to site of work by manual labor for an average distance of 4 Km.

1

937

937.58

... More
02 Km

1

1732

1732.38

... More
03 Km

1

2527

2527.18

... More
04 Km

1

3321

3321.98

... More
Carriage of 20mm stone aggregate from source to road side of work by mechanical transport for an average distance of 08 km including loading unloading and stacking.

1

218

218.28

... More
Carriage of 20mm stone aggregate from road side to site of work by manual labor for an average distance of 01 Km.

1

937

937.58

... More
02 Km

1

1732

1732.38

... More
03 Km

1

2527

2527.18

... More
04 Km

1

3321

3321.98

... More
Carriage of 40mm stone aggregate from source to road side of work by mechanical transport for an average distance of 08 km including loading unloading and stacking.

1

237

237.26

... More
Carriage of 40mm stone aggregate from road side to site of work by manual labor for an average distance of 01 Km.

1

1013

1013.56

... More
02 Km

1

1872

1872.76

... More
03 Km

1

2731

2731.96

... More
04 Km

1

3591

3591.16

... More
Carriage of stone from source to road side of work by mechanical transport for an average distance of 05 km including loading unloading and stacking.

1

211

211.02

... More
Carriage of stone from road side to site of work by manual labor for an average distance of 01 Km.

1

1102

1102.98

... More
02 Km

1

2037

2037.98

... More
03 Km

1

2972

2972.98

... More
04 Km

1

3907

3907.98

... More
Dismentling manually/Machanically includind stacking of serviceable material and disposal of Unserviceable material with in 50m lead as per direction of Engineer in charge Bituminous road

1

278

278.25

... More
Water Bound Macadom road.

1

142

142.15

... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc.(not exceeding 1.5 mtr in width ) and for shafts , wells, cesspits, and the like not exceeding 10 sqm on plan , depth up to 1.5mtr including disposal of excavated earth up to 1 mtr from cutting edge , disposed earth is to be leveled and neatly dressed. 100% all kinds of soil.

1

436

436

... More
Providing and Laying & S&S Centrifugally cast (Spum) ductil iron pipesconfrming to IS 8329 100mm dia Ductile iron class K-7 Pipe

1

1108

1108.15

... More
150mm dia Ductile iron class K-7 Pipe

1

1581

1581.25

... More
200mm dia Ductile iron class K-7 Pipe

1

1947

1947

... More
250mm dia Ductile iron class K-7 Pipe

1

2504

2504.8

... More
300mm dia Ductile iron class K-7 Pipe

1

3129

3129.2

... More
100mm dia Ductile iron class K-9 Pipe

1

1067

1067.15

... More
150mm dia Ductile iron class K-9 Pipe

1

1603

1603.15

... More
200mm dia Ductile iron class K-9 Pipe

1

2196

2196

... More
250mm dia Ductile iron class K-9 Pipe

1

3061

3061.35

... More
300mm dia Ductile iron class K-9 Pipe

1

3827

3827.85

... More
Providing push on joints to centrifugally (Spun) cast iron pipes or ductile iron pipes including testing of joints and including the cost of rubber gastet 100mm dia Pipe

1

89

89.7

... More
150mm dia Pipe

1

144

144.7

... More
200mm dia Pipe

1

213

213

... More
250mm dia Pipe

1

259

259.9

... More
300mm dia Pipe

1

340

340.25

... More
Providing Lead caulked joints to spun iron or C.I pipes and specials including testing of joints but excluding the cost of lead pig 100mm dia Pipe

1

358

358.25

... More
150mm dia Pipe

1

536

536.55

... More
200mm dia Pipe

1

713

713.45

... More
250mm dia Pipe

1

891

891.25

... More
300mm dia Pipe

1

1072

1072.45

... More
Providing flanged joints to double flanged C.I/D.I pipes and specials including testing to joints 80 mmdia pipes

1

164

164.85

... More
100 mmdia pipes

1

261

261.25

... More
150 mmdia pipes

1

330

330.85

... More
200 mmdia pipes

1

369

369.65

... More
250 mmdia pipes

1

520

520.95

... More
300 mmdia pipes

1

541

541

... More
Providing and fitting of G.I. Pipes complete with G.I fitting excliding trenching & refilling etc.(external work) 150 mm dia nominal bore (Medium)

1

2167

2167.65

... More
100 mm dia nominal bore (Medium)

1

1234

1234.95

... More
80 mm dia nominal bore (Medium)

1

840

840

... More
65 mm dia nominal bore (Medium)

1

711

711.7

... More
50 mm dia nominal bore (Medium)

1

539

539.35

... More
40 mm dia nominal bore (Medium)

1

418

418.8

... More
32 mm dia nominal bore (Medium)

1

360

360.9

... More
25 mm dia nominal bore (Medium)

1

298

298.15

... More
20 mm dia nominal bore (Medium)

1

204

204.45

... More
15 mm dia nominal bore (Medium)

1

163

163.55

... More
Dismantlin G.I pipes (external work) including excavation and refilling tranches after taking out the pipes manually /by mechanical means including stacking of pipes with in 50 m lead Above 40 mm dia nominal bore

1

110

110.65

... More
15 mm to 40 mm dia nominal bore

1

99

99.75

... More
Providing and fixing ofG.I Union in G.I Pipes including cutting and threadind the pipes and making long serews etc.complete new work 80 mm dia nominal bore

1

985

985.25

... More
65 mm dia nominal bore

1

886

886.25

... More
50 mm dia nominal bore

1

648

648.1

... More
40 mm dia nominal bore

1

492

492.3

... More
32 mm dia nominal bore

1

409

409.35

... More
25 mm dia nominal bore

1

355

355.85

... More
20 mm dia nominal bore

1

315

315.7

... More
Laying and fitting of G.I. Pipes (all classes)complete excliding costof pipes,fitting and earth work 150 mm & 100 mm dia G.I pipes

1

107

107.7

... More
80 mm & 65 mm dia G.I pipes

1

73

73.05

... More
50 mm & 40 mm dia G.I pipes

1

40

40.8

... More
32 mm & 25 mm dia G.I pipes

1

30

30.65

... More
15mm & 20 mm dia G.I pipes

1

20

20.25

... More
Providing and fixing of G.I Union in existing G.I Pipes line cutting and threadind the pipes and making long serews including excavation refilling the earth or cutting of wall and making good the same complete wherever required. 80 mm dia nominal bore

1

1481

1481.35

... More
65 mm dia nominal bore

1

1382

1382.35

... More
50 mm dia nominal bore

1

1144

1144.2

... More
40 mm dia nominal bore

1

856

856.1

... More
32 mm dia nominal bore

1

773

773.15

... More
25 mm dia nominal bore

1

719

719.65

... More
20 mm dia nominal bore

1

679

679.5

... More
Returning/Refilling the available excavated soil as required in Layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming ,watering etc

1

163

163.95

... More
Providing and laying in position cement concrate of specified grade including curing but excluding the cost of centring and shuttering -ALL work upto plinth level with (1:3:6)

1

4943

4943.4

... More
Random rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1:6:12( 1 cement : 6 coarse sand : 12 graded stone aggregate; 20mm normal size) at plinth level with cement mortar 1: ) 1 cement: 6 coarse sand.

1

4435

4435.25

... More
Welding including transportation of plant at site etc.Complete By gas plant

1

12

12.85

... More
by electric plant

1

6

6.15

... More
Clearing snow (with frost) from Roads.manually using picks and shovels; snow depth upto 150 mm

1

3

3.65

... More
Providing and fixing gun metal gate valve with C.I wheel of approved quality (screwed end) 80 mm nominal bore

1

2406

2406.65

... More
65 mm nominal bore

1

1568

1568.85

... More
50 mm nominal bore

1

942

942.75

... More
40 mm nominal bore

1

704

704.7

... More
32 mm nominal bore

1

617

617.8

... More
25 mm nominal bore

1

543

543.85

... More
Slit Clearance from S/R Inclusive if Initial lead and lift (50m & 1.5m respectively) Wet

1

168

168.25

... More
Dismantling Old Plaster or Skirting, ranking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50m lead.

1

35

35.35

... More
Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 meter lead as per direction of Engineer-in-Charge.

1

84

84.95

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge: 1:3:6 or richer mix (i/c equivalent design mix)

1

1569

1569.2

... More
Labour and fitter required for rethreading, straightening etc. Labour Rate

1

503

503

... More
Fitter Rate

1

733

733

... More
Carriage of Surplus material for an average distance of 05Km by Mechanical Transport

1

179

179.37

... More
Finishing walls with water proofing cement paint of required shade old work (one or more coats applied @ 2.20 Kg/10 Sqm) Complete qtty vide item no: 8B and 10

1

59

59.7



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.