Public Health Engineering Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Public Health Engineering Department - PHED Tender

Civil And Construction
Pipe Line Project
Eprocure
Opening Date9 Sep 2022
Closing Date10 Oct 2022
Tender Amount₹ 58,42,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

2873.76

-

198.7

... More
Providing and laying hand packed stone soling 50 mm nominal size including filling, spreading, dressing, ramming, all leads lifts and all carriages complete.

12.26

-

1320

... More
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

8.18

-

4861.84

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

21.53

-

7800.76

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

26.78

-

9408.14

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with:

10.08

-

9849.35

... More
Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete.

12.59

-

262.3

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

275.61

-

573.85

... More
Suspended floors, roofs, landings, balconies and access platforms.

61.7

-

635.6

... More
Extra for shuttering in circular work (20% of respective centering and Shuttering items)Foundations, footings, bases of columns etc. for mass concrete.

8.95

-

52.46

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

147.03

-

114.77

... More
Lintel, beams, plinth beams, girders, bressumers and cantilevers.

50.24

-

100.57

... More
Providing and mixing water proofing material in cement concrete work in doses by weight of cement as per manufacturer’s specification. (1 kg of water proofing material in 50 kg of cement)

475.46

-

57.9

... More
Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete upto plinth level.TMT bars

4712.98

-

87.18

... More
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand)

4.15

-

7111.31

... More
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level

4.15

-

1522.2

... More
RANDOM RUBBLE MASONRY Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: (Quarry Stone)Cement mortar 1:6 (1 Cement : 6 coarse sand)

15.9

-

4435.25

... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately):first class kail wood

0.67

-

106894.15

... More
Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. first class kail wood

15.66

-

2784.1

... More
PROVIDING/ FIXING OF WIRE GAUGE SHUTTERS 35MM THICK FOR DOORS AND WINDOWS (KAIL WOOD)

9.24

-

3651.65

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.welded

3234

-

102.14

... More
Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturers) of 1st quality conforming to IS: 15622 of approved make, laid on 20 mm thick bed of cement mortar 1: 4 ( 1 cement : 4 coarse sand) including skirting in vertical & pointing the joints with white cement and matching pigment etc., complete In colour such as White, Ivory, Grey, Fume, Red Brown (as dirrected by the engineer incharge)

17.15

-

1210.66

... More
12mm Cement plaster finished with a floating coat of neat cement of mix:1 : 3 ( 1 cement : 3 fine sand)

136.59

-

343.75

... More
1 : 4 ( 1 cement : 4 fine sand)

302.39

-

325.45

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.two or more coats on new work

27.66

-

121.95

... More
Providing corrugated G. S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (upto any pitch in horizontal/vertical or curved surface)excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.50 mm thick with zinc coating not less than 275 gram/m2

72.26

-

830.25

... More
Providing ridges or hips of width 60cm overall width plain G.S. sheets fixed with polymer coated J. or L hooks, bolts and nuts 8mm dia G.I. limpet and bitumen washers complete 0.50 mm thick with zinc coating not less than 275 gram/m2

27.08

-

626.7

... More
Providing and fixing plained eaves boarding. (II Class kail Wood)300x40 mm (nominal size)

30.34

-

998.85

... More
Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work.15 mm and 20 mm dia. G.I. pipes

1600

-

20.25

... More
25 mm and 32 mm dia. G.I. pipes

1000

-

30.65

... More
40 mm and 50 mm dia. G.I. pipes

1300

-

40.8

... More
Laying in position centrifugally cast (spun) iron S&S or flanged pipes

1075.05

-

245.55

... More
Providing push-on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket 100mm dia pipes

1134

-

89.7

... More
150mm Dia pipes

19

-

144.7

... More
Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete 25 to 40 mm nominal bore

60

-

666.25

... More
50 to 80 mm nominal bore

10

-

1268.25

... More
Providing and laying D.I. standard specials such as tees, bends, collars, tapers, caps etc. suitable for flanged jointing as per IS : 9523 (as per site requirement) upto 150 mm nominal bore

10

-

318.85

... More
Providing and fixing C.I. double acting air valve of approved quality 50mm dia with bolts, nuts, rubber insertions etc. complete (The tail pieces, tapers etc. if required will be paid separately).

2

-

5147.15

... More
Providing and fixing D.I. sluice valves (with cap) complete with bolts, nuts, rubber insertions etc. (the tail pieces if required will be paid separately). Confirming to IS:14846 read with latest amendments.100mm dia

4

-

13164

... More
Supply and filling of filter media from approved source - Gravel (Graded gravel - size ranging from 2.0mm to 40.00 mm) in filter beds. Including all carriages, complete job

17.57

-

7700

... More
Supply and filling of filter media from approved source - Sand (Coarse filter sand - in filter beds. Including all carriages, complete job

7.7

-

7968

... More
Engagement of labor for desilting of ssfp , Extracting of old choked filter media and relaying of servicible filter media after proper washing and grading

75

-

300

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - SAND: 5kms

55.3

-

206.28

... More
Beyond 5 km upto 10 km per km

55.3

-

74.58

... More
Beyond 10 km upto 20 km per km

55.3

-

121.44

... More
Beyond 20 km per additional km (25Kms)

55.3

-

49.68

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - Aggregate 20mm 5kms

65.93

-

206.28

... More
Beyond 5 km upto 10 km per km

65.93

-

74.58

... More
Beyond 10 km upto 20 km per km

65.93

-

121.44

... More
Beyond 20 km per additional km (25Kms)

65.93

-

49.68

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - Aggregate 40mm and above : 5kms

7.36

-

224.2

... More
Beyond 5 km upto 10 km per km

7.36

-

81.08

... More
Beyond 10 km upto 20 km per km

7.36

-

132.02

... More
Beyond 20 km per additional km (25Kms)

7.36

-

53.82

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - Stone Soling :5kms

28.16

-

242.67

... More
Beyond 5 km upto 10 km per km

28.16

-

87.75

... More
Beyond 10 km upto 20 km per km

28.16

-

142.83

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - Steel/ CGI Sheets:5kms

6.94

-

183.36

... More
Beyond 5 km upto 10 km per km

6.94

-

66.3

... More
Beyond 10 km upto 20 km per km

6.94

-

107.99

... More
Beyond 20 km per additional km (25Kms)

6.94

-

44.16

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - Cement: 5kms

40.04

-

183.36

... More
Beyond 5 km upto 10 km per km

40.04

-

66.3

... More
Beyond 10 km upto 20 km per km

40.04

-

107.99

... More
Carriage of materials by mechanical transport including loading, unloading, stacking of materials - Bricks: 5kms

1970

-

0.51

... More
Beyond 5 km upto 10 km per km

1970

-

1.99

... More
Beyond 10 km upto 20 km per km

1970

-

3.23

... More
Beyond 20 km per additional km (25Kms)

1970

-

1.33

... More
Carriage of G.I./D.I pipes below 100mm dia from Stocking yard to the site by mechanical means 5km

7.76

-

183.36

... More
Beyond 5 km upto 10 km per km

7.76

-

66.3

... More
Beyond 10 km upto 20 km per km (15Kms)

7.76

-

54

... More
Carriage of G.I/D.I. pipes 100mm dia from Stocking yard to the site by mechanical means 5kms

6800

-

4.5

... More
Beyond 5 km upto 10 km per km

6800

-

1.42

... More
Beyond 10 km upto 20 km per km (15Kms)

6800

-

1.33

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- (Sand) ist 50m

55.3

-

209.9

... More
Beyond Ist 50m 200Mtrs

55.3

-

137.1

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- Aggregate Below 40mm ist 50m

65.93

-

209.9

... More
Beyond Ist 50m 200Mtrs

65.93

-

137.1

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- Aggregate 40mm and Above ist 50m

7.36

-

226.92

... More
Beyond Ist 50m 200Mtrs

7.36

-

148.21

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- Stone Soling ist 50m

28.16

-

246.94

... More
Beyond Ist 50m 200Mtrs

28.16

-

161.29

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- Steel/CGI Sheets ist 50m

6.94

-

261.1

... More
Beyond Ist 50m 200Mtrs

6.94

-

114.95

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- Cement ist 50m

40.04

-

121.57

... More
Beyond Ist 50m 200Mtrs

40.04

-

53.51

... More
Carriage of materials by manual means including loading, unloading, stacking of materials- Brick ist 50m

1970

-

0.39

... More
Beyond Ist 50m 200Mtrs

1970

-

0.26

... More
Carriage of G.I./D.I pipes below 100mm dia from dumping site to actual site of work by manual means ist 50m

7.76

-

153.25

... More
Beyond Ist 50m 300Mtrs

7.76

-

112.47

... More
Carriage of G.I./D.I pipes 100mm dia from dumping site to actual site of work by manual means ist 50m

6800

-

4.14

... More
Beyond Ist 50m (1500Mtrs)

6800

-

17.63

... More
Restoration of Road Berm Along Pipe allignment to be damaged -1000 mts @ Rs 480/mt

100

-

480

... More
Restoration of W.B.M road at spots 1000 mt @ Rs 100/mt

100

-

1000

... More
Restoration of W.B.M road with 25 mm semidense 200 mts @ Rs 1280/mt

100

-

1280

... More
W.B.M road with butiminous mecadam & Semi Dense 500 mt @ 1580/m

100

-

1580

... More
Provision for Sanitary, plumbing and electricfication to existing quarter

1

-

100000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.