Public Health Engineering Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Public Health Engineering Department - PHED Tender
Eprocure
Opening Date25 Sep 2018
Closing Date3 Oct 2018
Tender Amount₹ 5,50,000
Costs
EMD
₹ 11,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_PHE_62402_3Bid Award Id
ViewTender No
09/PHE/RWSD/Civil-SHG of 2018-19Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://www.eproc.bihar.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Reinforced cement concrete work in walls (any thickness) incld. attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excld. cost of centring, shuttering, finishing and reinforcement: 1:1.5 :3 (1 cement : 1.5 coarse sand: 3 graded crushed stone agg. 20 mm nominal size)
10.3
-
6280.95
... More
Reinforcement for RCC work including straightening cutting, bending, placing in position and binding all complete. (T.M.T Bars).
876
-
71
... More
Centering and shuttering including strutting, propping etc and removal of form work for:
-
-
-
... More
Foundations, footings, basis of columns etc
23.32
-
179.25
... More
Walls (any thickness) incld. attached pilasters, buttresses, plinth and string courses etc
122
-
342.8
... More
Providing & laying in position cement concrete of specified grade excld. cost of centring & shuttering – All work upto plinth level:1:2:4 (1 cement : 2 coarse sand : 4 graded stone agg. 20 mm nominal size) Crushed
6.12
-
4575.5
... More
Providing/ laying & placing of Baramullah stones incld. carriages by Mech. transport and manual labour complete job.
16.88
-
-
... More
Providing and Shrouding of filter media sand & gravel incld. all carriages by Mechanical Transport and by manual labour in filter beds in layers as per prescribed and approved design and specifications complete job.
25.25
-
-
... More
Providing / fixing of 100 mm dia sluice valve Zoloto of approved quality incld. all accessories whatever be required at site with all carriages, complete job
3
-
-
... More
6 mm thick cement plaster finished with a floating coat of neat cement of mix 1:3 (1 cement: 3 fine sand).
83.76
-
130.25
... More
Carriage of materials from divisional store/source upto dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport.
-
-
-
... More
Cement & Steel for an avg. lead of 40 Kms
10.14
-
320.41
... More
Sand & Agg. 20mm for an avg. lead of 10 Kms
33.21
-
171.88
... More
Carriage of materials from dumping site of work to actual site of work, including loading, unloading and stacking etc. complete by manual labours for an avg. lead of 800 mtrs
-
-
-
... More
Cement
9.27
-
175.18
... More
Steel
0.87
-
376.31
... More
Sand & Agg.
33.21
-
403.21
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements