Public Health Engineering Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Public Health Engineering Department - PHED Tender
Eprocure
Opening Date5 Apr 2021
Closing Date20 Apr 2021
Tender AmountRefer Documents
Costs
EMD
₹ 12,000Document Cost
₹ 700Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_PHE_121758_8Bid Award Id
ViewTender No
E-NIT No.01 of 04/2021-22 dated 05-04-2021Tender Authority
Public Health Engineering Department ViewPurchaser Address
-Website
http://http://jkphedwaterbilling.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing CGS(Galvanized Corrogated steel) Sheets, including cutting to size and shape wherever required (a)0.80mm thick with zinc coating not less than 275 gram/sqm
1
-
1136.05
... More
Providing CGS(Galvanized Corrogated steel) Sheets, including cutting to size and shape wherever required (a)0.63mm thick with zinc coating not less than 275 gram/sqm
1
-
951.8
... More
supply and fixing of PVC pipe 100mm,150mm,200mm, 300mm dia
1
-
100
... More
Structural steel such as Tees,angles, channels , and RS Joists
1
-
4430
... More
Clearing jungle including uprooting of rank vegetation, gross, brush wood, trees and sapling of girth upto 30 cm measured at height of 1 metre of above ground level and removal of rubbish upto distance of 50 Metre outside the periphery of the area cleared.
1
-
5.85
... More
Demolishing cement concrete manually by mechanical means including disposal of material within 50 metres lead 1:3:6 or richer mix
1
-
1569.2
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Nallah
1
-
4943.4
... More
Hand pack stone filling in knitted crates, excluding cost of crates and stones
1
-
337.45
... More
Supply of stone Nallah
1
-
600
... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively) -Dry
1
-
100.95
... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively) -Wet
1
-
168.25
... More
Dismantling concrete grouted stone pitching in aprons, drains etc. including stacking of serviceable material & disposal of unserviceable material, stacking /disposal lead upto 100 metres
1
-
1397.05
... More
Slip Clearance in soils; mixed with moorum Kankar/shingle/ boulders; disposal lead upto 50 m and lift upto 1.5 m.
1
-
301.15
... More
Demolishing cement concrete manually by mechanical means including disposal of material within 50 metres lead 1:4:8 or leaner mix
1
-
968.3
... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of cantering. shuttering, finishing and reinforcement-All work upto plinth level 1:2"4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size)
1
-
5877.45
... More
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
1
-
78.55
... More
Carraige of stone by head load from local nallah to site of work [Extra carriage shall be paid only after verified by the concerned site Engineer/AEE] (1st 50M)
1
-
118.18
... More
Next 50 Mtr
1
-
46.75
... More
Disposal of excavated mulba average 5Km by MT and Av. 100Mtr by Head load wherever required [actual distance shall be verified by the JE Incharge/AEE]
1
-
446.47
... More
Filling of EC bags including stitching, shifting, placing in position and cost of EC Bags [Placing in Water]
1
-
16.8
... More
Filling of EC bags including stitching, shifting, placing in position and cost of EC Bags [Placing in Dry]
1
-
17.55
... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like [wherever required to be verified by the site Engineer/AEE]
1
-
81.85
... More
Supply of BA wire for binding of crates
1
-
50
... More
Random Rubble Masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement:6 Coarse Sand : 12 Graded stone aggregate 20mm nominal size) at plinth level with : I) Cement mortar 1:6 (1 Cement : 6 Coarse Sand
1
-
4400.5
... More
Dry Random Rubble Masonry with hard stone in foundation and plinth using nallah stone without bond stone
1
-
2355.95
... More
Filling available excavated earth (excluding rock) in trenches, plinth sides of foundation etc. Layers not exceeding 20 cm in depth, consolidated each deposited layers lead upto 50 M and lift upto 1.5 M
1
-
198.7
... More
Centring and shutter including strutting, propping etc and removal of forms for foundation, footing, bases of column etc for mass concrete
1
-
179.25
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering-all work upto plinth level 1:4:8 (1 cement: 4 coarse sand 8 Graded stone aggregate of 40 mm nominal size) (Crushed)
1
-
4419.85
... More
Carriage of Cement from road side to site of work 1st 150 M
1
-
133.26
... More
Next 50 Mtrs
1
-
19.56
... More
Carriage of Bajri from road side to site of work Ist 150 Mtrs
1
-
197.32
... More
Next 50 Mtrs
1
-
42.96
... More
Carriage of Sand from road side to site of work Ist 150 Mtrs
1
-
133.26
... More
Next 50 Mtrs
1
-
19.56
... More
Providing and laying DPC 40mm thick with cement concrete 1:2:4 ( 1 cement: 2 coarse sand : 4 graded stone aggregate),including curing complete
1
-
310.55
... More
Providing and laying DPC 50mm thick with cement concrete 1:2:4 ( 1 cement: 2 coarse sand : 4 graded stone aggregate),including curing complete
1
-
372.85
... More
Cement concrete flooring 1:2:4 ( 1 cement: 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate Nallah
1
-
505
... More
12mm Cement plaster of mix: 1 :4 mix ( 1 cement : 4 coarse sand) including curing complete
1
-
260.05
... More
Centring and shuttering including strutting, propping etc. and removal of form for Foundations: footings, bases of columns etc. for mass concrete
1
-
262.3
... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations
1
-
1158.15
... More
Note:- 1 If any item/items not advertised in the above rate list but found necessary to be executed at site. The same shall be paid as per SSR 2020 on Contractors Appreciation/Depreciation.
1
-
-
... More
Note:- 2 Any item either not advertised or nor provided in SSR 2020 shall be paid as per actual lowest market rates.
1
-
-
... More
Note:- 3 Any material found necessary to be used at site and is not reflected in SSR 2020 shall be of standard ISI Mark and shall be paid as per prevailing stock rates or lowest market rate whichever is lowest.
1
-
-